[go: nahoru, domu]

File:P5 Truss segment prepared for launch on STS-116.jpg

Original file (3,000 × 1,993 pixels, file size: 431 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

edit
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, an overhead crane moves the P5 truss for mission STS-116 to the payload canister. The truss will be transported to Launch Pad 39B where it will wait for installation in Space Shuttle Discovery’s payload bay. The third port truss segment, the P5 will be attached to the P3/P4 truss on the International Space Station during the 11-day mission. The window for launch of mission STS-116 opens Dec. 7.
Date Taken on 31 October 2006
Source
Author NASA/George Shelton
Permission
(Reusing this file)
No copyright protection is asserted for this photograph. If a recognizable person appears in this photograph, use for commercial purposes may infringe a right of privacy or publicity. It may not be used to state or imply the endorsement by NASA employees of a commercial product, process or service, or used in any other manner that might mislead. Accordingly, it is requested that if this photograph is used in advertising and other commercial promotion, layout and copy be submitted to NASA prior to release.
This image or video was catalogued by Kennedy Space Center of the United States National Aeronautics and Space Administration (NASA) under Photo ID: KSC-06PD-2404 and Alternate ID: KSC-06pd2404.

This tag does not indicate the copyright status of the attached work. A normal copyright tag is still required. See Commons:Licensing.
Other languages:

Licensing

edit
Public domain This file is in the public domain in the United States because it was solely created by NASA. NASA copyright policy states that "NASA material is not protected by copyright unless noted". (See Template:PD-USGov, NASA copyright policy page or JPL Image Use Policy.)
Warnings:

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current02:21, 18 November 2006Thumbnail for version as of 02:21, 18 November 20063,000 × 1,993 (431 KB)Bricktop (talk | contribs){{Information |Description=KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, an overhead crane moves the P5 truss for mission STS-116 to the payload canister. The truss will be transported to Launch Pad 39B where it will wait for ins

File usage on other wikis

The following other wikis use this file:

Metadata