[go: nahoru, domu]

Jump to content

Bainiaogongyuan station: Difference between revisions

Coordinates: 41°49′43″N 123°23′41″E / 41.82865°N 123.39485°E / 41.82865; 123.39485
From Wikipedia, the free encyclopedia
Content deleted Content added
update template syntax
Added coordinates
Line 2: Line 2:
{{use dmy dates|date=October 2020}}
{{use dmy dates|date=October 2020}}
{{Infobox station
{{Infobox station
| name = Beiniaogongyuan
| name = Beiniaogongyuan
| native_name = 百鸟公园
| native_name = 百鸟公园
| native_name_lang = zh
| native_name_lang = zh
| symbol_location = shenyang
| symbol_location = shenyang
| symbol = metro
| symbol = metro
| type =
| type =
| image = Exit_D_of_Bainiao_Park_Station_SYMTR.jpg
| image = Exit_D_of_Bainiao_Park_Station_SYMTR.jpg
| alt =
| alt =
| caption =
| caption =
| address = Intersection of Chongshan West Rd. and Nujiang St.
| address = Intersection of Chongshan West Rd. and Nujiang St.
| borough = [[Huanggu District]], [[Shenyang]]
| borough = [[Huanggu District]], [[Shenyang]]
| country = [[China]]
| country = [[China]]
| coordinates =
| coordinates = {{coord|display=inline,title}}
| owned =
| owned =
| operator = [[Shenyang Metro]]
| operator = [[Shenyang Metro]]
| line = {{rail color box|system=SYM|line=10|inline=yes}}
| line = {{rail color box|system=SYM|line=10|inline=yes}}
| distance =
| distance =
| platforms = 2
| platforms = 2
| tracks =
| tracks =
| train_operators =
| train_operators =
| connections =
| connections =
| structure = Underground
| structure = Underground
| parking =
| parking =
| bicycle =
| bicycle =
| disabled = Yes
| disabled = Yes
| code =
| code =
| iata =
| iata =
| zone =
| zone =
| website =
| website =
| opened = {{Start date|2020|04|29|df=y}}
| opened = {{Start date|2020|04|29|df=y}}
| electrified =
| electrified =
| closed = <!-- {{End date|YYYY|MM|DD|df=y}} -->
| closed = <!-- {{End date|YYYY|MM|DD|df=y}} -->
| passengers =
| passengers =
| pass_year =
| pass_year =
| pass_rank =
| pass_rank =
| services = {{Adjacent stations|system=SYM|line=10|left=Huaihejieshenyieryuan|right=Changjiangjie}}
| services = {{Adjacent stations|system=SYM|line=10|left=Huaihejieshenyieryuan|right=Changjiangjie}}
}}
}}


Line 68: Line 68:
|line10=yes
|line10=yes
}}
}}

{{coord missing|China}}


[[Category:Railway stations in China opened in 2020]]
[[Category:Railway stations in China opened in 2020]]

Revision as of 11:58, 7 May 2023

Beiniaogongyuan

百鸟公园
 metro 
General information
LocationIntersection of Chongshan West Rd. and Nujiang St.
Huanggu District, Shenyang
China
Coordinates41°49′43″N 123°23′41″E / 41.82865°N 123.39485°E / 41.82865; 123.39485
Operated byShenyang Metro
Line(s)     Line 10
Platforms2
Construction
Structure typeUnderground
AccessibleYes
History
Opened29 April 2020 (2020-04-29)
Services
Preceding station Shenyang Metro Following station
Huaihejieshenyieryuan
towards Dingxianghu
Line 10 Changjiangjie
towards Zhangshabu

Bainiaogongyuan (Chinese: 百鸟公园站; pinyin: Bǎiniǎogōngyuán Zhàn) is a station on Line 10 of the Shenyang Metro.[1] The station opened on 29 April 2020.[2]

Station Layout

G Entrances and Exits Exits A-D
B1 Concourse Faregates, Station Agent
B2 Northbound      Line 10 towards Dingxianghu (Huaihejieshenyieryuan)
Island platform, doors open on the left
Southbound      Line 10 towards Zhangshabu (Changjiangjie)

References

  1. ^ "沈阳地铁线网图". Shenyang Metro. Retrieved 12 October 2020.
  2. ^ "沈阳地铁十号线一期工程定于4月29日开通运营". Shenyang Metro. Retrieved 13 October 2020.