[go: nahoru, domu]

Jump to content

Ørestad: Difference between revisions

Coordinates: 55°37.7′N 12°34.6′E / 55.6283°N 12.5767°E / 55.6283; 12.5767
From Wikipedia, the free encyclopedia
Content deleted Content added
6903 people per km2
 
(41 intermediate revisions by 25 users not shown)
Line 5: Line 5:
| native_name_lang = <!-- ISO 639-2 code e.g. "fr" for French. If more than one, use {{lang}} instead -->
| native_name_lang = <!-- ISO 639-2 code e.g. "fr" for French. If more than one, use {{lang}} instead -->
| settlement_type = [[Districts of Copenhagen|Neighborhood of Copenhagen]]
| settlement_type = [[Districts of Copenhagen|Neighborhood of Copenhagen]]
| image_skyline = Ørestad, Copenhagen skyline .jpg
| image_skyline = Orestad 2015maj30 0229 (18313042462).jpg
| image_alt =
| image_alt =
| image_caption = Developing skyline of Ørestad
| image_caption = Developing skyline of Ørestad
Line 23: Line 23:
| pushpin_map_alt =
| pushpin_map_alt =
| pushpin_map_caption =
| pushpin_map_caption =
| latd = |latm = |lats = |latNS =
| coordinates =
| longd = |longm = |longs = |longEW =
| coor_pinpoint =
| coor_pinpoint =
| coordinates_type =
| coordinates_display = inline,title
| coordinates_footnotes =
| coordinates_footnotes =
| subdivision_type = Country
| subdivision_type = Country
Line 83: Line 80:
| elevation_m =
| elevation_m =
| population_footnotes =
| population_footnotes =
| population_total = 7445<ref name="growing">[http://www.orestad.dk/~/media/Orestad/pdf/Copenhagen-Growing_web.ashx Copenhagen growing] ''BY&HAVN'' Retrieved 2012-05-27</ref>
| population_total = 21400<ref name="growing">[http://www.orestad.dk/~/media/Orestad/pdf/Copenhagen-Growing_web.ashx Copenhagen growing] ''BY&HAVN'' Retrieved 2012-05-27</ref>
| population_as_of = 2012
| population_as_of = 2020
| population_density_km2 = 2401.6
| population_density_km2 = 6903
| population_demonym =
| population_demonym =
| population_note =
| population_note =
Line 100: Line 97:
| footnotes =
| footnotes =
}}
}}
'''Ørestad''' ({{IPA-da|ˈøːɐˌstæð}}) is a developing city area in [[Copenhagen]], [[Denmark]], on the island of [[Amager]].
'''Ørestad''' ({{IPA-da|ˈøːɐsdað}}) is a developing city area in [[Copenhagen]], [[Denmark]], on the island of [[Amager]]. When the areas was planned it was expected that 20,000 people would live in Ørestad, 20,000 would study, and 80,000 people would be employed in the area. However, so far the area has failed to attract even half of those numbers.<ref name="tandfonline.com">{{cite journal|url=http://dx.doi.org/10.1080/09654313.2015.1014780|title=Urban Megaprojects in Crisis? Ørestad Copenhagen Revisited|first=Stan|last=Majoor|date=2 December 2015|publisher=|volume=23|issue=12|pages=2497–2515|via=Taylor and Francis+NEJM|doi=10.1080/09654313.2015.1014780}}</ref> The area is being developed using the [[new town]] concept with the [[Copenhagen Metro]] as the primary [[public transport]] grid, connecting the area with the rest of [[Metropolitan Copenhagen]].


The area was developed using the [[new town]] concept, closely linked with the [[M1 (Copenhagen)|M1 line]] of the [[Copenhagen Metro]]. Economically, income for the plan would be generated by selling the public-owned, unused land for development, thus financing the construction of the metro, and conversely, metro access was deemed necessary for making development attractive.
Ørestad is noted for its attractive location and excellent infrastructure, which apart from the metro includes the [[Oresund Railway]] and [[Copenhagen Airport]], as well as the nearby [[Øresund Bridge]]. The regional [[Oresundtrain]]s reach Copenhagen Airport in six minutes, [[Copenhagen Central Station]] in seven, and 29 minutes to [[Malmö Central Station|Central Station]] in [[Malmö]], Sweden's third largest city. Ørestad has once been referred to as "the largest crossroad in Scandinavia".<ref>{{cite web|url=http://www.building-supply.dk/article/view.html?id=20856|title=Første spadestik til milliardbyggeri i Ørestad Syd|publisher=Building Supply|accessdate=2009-10-21}}</ref> However, Ørestad has also been criticized heavily for its modernist planning approach, focusing exclusively on real estate development and infrastructure connections. This has resulted in wide, open spaces that are void of any human life. The plans for the area have been remade several times to account for such mistakes, but so far without much success.<ref name="tandfonline.com"/>


While the metro is the primary [[public transport]] access, the area is also served by the [[Øresund Line]] between Copenhagen and Malmö, the motorway [[European route E20|E20]] and close to [[Copenhagen Airport]].
Ørestad is divided into four districts: Ørestad Nord, Amager Fælled kvarteret, Ørestad City and Ørestad Syd. Among the most notable institutions located in Ørestad are the [[DR Byen|DR Village]], the headquarters of the national Danish broadcaster [[DR (broadcaster)|DR]], [[Copenhagen Concert Hall]] designed by [[Jean Nouvel]], [[Field's]], the largest [[shopping mall]] in Denmark, and [[Bella Center]], the largest [[convention center|exhibition and conference center]] in Scandinavia, with [[Bella Sky Hotel]], the largest hotel in Scandinavia.

Ørestad was originally planned to consist of four districts, however only three are developed: Ørestad Nord, the unbuilt Amager Fælled area (which will remain a nature reserve), Ørestad City and Ørestad Syd. Therefore, Ørestad in reality consists of two areas detached from each other. The northernmost Ørestad Nord area is coherent with inner Copenhagen. Many Copenhageners will often only regard the outlying area, the two southern districts around Ørestad Station and Field's shopping centre, as Ørestad proper.

Ørestad is neighbouring the nature areas of [[Amager Common]] and [[Vestamager]] which consist mainly of land reclaimed in the first half of the 20th century, with wetlands, bushes and self-grown small woods. These recreational areas, as well as Ørestad itself and the surrounding island, are almost entirely flat.

Some notable institutions in Ørestad are the [[DR Byen|DR Village]] (headquarters of the national Danish broadcaster [[DR (broadcaster)|DR]]), [[Copenhagen Concert Hall]] designed by [[Jean Nouvel]], [[Field's]] (the largest [[shopping mall]] in Denmark), [[Bella Center]] (the largest [[convention center|exhibition and conference center]] in Scandinavia) and [[Bella Sky Hotel]], the largest hotel in Scandinavia. Of these, Bella Center existed before the concept of Ørestad.

==Planning aims and problems==
[[File:Orestad 20151001 0015 (21463015054).jpg|thumb|250px|Panorama of Ørestad]]
Ørestad has a thoroughly planned infrastructure, which apart from the metro includes the [[Øresund Railway]] and motorway, with proximity to [[Copenhagen Airport]] and the nearby [[Øresund Bridge]]. The regional [[Oresundtrain]]s reach Copenhagen Airport in six minutes, [[Copenhagen Central Station]] in seven, and take 29 minutes to [[Malmö Central Station]]. Ørestad has once been promoted as "the largest crossroad in Scandinavia".<ref>{{cite web|url=http://www.building-supply.dk/article/view.html?id=20856|title=Første spadestik til milliardbyggeri i Ørestad Syd|publisher=Building Supply|accessdate=2009-10-21}}</ref>

However, Ørestad has also been criticized heavily for its modernist planning approach, focusing exclusively on real estate development and infrastructure connections. This has resulted in a square-grid street layout with wide, open spaces that are void of life and pedestrians. The plans for the area have been remade several times to account for such mistakes, but so far without much success.<ref name="tandfonline.com"/>

When the area was planned it was expected that 20,000 people would live in Ørestad, 20,000 would study, and 80,000 people would be employed in the area. However, so far the area has attracted barely half of those numbers.<ref name="tandfonline.com">{{cite journal|title=Urban Megaprojects in Crisis? Ørestad Copenhagen Revisited|journal = European Planning Studies|first=Stan|last=Majoor|date=2 December 2015|volume=23|issue=12|pages=2497–2515|doi=10.1080/09654313.2015.1014780}}</ref>


==Geography==
==Geography==
The area of Ørestad is {{convert|3.1|km²|1|abbr=off}}, being about {{convert|600|m|ft|abbr-off}} wide and {{convert|5|km|abbr=off}} long. The central part of Ørestad, Ørestad City, is located {{convert|4.5|km|1|abbr=on}} west of Copenhagen Airport Kastrup and {{convert|5|km|0|abbr=on}} south of Copenhagen city centre.
The area of Ørestad is {{convert|3.1|km2|1|abbr=off}}, being about {{convert|600|m|ft|abbr=off}} wide and {{convert|5|km|abbr=off}} long. The central part of Ørestad, Ørestad City, is located {{convert|4.5|km|1|abbr=on}} west of Copenhagen Airport Kastrup and {{convert|5|km|0|abbr=on}} south of Copenhagen city centre.


Ørestad borders [[Islands Brygge]] to the north, [[Tårnby]] to the east, and the extensive [[Kalvebod Fælled|Kalvebod Commons]] to the west.
Ørestad borders [[Islands Brygge]] to the north, [[Sundbyvester]] and [[Tårnby]] to the east, and the extensive [[Kalvebod Fælled|Kalvebod Commons]] to the west.


==History==
==History==
Line 122: Line 133:
|2011|6839
|2011|6839
|2012|7445
|2012|7445
|2019|15500
|2020|21400
}}
}}
The legislation regarding Ørestad was enacted in 1992 because the unused areas were regarded as being too valuable. [[Ørestad Development Corporation]] (Ørestadsselskabet I/S) was founded March 11, 1993 to manage the growth of the city district. The corporation is owned 55% by [[Copenhagen|Copenhagen municipality]] and 45% by the [[Ministry of Finance of Denmark|Ministry of Finance]]. The development is expected to take 20 to 30 years at a cost of about €175 million, and it is expected that 20,000 people will live in Ørestad, 20,000 will study, and 80,000 people will be employed in the area.
The legislation for Ørestad was enacted in 1992 as a plan for developing unused areas paired with the construction of a metro system. These areas close to the centre of Copenhagen and the airport were publicly owned, and their sale would finance the long-wanted metro project, while the metro was likewise essential for offering an infrastructure in the area.

A metro had previously been contemplated through the densely populated, central axis of Amager, but the new plan would instead build two lines, aimed at developing the western (Ørestad) and eastern (Øresund coast) peripheries of Amager.

[[Ørestad Development Corporation]] (Ørestadsselskabet I/S) was founded March 11, 1993 to manage the growth of the district. The corporation is owned 55% by [[Copenhagen|Copenhagen municipality]] and 45% by the [[Ministry of Finance of Denmark|Ministry of Finance]]. The development was expected to take 20 to 30 years at a cost of about €175 million, and it was expected that 20,000 people would live, 20,000 would study, and 80,000 people would be employed in the area.


At the beginning of 2008, 53% of the area had been sold.
At the beginning of 2008, 53% of the area had been sold.
Line 129: Line 146:
The winning project of an international architectural competition held in 1994 revealed an overall masterplan for Ørestad, dividing the area into four districts. The Finnish design office APRT and Danish [[KHR Arkitekter]] established a joint-venture and presented a final plan in 1997.
The winning project of an international architectural competition held in 1994 revealed an overall masterplan for Ørestad, dividing the area into four districts. The Finnish design office APRT and Danish [[KHR Arkitekter]] established a joint-venture and presented a final plan in 1997.


The first office building was completed in 2001. The first residential buildings were completed three years later. Currently, there are more than 3000 flats as well as {{convert|192,100||0|abbr=on}} of office space in Ørestad. In addition, a total of 13 buildings are under construction.
The first office building was completed in 2001. The first residential buildings were completed three years later. Currently, there are more than 3000 flats as well as {{convert|192,100|m2|0|abbr=on}} of office space in Ørestad. In addition, a total of 13 buildings are under construction.

On 3 July 2022, three people were killed in [[2022 Copenhagen mall shooting|a shooting]] at [[Field's]] mall in the area. Police chief inspector Søren Thomassen announced the arrest of a 22-year-old man and said that the police cannot rule out an act of terrorism. A concert with British singer [[Harry Styles]] was due to take place at [[Royal Arena]] less than a kilometer away, and it is going ahead as planned after a dialogue with the police.<ref>{{Cite web |title=Several killed in Copenhagen shopping mall shooting |url=https://www.bbc.com/news/world-europe-62030919 |access-date=2022-07-03 |website=BBC News |date=3 July 2022}}</ref><ref>{{Cite web |date=2022-07-03 |title=Several killed in shooting at Copenhagen shopping centre |url=https://www.theguardian.com/world/2022/jul/03/several-wounded-in-shooting-at-copenhagen-shopping-centre-say-police |access-date=2022-07-03 |website=The Guardian |language=en |archive-date=3 July 2022 |archive-url=https://web.archive.org/web/20220703190902/https://www.theguardian.com/world/2022/jul/03/several-wounded-in-shooting-at-copenhagen-shopping-centre-say-police |url-status=live }}</ref>


==Areas in Ørestad==
==Areas in Ørestad==
Since the turn of the millennium, a total of 65 buildings have been built, including more than 3000 flats, {{convert|71,400||0|abbr=on}} for educational use and {{convert|65,000||0|abbr=on}} of retail stores in the whole of Ørestad.
Since the turn of the millennium, a total of 65 buildings have been built, including more than 3000 flats, {{convert|71,400|m2|0|abbr=on}} for educational use and {{convert|65,000|m2|0|abbr=on}} of retail stores in the whole of Ørestad.


===Ørestad North===
===Ørestad North===
[[File:Nyekua.jpg|thumb|left|The [[Faculty of Humanities (University of Copenhagen)|Faculty of Humanities]] by the [[Universitetskanalen|University Canal]] ]]
[[File:Nyekua.jpg|thumb|left|The [[Faculty of Humanities (University of Copenhagen)|Faculty of Humanities]] by the [[Universitetskanalen|University Canal]] ]]
Ørestad North is the most developed of the four areas of Ørestad. It is developed according to a masterplan by KHR Arkitekter from 1997 around a central "[[village green]]", the [[Den Landskabelige Kanal|Landscape Canal]] and the north-south-oriented [[Universitetskanalen|University Canal]].
Ørestad North is the most developed of the four areas of Ørestad, also being closest to central Copenhagen and blending into older urban areas. It is developed according to a masterplan by KHR Arkitekter from 1997 around a central "[[village green]]", the [[Den Landskabelige Kanal|Landscape Canal]] and the north-south-oriented [[Universitetskanalen|University Canal]].


Major institutions in the area include the [[DR_Byen]], which includes the Copenhagen Concert Hall, and several educational facilities such as the [[IT University of Copenhagen]] and [[University of Copenhagen]]'s Southern Campus.There are around 1,000 residential units in Ørestad North, half which are student housing in [[Tietgenkollegiet]] and [[Bikuben Kollegiet]].
Major institutions in the area include the [[DR Byen]], which includes the Copenhagen Concert Hall, and several educational facilities such as the [[IT University of Copenhagen]]. The Humanist Faculty of the [[University of Copenhagen]] existed in this area since the 1970s, but was rebuilt and expanded as the [[South Campus (University of Copenhagen)|South Campus]], now forming the extreme northern end of Ørestad. There are around 1,000 residential units in Ørestad North, half which are student housing in [[Tietgenkollegiet]] and [[Bikuben Kollegium]].


===Amager Fælled===
===Amager Fælled===
Plans for development of the protected [[Amager Fælled]] district, west of Sundby metro station, became controversial and were abandoned in 2017. Only a small strip east of the metro line has been built-up, but is officially not a part of Ørestad.
The protected Amager Fælled district remains largely undeveloped.

Thus, Ørestad consists of a northern and southern part, only bound together by Ørestad Boulevard and the metro line along the untouched Amager Fælled area.

A new plan of February 2021 stipulates a housing development project further west, around the current Danhostel Copenhagen Amager, north of [[Vejlands Allé]]. A prospective name for this area is Vejlands Kvarter. Environmental activists who oppose the project use the name ''Lærkesletten'', "the Larch Plain".


===Ørestad City===
===Ørestad City===
[[File:Vandkunsten ørestaden 2007.jpg|thumb|Residential building in Ørestad City, by [[Tegnestuen Vandkunsten]] architects]]
[[File:Vandkunsten ørestaden 2007.jpg|thumb|Residential building in Ørestad City, by [[Tegnestuen Vandkunsten]] architects]]
Ørestad City is the area in Ørestad which has seen the most new construction since 2001 when the Ferring Tower was completed as the first building. The dominating features in the area include the Field's shopping mall and the Bella Center convention and exhibition center. In 2006, [[Daniel Libeskind]] created a master plan for the remaining area of Ørestad City, referred to as [[Ørestad Down Town]], located between Field's and Center Boulevard. In 2009, the 709-room Cab Inn Metro Hotel was completed to the design of Libeskind as the first building in this project.
Ørestad City is the area in Ørestad which has seen the most new construction since 2001 when the Ferring Tower was completed as the first building. The dominating features in the area include the new Field's shopping mall and the pre-existing Bella Center convention and exhibition center. In 2006, [[Daniel Libeskind]] created a master plan for the remaining area of Ørestad City, referred to as [[Ørestad Down Town]], located between Field's and Center Boulevard. In 2009, the 709-room Cab Inn Metro Hotel was completed to the design of Libeskind as the first building in this project.


Ørestad City has seen considerable construction of residential buildings since 2003, most of which are centered around [[Byparken]]. The most distinctive residential buildings in the area are the [[VM Houses]] and [[Mountain Dwellings]] by [[Bjarke Ingels]] and [[Julien De Smedt]], while another noteworthy building is [[Ørestad College]] by [[3XN]].
Ørestad City has seen considerable construction of residential buildings since 2003, most of which are centered around [[Byparken]]. The most distinctive residential buildings in the area are the [[VM Houses]] and [[Mountain Dwellings]] by [[Bjarke Ingels]] and [[Julien De Smedt]], while another noteworthy building is [[Ørestad College]] by [[3XN]].


===Ørestad South===
===Ørestad South===
Ørestad South will be dominated by large-scale commercial buildings in the northern part and residential developments in the southern part. A new headquarters for international consulting firm [[Ramboll]] and the [[Crowne Plaza Copenhagen Towers]] hotel, part of the [[Copenhagen Towers]] development, are located just south of the Øresund highway. Both are designed by [[Dissing + Weitling]]. In the southernmost part of Ørestad South the {{convert|57000|km²|abbr=off}} [[mixed-use development|mixed-use]] building [[8 House]] by Bjarke Ingels Group and the residential building Stævnen by Wilhelm Lauritzen Arkitekter are located.
Ørestad South is dominated by large-scale commercial buildings in the northern part and upscale residential developments in the southern part. A new headquarters for international consulting firm [[Ramboll]] and the [[Crowne Plaza Copenhagen Towers]] hotel, part of the [[Copenhagen Towers]] development, are located just south of the Øresund highway. Both are designed by [[Dissing + Weitling]]. In the southernmost part of Ørestad South the {{convert|57000|km2|abbr=off}} [[mixed-use development|mixed-use]] building [[8 House]] by Bjarke Ingels Group and the residential building Stævnen by Wilhelm Lauritzen Arkitekter are located.


==Future development==
==Future development==
[[File:IT University of Copenhagen - outside space.jpg|thumb|200px|[[Mikado Plads]] in front of Mikado House, designed by [[Arkitema]] and completed in 2010 ]]
[[File:IT University of Copenhagen - outside space.jpg|thumb|200px|[[Mikado Plads]] in front of Mikado House, designed by [[Arkitema]] and completed in 2010 ]]
Within the next 5 years the remaining three building sites in Ørestad Nord are expected to go under construction.


Only eight building sites remain to be built in Ørestad City apart from the so-called [[Libeskind]] site situated west and south of [[Field's]]. The masterplan for this {{convert|187,000||0|abbr=on}} area was revealed in 2006 and suggests a significant all-curved complex consisting of some 11 office buildings including a 704-room [[Cab Inn Metro]] hotel and two 20-storey office/hotel buildings. There will be a central square and a partly glass-roofed arcade. Construction began late 2007 and will go on for the next 5–10 years.
Eight building sites remain to be built in Ørestad City apart from the so-called [[Daniel Libeskind|Libeskind]] site situated west and south of [[Field's]]. The masterplan for this {{convert|187,000|m2|0|abbr=on}} area was revealed in 2006 and suggests an all-curved complex consisting of some 11 office buildings including a 704-room [[Cab Inn Metro]] hotel and two 20-storey office/hotel buildings. There will be a central square and a partly glass-roofed arcade. Construction began late 2007 and will go on for 5–10 years.


The district plan for Ørestad South was approved in 2005.
The district plan for Ørestad South was approved in 2005.
The overall master plan follows the initial design as seen in the winning proposal of 1997.
The overall master plan follows the initial design as seen in the winning proposal of 1997.
Apart from the [[Copenhagen Towers]] complex adjacent to the motorway, two other master plans for two other complexes have been presented: One by [[Niels Torp]] for [[Ørestad Business Center]] and one by [[KHR arkitekter]] for The Hannemannsparken complex. All together these three complexes, situated just south of the motorway, will consist of some {{convert|285,000||0|abbr=on}} of office space.
Apart from the [[Copenhagen Towers]] complex adjacent to the motorway, two other master plans for two other complexes have been presented: One by [[Niels Torp]] for [[Ørestad Business Center]] and one by [[KHR arkitekter]] for The Hannemannsparken complex. All together these three complexes, situated just south of the motorway, will consist of some {{convert|285,000|m2|0|abbr=on}} of office space.
Construction of the [[Copenhagen Towers]] started late 2007.
Construction of [[Copenhagen Towers]] started late 2007.


[[Copenhagen Arena]], a multi-use indoor arena, is under construction in Ørestad Syd, planned to be opened in 2016.<ref>{{cite web |title=Project Plan |url=http://www.copenhagen-arena.dk/en/about_the_project/Pages/Project-plan.aspx |publisher=Copenhagen Arena official website |accessdate=3 May 2014}}</ref> A new school is also planned to open in 2015 as the Ørestad school reaches projected capacity.
[[Royal Arena]], a multi-use indoor arena, opened in 2016 and is located in Ørestad Syd.<ref>{{cite web |title=Project Plan |url=http://www.copenhagen-arena.dk/en/about_the_project/Pages/Project-plan.aspx |publisher=Copenhagen Arena official website |accessdate=3 May 2014}}</ref> A new school is planned to open in 2015 as the Ørestad school reaches projected capacity.{{update after|2016}} Other institutions are Ørestad Gymnasium and a branch of the Copenhagen municipal library.


==Transport==
==Transport==
The main arterial road from the north to the south is Ørestads Boulevard which runs along the southern part of the [[Copenhagen Metro]] line M1. The [[Øresund]] motorway E20 and the [[Øresund]] railway cuts through Ørestad, separating the two districts Ørestad City and Ørestad Syd. To the east the [[airport]] and the fixed [[railway]] and [[motorway]] link to [[Malmö]] can be reached within few minutes.
The intended main arteries from north to south through the four areas are the [[M1 (Copenhagen)|M1 metro line]] and the road Ørestads Boulevard. However, in the two northernmost areas, Ørestads Boulevard sees relatively little traffic due to its peripheral position. By renaming a part of former Artillerivej, Ørestads Boulevard has been extended to [[Amager Boulevard]].

The thoroughfare Vejlands Allé, the [[Øresund]] motorway E20 and the [[Øresund]] railway cut east-west through Ørestad, the first one separating the districts of Amager Fælled and Ørestad City, the latter two separating Ørestad City and Ørestad Syd. To the east the [[airport]] is a few minutes away, and beyond it is the [[Øresundsbroen|Sound Bridge]], the [[railway]] and [[motorway]] tunnel/bridge link to [[Malmö]].

[[Ørestad Station]] is situated at the border between Ørestad City and Ørestad Syd where the railway crosses the metro line. It is served by the metro as well as trains on the [[Øresund Line]] between [[Copenhagen Central Station]], Copenhagen Airport and Malmö.


[[Ørestad Station]] is the main railway station in the area and is served by regional as well as inter-city trains on the [[Oresund Railway|Øresund Line]]. [[Copenhagen Airport]] can be reached in five minutes and [[Copenhagen Central Station]] can be reached in seven minutes. It offers interchange with the Copenhagen Metro line [[M1 (Copenhagen)|M1]], serving the rest of Ørestad as well as an alternative link to Copenhagen City Centre. The metro has six stops in Ørestad: [[Islands Brygge Station|Islands Brygge]] and [[DR Byen Station|DR Byen]] in the Ørestad Nord district, [[Sundby Station|Sundby]] in the Amager Fælled district, [[Bella Center Station|Bella Center]] and Ørestad in the Ørestad City district and [[Vestamager Station|Vestamager]] in the Ørestad Syd district.
The metro has six stops in Ørestad, although some of these mainly serve adjacent areas: [[Islands Brygge Station|Islands Brygge]] and [[DR Byen Station|DR Byen]] in the Ørestad Nord district, [[Sundby Station|Sundby]] in the Amager Fælled district, [[Bella Center Station|Bella Center]] and Ørestad in the Ørestad City district and [[Vestamager Station|Vestamager]] in the Ørestad Syd district.


In addition, bus lines serve the [[Faculty of Humanities (University of Copenhagen)|Faculty of Humanities]] of the University, [[Bella Center]], Ørestad City and Ørestad Syd. Bus stops in Ørestad City are along Ørestads Boulevard.
In addition, bus lines serve the [[South Campus (University of Copenhagen)|South Campus]] of the University, [[Bella Center]], Ørestad City and Ørestad Syd. Bus stops in Ørestad City are along Ørestads Boulevard. Other buses include the east-west-going line 18, the sub-regional 500S which connects Ørestad with western and northern suburbs of Copenhagen, and local buses to the rest of the island of Amager.


==References==
==References==
{{reflist}}
{{Reflist}}


==External links==
==External links==
{{Commons and category}}
{{Commons and category}}
* [http://www.orestad.dk Official website] {{da icon}}
* [http://www.orestad.dk Official website] {{in lang|da}}


{{coord|55|37.7|N|12|34.6|E|type:city_region:DK|display=title}}
{{coord|55|37.7|N|12|34.6|E|type:city_region:DK|display=title}}


{{Copenhagen}}
{{Copenhagen}}
{{Authority control}}


{{DEFAULTSORT:Oerestad}}
{{DEFAULTSORT:Oerestad}}

Latest revision as of 07:18, 21 June 2024

Ørestad
Developing skyline of Ørestad
Developing skyline of Ørestad
CountryDenmark
RegionCapital Region
MunicipalityCopenhagen
DistrictAmager Vest
Area
 • Total3.1 km2 (1.2 sq mi)
Population
 (2020)
 • Total21,400[1]
 • Density6,903/km2 (17,880/sq mi)
WebsiteØrestad

Ørestad (Danish pronunciation: [ˈøːɐˌstæð]) is a developing city area in Copenhagen, Denmark, on the island of Amager.

The area was developed using the new town concept, closely linked with the M1 line of the Copenhagen Metro. Economically, income for the plan would be generated by selling the public-owned, unused land for development, thus financing the construction of the metro, and conversely, metro access was deemed necessary for making development attractive.

While the metro is the primary public transport access, the area is also served by the Øresund Line between Copenhagen and Malmö, the motorway E20 and close to Copenhagen Airport.

Ørestad was originally planned to consist of four districts, however only three are developed: Ørestad Nord, the unbuilt Amager Fælled area (which will remain a nature reserve), Ørestad City and Ørestad Syd. Therefore, Ørestad in reality consists of two areas detached from each other. The northernmost Ørestad Nord area is coherent with inner Copenhagen. Many Copenhageners will often only regard the outlying area, the two southern districts around Ørestad Station and Field's shopping centre, as Ørestad proper.

Ørestad is neighbouring the nature areas of Amager Common and Vestamager which consist mainly of land reclaimed in the first half of the 20th century, with wetlands, bushes and self-grown small woods. These recreational areas, as well as Ørestad itself and the surrounding island, are almost entirely flat.

Some notable institutions in Ørestad are the DR Village (headquarters of the national Danish broadcaster DR), Copenhagen Concert Hall designed by Jean Nouvel, Field's (the largest shopping mall in Denmark), Bella Center (the largest exhibition and conference center in Scandinavia) and Bella Sky Hotel, the largest hotel in Scandinavia. Of these, Bella Center existed before the concept of Ørestad.

Planning aims and problems[edit]

Panorama of Ørestad

Ørestad has a thoroughly planned infrastructure, which apart from the metro includes the Øresund Railway and motorway, with proximity to Copenhagen Airport and the nearby Øresund Bridge. The regional Oresundtrains reach Copenhagen Airport in six minutes, Copenhagen Central Station in seven, and take 29 minutes to Malmö Central Station. Ørestad has once been promoted as "the largest crossroad in Scandinavia".[2]

However, Ørestad has also been criticized heavily for its modernist planning approach, focusing exclusively on real estate development and infrastructure connections. This has resulted in a square-grid street layout with wide, open spaces that are void of life and pedestrians. The plans for the area have been remade several times to account for such mistakes, but so far without much success.[3]

When the area was planned it was expected that 20,000 people would live in Ørestad, 20,000 would study, and 80,000 people would be employed in the area. However, so far the area has attracted barely half of those numbers.[3]

Geography[edit]

The area of Ørestad is 3.1 square kilometres (1.2 square miles), being about 600 metres (2,000 feet) wide and 5 kilometres (3.1 miles) long. The central part of Ørestad, Ørestad City, is located 4.5 km (2.8 mi) west of Copenhagen Airport Kastrup and 5 km (3 mi) south of Copenhagen city centre.

Ørestad borders Islands Brygge to the north, Sundbyvester and Tårnby to the east, and the extensive Kalvebod Commons to the west.

History[edit]

Historical population
YearPop.±%
2004100—    
2005375+275.0%
20061,739+363.7%
20073,377+94.2%
20085,410+60.2%
20095,610+3.7%
20106,142+9.5%
20116,839+11.3%
20127,445+8.9%
201915,500+108.2%
202021,400+38.1%

The legislation for Ørestad was enacted in 1992 as a plan for developing unused areas paired with the construction of a metro system. These areas close to the centre of Copenhagen and the airport were publicly owned, and their sale would finance the long-wanted metro project, while the metro was likewise essential for offering an infrastructure in the area.

A metro had previously been contemplated through the densely populated, central axis of Amager, but the new plan would instead build two lines, aimed at developing the western (Ørestad) and eastern (Øresund coast) peripheries of Amager.

Ørestad Development Corporation (Ørestadsselskabet I/S) was founded March 11, 1993 to manage the growth of the district. The corporation is owned 55% by Copenhagen municipality and 45% by the Ministry of Finance. The development was expected to take 20 to 30 years at a cost of about €175 million, and it was expected that 20,000 people would live, 20,000 would study, and 80,000 people would be employed in the area.

At the beginning of 2008, 53% of the area had been sold.

The winning project of an international architectural competition held in 1994 revealed an overall masterplan for Ørestad, dividing the area into four districts. The Finnish design office APRT and Danish KHR Arkitekter established a joint-venture and presented a final plan in 1997.

The first office building was completed in 2001. The first residential buildings were completed three years later. Currently, there are more than 3000 flats as well as 192,100 m2 (2,067,747 sq ft) of office space in Ørestad. In addition, a total of 13 buildings are under construction.

On 3 July 2022, three people were killed in a shooting at Field's mall in the area. Police chief inspector Søren Thomassen announced the arrest of a 22-year-old man and said that the police cannot rule out an act of terrorism. A concert with British singer Harry Styles was due to take place at Royal Arena less than a kilometer away, and it is going ahead as planned after a dialogue with the police.[4][5]

Areas in Ørestad[edit]

Since the turn of the millennium, a total of 65 buildings have been built, including more than 3000 flats, 71,400 m2 (768,543 sq ft) for educational use and 65,000 m2 (699,654 sq ft) of retail stores in the whole of Ørestad.

Ørestad North[edit]

The Faculty of Humanities by the University Canal

Ørestad North is the most developed of the four areas of Ørestad, also being closest to central Copenhagen and blending into older urban areas. It is developed according to a masterplan by KHR Arkitekter from 1997 around a central "village green", the Landscape Canal and the north-south-oriented University Canal.

Major institutions in the area include the DR Byen, which includes the Copenhagen Concert Hall, and several educational facilities such as the IT University of Copenhagen. The Humanist Faculty of the University of Copenhagen existed in this area since the 1970s, but was rebuilt and expanded as the South Campus, now forming the extreme northern end of Ørestad. There are around 1,000 residential units in Ørestad North, half which are student housing in Tietgenkollegiet and Bikuben Kollegium.

Amager Fælled[edit]

Plans for development of the protected Amager Fælled district, west of Sundby metro station, became controversial and were abandoned in 2017. Only a small strip east of the metro line has been built-up, but is officially not a part of Ørestad.

Thus, Ørestad consists of a northern and southern part, only bound together by Ørestad Boulevard and the metro line along the untouched Amager Fælled area.

A new plan of February 2021 stipulates a housing development project further west, around the current Danhostel Copenhagen Amager, north of Vejlands Allé. A prospective name for this area is Vejlands Kvarter. Environmental activists who oppose the project use the name Lærkesletten, "the Larch Plain".

Ørestad City[edit]

Residential building in Ørestad City, by Tegnestuen Vandkunsten architects

Ørestad City is the area in Ørestad which has seen the most new construction since 2001 when the Ferring Tower was completed as the first building. The dominating features in the area include the new Field's shopping mall and the pre-existing Bella Center convention and exhibition center. In 2006, Daniel Libeskind created a master plan for the remaining area of Ørestad City, referred to as Ørestad Down Town, located between Field's and Center Boulevard. In 2009, the 709-room Cab Inn Metro Hotel was completed to the design of Libeskind as the first building in this project.

Ørestad City has seen considerable construction of residential buildings since 2003, most of which are centered around Byparken. The most distinctive residential buildings in the area are the VM Houses and Mountain Dwellings by Bjarke Ingels and Julien De Smedt, while another noteworthy building is Ørestad College by 3XN.

Ørestad South[edit]

Ørestad South is dominated by large-scale commercial buildings in the northern part and upscale residential developments in the southern part. A new headquarters for international consulting firm Ramboll and the Crowne Plaza Copenhagen Towers hotel, part of the Copenhagen Towers development, are located just south of the Øresund highway. Both are designed by Dissing + Weitling. In the southernmost part of Ørestad South the 57,000 square kilometres (22,000 square miles) mixed-use building 8 House by Bjarke Ingels Group and the residential building Stævnen by Wilhelm Lauritzen Arkitekter are located.

Future development[edit]

Mikado Plads in front of Mikado House, designed by Arkitema and completed in 2010

Eight building sites remain to be built in Ørestad City apart from the so-called Libeskind site situated west and south of Field's. The masterplan for this 187,000 m2 (2,012,851 sq ft) area was revealed in 2006 and suggests an all-curved complex consisting of some 11 office buildings including a 704-room Cab Inn Metro hotel and two 20-storey office/hotel buildings. There will be a central square and a partly glass-roofed arcade. Construction began late 2007 and will go on for 5–10 years.

The district plan for Ørestad South was approved in 2005. The overall master plan follows the initial design as seen in the winning proposal of 1997. Apart from the Copenhagen Towers complex adjacent to the motorway, two other master plans for two other complexes have been presented: One by Niels Torp for Ørestad Business Center and one by KHR arkitekter for The Hannemannsparken complex. All together these three complexes, situated just south of the motorway, will consist of some 285,000 m2 (3,067,714 sq ft) of office space. Construction of Copenhagen Towers started late 2007.

Royal Arena, a multi-use indoor arena, opened in 2016 and is located in Ørestad Syd.[6] A new school is planned to open in 2015 as the Ørestad school reaches projected capacity.[needs update] Other institutions are Ørestad Gymnasium and a branch of the Copenhagen municipal library.

Transport[edit]

The intended main arteries from north to south through the four areas are the M1 metro line and the road Ørestads Boulevard. However, in the two northernmost areas, Ørestads Boulevard sees relatively little traffic due to its peripheral position. By renaming a part of former Artillerivej, Ørestads Boulevard has been extended to Amager Boulevard.

The thoroughfare Vejlands Allé, the Øresund motorway E20 and the Øresund railway cut east-west through Ørestad, the first one separating the districts of Amager Fælled and Ørestad City, the latter two separating Ørestad City and Ørestad Syd. To the east the airport is a few minutes away, and beyond it is the Sound Bridge, the railway and motorway tunnel/bridge link to Malmö.

Ørestad Station is situated at the border between Ørestad City and Ørestad Syd where the railway crosses the metro line. It is served by the metro as well as trains on the Øresund Line between Copenhagen Central Station, Copenhagen Airport and Malmö.

The metro has six stops in Ørestad, although some of these mainly serve adjacent areas: Islands Brygge and DR Byen in the Ørestad Nord district, Sundby in the Amager Fælled district, Bella Center and Ørestad in the Ørestad City district and Vestamager in the Ørestad Syd district.

In addition, bus lines serve the South Campus of the University, Bella Center, Ørestad City and Ørestad Syd. Bus stops in Ørestad City are along Ørestads Boulevard. Other buses include the east-west-going line 18, the sub-regional 500S which connects Ørestad with western and northern suburbs of Copenhagen, and local buses to the rest of the island of Amager.

References[edit]

  1. ^ Copenhagen growing BY&HAVN Retrieved 2012-05-27
  2. ^ "Første spadestik til milliardbyggeri i Ørestad Syd". Building Supply. Retrieved 2009-10-21.
  3. ^ a b Majoor, Stan (2 December 2015). "Urban Megaprojects in Crisis? Ørestad Copenhagen Revisited". European Planning Studies. 23 (12): 2497–2515. doi:10.1080/09654313.2015.1014780.
  4. ^ "Several killed in Copenhagen shopping mall shooting". BBC News. 3 July 2022. Retrieved 2022-07-03.
  5. ^ "Several killed in shooting at Copenhagen shopping centre". The Guardian. 2022-07-03. Archived from the original on 3 July 2022. Retrieved 2022-07-03.
  6. ^ "Project Plan". Copenhagen Arena official website. Retrieved 3 May 2014.

External links[edit]