Tippy Dam: Difference between revisions
Tags: Mobile edit Mobile app edit |
m Reverted edits by 2601:400:4200:3B25:30D6:6E2D:3002:4303 (talk) to last version by Bgwhite |
||
Line 30: | Line 30: | ||
==Environmental== |
==Environmental== |
||
The hydro [[spillway]] chamber at Tippy is used by about 24,600 [[bat]]s during the summer for roosting, swarming in the fall, and [[hibernation]] in the |
The hydro [[spillway]] chamber at Tippy is used by about 24,600 [[bat]]s during the summer for roosting, swarming in the fall, and [[hibernation]] in the winter. |
||
==Statistics== |
==Statistics== |
Revision as of 00:46, 8 October 2016
Tippy Dam | |
---|---|
Location | Dickson Township, Manistee County, Michigan, USA |
Construction began | 1918 |
Dam and spillways | |
Impounds | Manistee River |
Tippy Dam or Tippy Hydro was built 1918 and is a hydroelectric dam operated by Consumers Energy. The original name of the dam was Junction Hydro, but it was renamed to honor a Consumers board of directors member, Charles W. Tippy. The dam spans the Manistee River about 170 miles from its headwaters which include Manistee Lake, on the river's way to Lake Michigan.[1]
Recreation uses
Just below Tippy Dam is one of the finest trout, steelhead, and salmon fishing areas in Michigan. During the fall salmon run anglers line the banks shoulder to shoulder trying to catch king salmon that can weigh well over 20 pounds.
Environmental
The hydro spillway chamber at Tippy is used by about 24,600 bats during the summer for roosting, swarming in the fall, and hibernation in the winter.
Statistics
- Electric Power produced by the water turbines: 20,000 kilowatts