Editing MS Marina
Content that violates any copyrights will be deleted. Encyclopedic content must be verifiable through citations to reliable sources.
Latest revision | Your text | ||
Line 1: | Line 1: | ||
{{Short description|Cruise ship}} |
|||
{{Use dmy dates|date=December 2018}} |
{{Use dmy dates|date=December 2018}} |
||
{|{{Infobox ship begin |
{|{{Infobox ship begin |
||
Line 22: | Line 21: | ||
| Ship laid down = 10 March 2009 |
| Ship laid down = 10 March 2009 |
||
| Ship launched = 4 April 2010 |
| Ship launched = 4 April 2010 |
||
| Ship completed = |
| Ship completed = September 2010 (planned)<ref name="CIN"/> |
||
| Ship christened = |
| Ship christened = |
||
| Ship acquired = |
| Ship acquired = |
||
Line 29: | Line 28: | ||
| Ship out of service = |
| Ship out of service = |
||
| Ship identification = * {{IMO Number|9438066}} |
| Ship identification = * {{IMO Number|9438066}} |
||
* {{MMSI Number|538003668}} <ref>{{cite web|title=Marina Vessel Info|url=http://www.marinetraffic.com/ais/shipdetails.aspx?mmsi=538003668|publisher=Marinetraffic.com| |
* {{MMSI Number|538003668}} <ref>{{cite web|title=Marina Vessel Info|url=http://www.marinetraffic.com/ais/shipdetails.aspx?mmsi=538003668|publisher=Marinetraffic.com|accessdate=20 August 2012}}</ref> |
||
| Ship fate = |
| Ship fate = |
||
| Ship status = In active service |
| Ship status = In active service as of 2011 |
||
| Ship notes = |
| Ship notes = |
||
}} |
}} |
||
Line 37: | Line 36: | ||
| Hide header = |
| Hide header = |
||
| Header caption = |
| Header caption = |
||
| Ship class = {{sclass2|Oceania|cruise ship}} |
| Ship class = {{sclass2-|Oceania|cruise ship}} |
||
| Ship tonnage = {{GT|66,084}} |
| Ship tonnage = {{GT|66,084}} |
||
| Ship length = {{convert|782|ft|m|2|abbr=on}}<ref name="CIN"/> |
| Ship length = {{convert|782|ft|m|2|abbr=on}}<ref name="CIN"/> |
||
| Ship beam = {{convert|105|ft|m|2|abbr=on}}<ref name="CIN"/> |
| Ship beam = {{convert|105|ft|m|2|abbr=on}}<ref name="CIN"/> |
||
| Ship height = |
| Ship height = |
||
| Ship draught = {{convert|24|ft|m|2|abbr=on}}<ref name="CIN"/> |
| Ship draught = {{convert|24|ft|m|2|abbr=on}}<ref name="CIN"/> |
||
| Ship draft = |
| Ship draft = |
||
Line 50: | Line 49: | ||
| Ship ice class = |
| Ship ice class = |
||
| Ship sail plan = |
| Ship sail plan = |
||
| Ship power = |
| Ship power = [[diesel-electric]]<ref name="CIN"/> |
||
⚫ | |||
Wartsila 12V46C |
|||
2 x 8,400 kW Wartsila 8L46C |
|||
⚫ | |||
2 x 2,200 kW bow thrusters |
|||
1 x 1,900 kW stern thruster |
|||
| Ship speed = {{convert|20|kn|km/h|0|lk=in}}<ref name="CIN"/> |
| Ship speed = {{convert|20|kn|km/h|0|lk=in}}<ref name="CIN"/> |
||
| Ship capacity = 1,250 passengers (double occupancy) |
| Ship capacity = 1,250 passengers (double occupancy) |
||
Line 65: | Line 58: | ||
|} |
|} |
||
'''MS ''Marina''''' is an {{sclass2|Oceania|cruise ship}}, which was constructed at [[Fincantieri]]'s Sestri Ponente yards in Italy for [[Oceania Cruises]]. ''Marina'' is the first in a duo of cruise ships, and was followed by {{MS|Riviera}} in May 2012 |
'''MS ''Marina''''' is an {{sclass2-|Oceania|cruise ship}}, which was constructed at [[Fincantieri]]'s Sestri Ponente yards in Italy for [[Oceania Cruises]]. ''Marina'' is the first in a duo of cruise ships, and was followed by {{MS|Riviera}} in May 2012,<ref name="CIN">{{cite web |url=http://www.cruiseindustrynews.com/cruise-news/1502-8508-oceania-commences-construction-of-first-oceania-class-newbuild-qmarinaq.html |title=Oceania commences construction of first Oceania class newbuild "Marina" |date=5 August 2009|accessdate=1 April 2010 |work=Cruise Industry News}}</ref> the option for the third ship was declined.<ref>{{cite news| url=http://travel.usatoday.com/cruises/post/2010/11/oceania-cruises-marina-riviera-class-ship-order-fincantieri/129923/1?csp=34travel | work=USA Today | title=Most Popular | first=Gene | last=Sloan | date=4 November 2010}}</ref> The ship was named in Miami by [[Mary Hart]] on 5 February 2011.<ref>[http://www.miamiherald.com/2011/02/20/2070150/cruise-ships-oceania-marina-is.html ]{{dead link|date=February 2016}}</ref> |
||
==Concept and construction== |
==Concept and construction== |
||
The finalization of contract for the construction of ''Marina'' and her sister ship, plus an option for a third, was reached on 18 June 2007.<ref name="CIN2">{{cite web |url=http://www.cruiseindustrynews.com/cruise-news/635-61807-countdown-begins-for-the-debut-of-the-new-oceania-class.html |title=Countdown begins for the debut of the new Oceania class |date=18 June 2007| |
The finalization of contract for the construction of ''Marina'' and her sister ship, plus an option for a third, was reached on 18 June 2007.<ref name="CIN2">{{cite web |url=http://www.cruiseindustrynews.com/cruise-news/635-61807-countdown-begins-for-the-debut-of-the-new-oceania-class.html |title=Countdown begins for the debut of the new Oceania class |date=18 June 2007|accessdate=1 April 2010 |work=Cruise Industry News}}</ref> ''Marina'' was designed by Norwegian architectural firm [[Yran & Storbraaten]] (Y&S).<ref name="CIN3">{{cite web |url=http://www.cruiseindustrynews.com/cruise-news/1069-22808-oceania-releases-1st-design-details-of-the-new-oceania-class.html |title=Oceania releases first design details of the new Oceania class |date=28 February 2008 |accessdate=1 April 2010 |work=Cruise Industry News}}</ref> The [[keel]] of ''Marina'' was laid on 10 March 2009 and included the welding of a U.S. silver dollar coin and a pre-Castro [[Cuba]]n peso coin in the keel, which according to shipbuilding tradition is believed to bring fortune to the ship, its passengers and crew during their seagoing life.<ref name="CIN5">{{cite web |url=http://www.cruiseindustrynews.com/cruise-news/2420-31009-fincantieri-starts-construction-of-oceanias-marina.html |title=Fincantieri starts construction of Oceania's Marina |date=10 March 2009 |accessdate=15 April 2010 |work=Cruise Industry News}}</ref> ''Marina'' has a [[diesel-electric]] powerplant with a pair of controllabe pitch propellers.<ref name="CIN"/> |
||
The ship measures 66,084 gross tons and has the capacity for 1,250 passengers at double occupancy.<ref>{{Cite web|url=https://www.oceaniacruises.com/ships/marina/|title=Oceania Cruises' Marina|website=oceaniacruises.com|publisher=Oceania Cruises|access-date=9 January 2019}}</ref> |
The ship measures 66,084 gross tons and has the capacity for 1,250 passengers at double occupancy.<ref>{{Cite web|url=https://www.oceaniacruises.com/ships/marina/|title=Oceania Cruises' Marina|last=|first=|date=|website=oceaniacruises.com|publisher=Oceania Cruises|archive-url=|archive-date=|dead-url=|access-date=9 January 2019}}</ref> |
||
==References== |
==References== |
||
Line 83: | Line 76: | ||
== External links == |
== External links == |
||
{{commons category| |
{{commons category|Marina (ship, 2011)}} |
||
* {{Official website|http://www.oceaniacruises.com/ships/marina/default.aspx}} |
* {{Official website|http://www.oceaniacruises.com/ships/marina/default.aspx}} |
||