Sandy Hollow–Gulgong railway line: Difference between revisions
m en-au; int'l fmt tag |
m →History: rm extraneous comma |
||
(47 intermediate revisions by 26 users not shown) | |||
Line 1: | Line 1: | ||
{{Short description|Railway line in Australia}} |
|||
{{Use dmy dates|date=January |
{{Use dmy dates|date=January 2022}} |
||
{{Use Australian English|date=January 2012}} |
{{Use Australian English|date=January 2012}} |
||
{{SandyHollow- Gulgong}} |
{{SandyHollow- Gulgong}} |
||
{{mapbox|type=line}} |
|||
The '''Sandy |
The '''Sandy Hollow–Gulgong railway line''' is a railway line in eastern [[New South Wales]], [[Australia]]. The line forms a cross country connection from the [[Main North railway line, New South Wales|Main North line]] in the [[Hunter Region|Upper Hunter region]] to the [[Gwabegar railway line|Gwabegar line]] in the [[Central West (New South Wales)|Central West region]]. The line is approximately {{Convert|125|km}} in length. From the Gwabegar line, trains can then ultimately reach the [[Main Western railway line, New South Wales|Main West line]] creating a circuitous bypass of [[Sydney]] for freight traffic heading between the west and north of New South Wales. The line was opened in 1985.<ref>{{cite web | title = Sandy Hollow- Gulgong Line | url = http://www.nswrail.net/lines/show.php?name=NSW:sandy_hollow_gulgong | publisher= nswrail.net | accessdate = 2006-05-01}}</ref> |
||
| url = http://www.nswrail.net/lines/show.php?name=NSW:sandy_hollow_gulgong | publisher= www.nswrail.net | accessdate = 2006-05-01}}</ref>. |
|||
==History== |
==History== |
||
[[File:Phipps Cutting - panoramio.jpg|thumb|The line – seen on the right – runs adjacent to the Goulburn River as it passes through Widden.]] |
|||
The Sandy Hollow Line between Sandy Hollow, [[Gulgong]] and [[Maryvale, New South Wales|Maryvale]] (between Wellington and Dubbo), was originally surveyed in 1860 as a more easily graded crossing of the Great Dividing Range than the Blue Mountains line nearer to Sydney. It was not commenced, however, until 1937,<ref>'''''The Sandy Hollow-Maryvale Railway''''' Wright, R [[Australian Railway History|Australian Railway Historical Society Bulletin]], August, 1957 pp123-128</ref> when it began as an unemployment relief scheme of the NSW Government, achieving infamy for having no modern mechanical devices used on it, other than trucks carrying concrete for the 5 tunnels and bridge piers, all other work being done with picks, shovels, hand drills, horses and carts. Folk singer [[Duke Tritton]] wrote a poem ''The Sandy Hollow Line'' , which described the hardships of the unemployed workers on "susso" who worked on the line. |
|||
Construction continued through World War 2 at a desultory pace, held up by money, labour and especially steel shortages, only to be abandoned unfinished, approximately 92% complete, a few years later in 1951. The line crosses the [[Great Dividing Range]] by following the Goulburn River and [[Bylong Valley]]s from Sandy Hollow to [[Bylong]], with a tunnel under Cox's Gap. |
|||
⚫ | The |
||
⚫ | |||
⚫ | The Kerrabee Tunnel, No.1 of 3 in the Bylong range and 1 of 5 on the entire line, that was built under Cox's Gap between 1946 and 1949 was used for eastbound road traffic on the [[Bylong Valley Way]] until work recommenced in the early 1980s. It was used in 1978 in the filming of the opening scene for the television series Torque, hosted by [[Peter Wherrett]]. In that scene, a [[Bolwell Nagari]] driven by Wherrett approached as lights in the dark tunnel, then the camera drew back as the car drove out of the tunnel. The tunnel was also used in a scene in the Australian movie [[The Chain Reaction]]<ref>{{cite web |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
|accessdate = 2007-06-07 |
|||
|url-status = dead |
|||
|archiveurl = https://web.archive.org/web/20070902060840/http://www.new-england-hway.com.au/sandy_hollow_self_drive_tour_circuit.htm |
|||
|archivedate = 2 September 2007 |
|||
⚫ | |||
The line was opened as a heavy-haul railway to the major coal mine at [[Ulan, New South Wales|Ulan]] in 1982 and extended to Gulgong in 1985 to meet the line to Dunedoo and Dubbo.<ref>{{cite web |
The line was opened as a heavy-haul railway to the major coal mine at [[Ulan, New South Wales|Ulan]] in 1982 and extended to Gulgong in 1985 to meet the line to Dunedoo and Dubbo.<ref>{{cite web |
||
| title = Sandy |
| title = Sandy Hollow–Gulgong line |
||
| url = http://www.nswrail.net/lines/show.php?name=NSW:sandy_hollow_gulgong |
| url = http://www.nswrail.net/lines/show.php?name=NSW:sandy_hollow_gulgong |
||
| publisher= |
| publisher= nswrail.net |
||
| accessdate = 2006-12-03 }}</ref> |
| accessdate = 2006-12-03 }}</ref> It is unlikely to be extended to Maryvale. |
||
== Current status == |
== Current status == |
||
[[File:RailBridgeOverBylongValleyWay.JPG|right|thumb|[[Bylong Valley Way]] passes under line west of Cox's Gap]] |
[[File:RailBridgeOverBylongValleyWay.JPG|right|thumb|[[Bylong Valley Way]] passes under line west of Cox's Gap]] |
||
Because |
Because of Coal from the Ulan Area is now the primary function of this line, [[Australian Rail Track Corporation]] (ARTC) refer to the line as ''the Ulan line'' all the way from Muswellbrook to Gulgong. Coal from the Ulan, Moolarben, Wilpinjong @ the Western Ulan End and Mangoola (Anvil Hill), Mt Pleasant and Bengalla Mines close to Muswellbrook also use this line. In preparation for this, ARTC are upgrading the lines in the Muswellbrook yard and adding two more passing loops to the Ulan line in 2007.<ref>{{cite web | title = ARTC letter to Mid-Western Regional Council re Ulan line | url = http://www.mudgee.nsw.gov.au/files/5315/File/CorporateServCtee.pdf | publisher = midwestern.nsw.gov.au | accessdate = 2007-04-29 }} {{Dead link|date=October 2010|bot=H3llBot}}</ref> More Loops have been added since then as below. The line previously used outdated [[Token (railway signalling)|electric train staff]] (ETS) [[safeworking]] procedures in 5 sections over its length. This is being replaced with [[Centralized traffic control|centralised traffic control]] (CTC) in 5 stages. The stages correspond to the 5 ETS sections, numbered from Muswellbrook to Gulgong. The 4th stage, to [[Ulan, New South Wales|Ulan]], was completed in May 2008.<ref>[http://www.artc.com.au/Article/Detail.aspx?p=6&np=4&id=153 ARTC announcement of completion of stage 4] {{webarchive |url=https://web.archive.org/web/20080720054737/http://www.artc.com.au/Article/Detail.aspx?p=6&np=4&id=153 |date=20 July 2008 }}</ref> This extends CTC to the westernmost coal mine on the line, covering the majority of train movements on the line. |
||
⚫ | Progress at upgrading the signaling by ARTC was criticised as slow and causing bottlenecks. The upgrade was previously due to be completed at the end of 2007.<ref>{{cite news |url=http://www.theaustralian.com.au/news/s-system-hits-coal-exports/story-e6frg6n6-1111114529777 |title=1920s system hits coal exports |date=29 September 2007 |accessdate=2010-05-09 |first=Adele |last=Ferguson |work=The Australian}}</ref> |
||
The line previously used outdated [[Token (railway signalling)|electric train staff]] (ETS) [[safeworking]] procedures in 5 sections over its length. This is being replaced with [[Centralized traffic control|centralised traffic control]] (CTC) in 5 stages. The stages correspond to the 5 ETS sections, numbered from Muswellbrook to Gulgong. The 4th stage, to [[Ulan, New South Wales|Ulan]], was completed in May 2008.<ref>[http://www.artc.com.au/Article/Detail.aspx?p=6&np=4&id=153 ARTC announcement of completion of stage 4]</ref> This extends CTC to the westernmost coal mine on the line, covering the majority of train movements on the line. |
|||
⚫ | Progress at upgrading the signaling by ARTC was criticised as slow and causing bottlenecks. The upgrade was previously due to be completed at the end of |
||
== Station layout == |
== Station layout == |
||
Ulan has a [[balloon loop]] to terminate, load, and return the coal trains up to 1800m long. |
Ulan has a [[balloon loop]] to terminate, load, and return the coal trains up to 1800m long. There is also a [[crossing loop]] 900m long. Unlike earlier plans, there are no sidings for general freight, nor any passenger platforms. |
||
[[Wilpinjong]] also |
[[Wilpinjong]], Moolarben, Mangoola (Anvil Hill), Mt Pleasant and Bengalla also have a balloon loops. |
||
== Crossing |
== Crossing loops == |
||
As of December 2019, there are thirteen crossing loops. The loops (and their lengths) are located at: |
|||
*[[Bengalla]] – 1770m |
|||
*[[Mangoola]] – 1670m |
|||
⚫ | |||
*[[Yarrawa]] – 1660m |
|||
⚫ | |||
*[[Sandy Hollow]] – 1558m |
|||
* [[Coggan Creek, New South Wales|Coggan Creek]] - 1800m |
|||
*[[Baerami]] – 1655m |
|||
* [[Ulan, New South Wales|Ulan]] - 900m |
|||
* [[ |
* [[Kerrabee, New South Wales|Kerrabee]] – 1550m |
||
*[[Murrumbo]] – 1660m |
|||
* [[Bylong]] – 3424m |
|||
⚫ | |||
*[[Wollar]] – 1655m |
|||
*[[Wilpinjong]] – 1660m |
|||
⚫ | |||
* [[Gulgong]] – 400m |
|||
== See also == |
== See also == |
||
Line 50: | Line 63: | ||
== References == |
== References == |
||
{{Reflist}} |
{{Reflist}} |
||
== External links == |
|||
* [http://www.nswrail.net/infrastructure/tunnel.php Tunnels in NSW] |
|||
{{Railway lines in New South Wales}} |
{{Railway lines in New South Wales}} |
||
{{DEFAULTSORT:Sandy Hollow-Gulgong railway line}} |
|||
[[Category:Regional railway lines in New South Wales]] |
[[Category:Regional railway lines in New South Wales]] |
||
[[Category:Standard gauge railways in Australia]] |
[[Category:Standard gauge railways in Australia]] |
||
[[Category:Railway lines opened in 1985]] |
|||
[[Category:1985 establishments in Australia]] |
|||
[[Category:Central West (New South Wales)]] |
Latest revision as of 04:10, 29 June 2024
Sandy Hollow–Gulgong railway line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The Sandy Hollow–Gulgong railway line is a railway line in eastern New South Wales, Australia. The line forms a cross country connection from the Main North line in the Upper Hunter region to the Gwabegar line in the Central West region. The line is approximately 125 kilometres (78 mi) in length. From the Gwabegar line, trains can then ultimately reach the Main West line creating a circuitous bypass of Sydney for freight traffic heading between the west and north of New South Wales. The line was opened in 1985.[1]
History
[edit]The Sandy Hollow Line between Sandy Hollow, Gulgong and Maryvale (between Wellington and Dubbo), was originally surveyed in 1860 as a more easily graded crossing of the Great Dividing Range than the Blue Mountains line nearer to Sydney. It was not commenced, however, until 1937,[2] when it began as an unemployment relief scheme of the NSW Government, achieving infamy for having no modern mechanical devices used on it, other than trucks carrying concrete for the 5 tunnels and bridge piers, all other work being done with picks, shovels, hand drills, horses and carts. Folk singer Duke Tritton wrote a poem The Sandy Hollow Line , which described the hardships of the unemployed workers on "susso" who worked on the line.
Construction continued through World War 2 at a desultory pace, held up by money, labour and especially steel shortages, only to be abandoned unfinished, approximately 92% complete, a few years later in 1951. The line crosses the Great Dividing Range by following the Goulburn River and Bylong Valleys from Sandy Hollow to Bylong, with a tunnel under Cox's Gap.
The Kerrabee Tunnel, No.1 of 3 in the Bylong range and 1 of 5 on the entire line, that was built under Cox's Gap between 1946 and 1949 was used for eastbound road traffic on the Bylong Valley Way until work recommenced in the early 1980s. It was used in 1978 in the filming of the opening scene for the television series Torque, hosted by Peter Wherrett. In that scene, a Bolwell Nagari driven by Wherrett approached as lights in the dark tunnel, then the camera drew back as the car drove out of the tunnel. The tunnel was also used in a scene in the Australian movie The Chain Reaction[3]
The line was opened as a heavy-haul railway to the major coal mine at Ulan in 1982 and extended to Gulgong in 1985 to meet the line to Dunedoo and Dubbo.[4] It is unlikely to be extended to Maryvale.
Current status
[edit]Because of Coal from the Ulan Area is now the primary function of this line, Australian Rail Track Corporation (ARTC) refer to the line as the Ulan line all the way from Muswellbrook to Gulgong. Coal from the Ulan, Moolarben, Wilpinjong @ the Western Ulan End and Mangoola (Anvil Hill), Mt Pleasant and Bengalla Mines close to Muswellbrook also use this line. In preparation for this, ARTC are upgrading the lines in the Muswellbrook yard and adding two more passing loops to the Ulan line in 2007.[5] More Loops have been added since then as below. The line previously used outdated electric train staff (ETS) safeworking procedures in 5 sections over its length. This is being replaced with centralised traffic control (CTC) in 5 stages. The stages correspond to the 5 ETS sections, numbered from Muswellbrook to Gulgong. The 4th stage, to Ulan, was completed in May 2008.[6] This extends CTC to the westernmost coal mine on the line, covering the majority of train movements on the line.
Progress at upgrading the signaling by ARTC was criticised as slow and causing bottlenecks. The upgrade was previously due to be completed at the end of 2007.[7]
Station layout
[edit]Ulan has a balloon loop to terminate, load, and return the coal trains up to 1800m long. There is also a crossing loop 900m long. Unlike earlier plans, there are no sidings for general freight, nor any passenger platforms.
Wilpinjong, Moolarben, Mangoola (Anvil Hill), Mt Pleasant and Bengalla also have a balloon loops.
Crossing loops
[edit]As of December 2019, there are thirteen crossing loops. The loops (and their lengths) are located at:
- Bengalla – 1770m
- Mangoola – 1670m
- Yarrawa – 1660m
- Sandy Hollow – 1558m
- Baerami – 1655m
- Kerrabee – 1550m
- Murrumbo – 1660m
- Bylong – 3424m
- Coggan Creek – 1740m
- Wollar – 1655m
- Wilpinjong – 1660m
- Ulan – 936m
- Gulgong – 400m
See also
[edit]References
[edit]- ^ "Sandy Hollow- Gulgong Line". nswrail.net. Retrieved 1 May 2006.
- ^ The Sandy Hollow-Maryvale Railway Wright, R Australian Railway Historical Society Bulletin, August, 1957 pp123-128
- ^ "Sandy Hollow Self Drive Tour Circuit". Archived from the original on 2 September 2007. Retrieved 7 June 2007.
- ^ "Sandy Hollow–Gulgong line". nswrail.net. Retrieved 3 December 2006.
- ^ "ARTC letter to Mid-Western Regional Council re Ulan line" (PDF). midwestern.nsw.gov.au. Retrieved 29 April 2007. [dead link]
- ^ ARTC announcement of completion of stage 4 Archived 20 July 2008 at the Wayback Machine
- ^ Ferguson, Adele (29 September 2007). "1920s system hits coal exports". The Australian. Retrieved 9 May 2010.