File:Detail, date stone in belt course above keystone, east portal of Tunnel 22, view to southeast, 380mm lens with electronic flash fill. - Southern Pacific Railroad Natron Cutoff, HAER ORE,20-OAKR,1-5.tif

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file (5,000 × 3,899 pixels, file size: 18.59 MB, MIME type: image/tiff)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Detail, date stone in belt course above keystone, east portal of Tunnel 22, view to southeast, 380mm lens with electronic flash fill. - Southern Pacific Railroad Natron Cutoff, Tunnel 22, Milepost 581.85, Oakridge, Lane County, OR
Title
Detail, date stone in belt course above keystone, east portal of Tunnel 22, view to southeast, 380mm lens with electronic flash fill. - Southern Pacific Railroad Natron Cutoff, Tunnel 22, Milepost 581.85, Oakridge, Lane County, OR
Depicted place Oregon; Lane County; Oakridge
Date Documentation compiled after 1968
Dimensions 4 x 5 in.
Current location
Library of Congress Prints and Photographs Division Washington, D.C. 20540 USA http://hdl.loc.gov/loc.pnp/pp.print
Accession number
HAER ORE,20-OAKR,1-5
Credit line
This file comes from the Historic American Buildings Survey (HABS), Historic American Engineering Record (HAER) or Historic American Landscapes Survey (HALS). These are programs of the National Park Service established for the purpose of documenting historic places. Records consist of measured drawings, archival photographs, and written reports.

This tag does not indicate the copyright status of the attached work. A normal copyright tag is still required. See Commons:Licensing.

Notes
  • Significance: The Southern Pacific Railroad Cascade Route, built as the Natron Cutoff between Black Butte, California and Natron, Oregon was one of a series of major rebuildings and realignments of the original Central Pacific Railroad. Begun in 1905 under railroad magnate E.H. Harriman to replace the original Central Pacific route over the Siskiyou Mountains into Oregon, the Natron Cutoff had to overcome both natural and political obstacles. Stalled by government anti-trust lawsuits against Harriman, by World War I and the ensuing federal takeover of the nation's railroads, the Natron Cutoff finally overcame the rugged Cascade Mountains of Oregon to reach completion in 1927, at an ultimate cost of nearly $40 million. For the purpose of the current project, the Natron Cutoff was found likely to be eligible for the National Register of Historic Places at the state level of significance under Criterion A for its significance in engineering, transportation history, and the economic history of central Oregon, and in the development of the West, and under criterion B for its association with E.H. Harriamn. The Natron Cutoff's period of significance is 1905 to 1945, from the beginning of construction in 1905, through the years of its role in the economic development of the central Oregon, to the conclusion of the railroad's achievements in World War II. Built in 1910, Tunnel 22 is a contributive element of this property.
  • Survey number: HAER OR-94
Source https://www.loc.gov/pictures/item/or0460.photos.355048p
Permission
(Reusing this file)
Public domain This image or media file contains material based on a work of a National Park Service employee, created as part of that person's official duties. As a work of the U.S. federal government, such work is in the public domain in the United States. See the NPS website and NPS copyright policy for more information.
Object location43° 44′ 48.01″ N, 122° 27′ 38.02″ W Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current09:26, 2 August 2014Thumbnail for version as of 09:26, 2 August 20145,000 × 3,899 (18.59 MB) (talk | contribs)GWToolset: Creating mediafile for Fæ. HABS 2014-08-01 2601-2900 missing

Metadata