Beijing–Hong Kong (Taipei) corridor
Appearance
Beijing–Hong Kong (Taipei) corridor 京港(台)通道 | |
---|---|
Overview | |
Status | Under construction |
Locale | People's Republic of China Republic of China (Taiwan) |
Termini |
|
Service | |
Type | High-speed rail |
Operator(s) | China Railway High-speed |
Technical | |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | 25 kV AC overhead catenary (50 Hz in China, 60 Hz in Taiwan) |
Operating speed | 350 km/h (217 mph) |
Beijing–Hong Kong (Taipei) corridor | |||||||
---|---|---|---|---|---|---|---|
Chinese | 京港(台)通道 | ||||||
|
The Beijing–Hong Kong (Taipei) corridor is a proposed high-speed railway corridor in Greater China. It will run in a north–south direction from Beijing to Hong Kong, with a branch leading from Hefei to end at Taipei across the Taiwan Strait. It will connect the cities of Beijing, Xiong'an, Fuyang, Hefei, Jiujiang, Nanchang, Ganzhou, Shenzhen and Hong Kong on the main line, as well as Fuzhou and Taipei, Taiwan on the branch line.
The line was announced by the Chinese government in 2016 as part of China's "Eight Vertical and Eight Horizontal" network. Currently, high-speed services from Beijing to Hong Kong travel via the Beijing–Guangzhou high-speed railway. This corridor will create a more direct route.
Route
[edit]Name | Route | Design speed (km/h) |
Length (km) |
Status | Construction start | Opened | Remarks |
---|---|---|---|---|---|---|---|
Beijing–Shangqiu high-speed railway | Beijing Fengtai – Xiong'an | 350[1] | 85 | in planning | Expected in 2024 | Expected in 2029 | |
Xiong'an – Shangqiu.[1] | 553[1] | under construction | 29 September 2022 | Expected in 2026 | |||
Shangqiu–Hangzhou high-speed railway | Shangqiu – Fuyang West – Hefei | 350[2] | 400 | open | 30 November 2015 | 1 December 2019 | The section from Fuyang West to Hefei is part of the eastern route |
Hefei–Anqing–Jiujiang high-speed railway | Hefei – Anqing West – Jiujiang | 350 | 169 | open | 25 December 2015 | 22 December 2020 | The section from west of Hefei to east of Huangmei is part of the eastern route[3] |
Anqing West – Lushan | 171 | open | 30 September 2017 | 30 December 2021 | |||
Fuyang–Huanggang high-speed railway | Fuyang West – Huanggang East | 350 | 324 | in planning | Expected in 2024 | Expected in 2029 | Western route |
Huanggang–Huangmei high-speed railway | Huanggang East – Huangmei East | 350 | 125 | open | 20 December 2018 | 22 April 2022 | |
Nanchang–Jiujiang high-speed railway | Lushan – Nanchang East | 350 | 137 | under construction | 21 November 2022 | Expected in 2027[4] | |
Nanchang–Ganzhou high-speed railway | Nanchang – Ganzhou West | 350 | 416 | open | 20 October 2014 | 26 December 2019 | |
Ganzhou–Shenzhen high-speed railway | Ganzhou West – Shenzhen North | 350 | 436[5] | open | 20 December 2018 | 10 December 2021 | |
Guangzhou–Shenzhen–Hong Kong Express Rail Link Hong Kong Section | Sham Chun River – Hong Kong West Kowloon | 200 | 39 | open | 16 January 2010 | 23 September 2018 | |
Branch line to Taipei, Taiwan | |||||||
Hefei–Fuzhou high-speed railway | Hefei South – Fuzhou | 350 | 813 | open | 31 December 2009 | 28 June 2015 | |
Nanchang–Fuzhou railway | Nanchang West – Fuzhou | 200 | 636 | open | 23 November 2007 | 26 September 2013 | Fuzhou branch of Xiangtang–Putian railway |
Fuzhou–Pingtan railway | Fuzhou – Pingtan | 200 | 88 | open | 31 October 2013 | 26 December 2020 | |
Pingtan–Taipei high-speed railway | Proposed HSR crossing the Taiwan Straits from Pingtan to Taipei, Taiwan. |
References
[edit]- ^ a b c "河南濮阳回应"京港台高铁丰雄商段将在当地设站":积极争取".
- ^ "Yibin – Guiyang Passenger-Dedicated Line opens". Railway Gazette International. 2019-12-20. Retrieved 2019-12-22.
- ^ "安九高铁安庆至黄梅段开始试运行" [The Anqing-Huangmei section of the Anjiu high-speed railway began trial operation]. 新华网 (in Chinese). Archived from the original on 30 November 2021. Retrieved 25 January 2023.
- ^ "昌九高铁等3条铁路开工建设!". 2022-11-21. Archived from the original on 2022-11-22. Retrieved 2021-11-22.
- ^ "京港高铁赣州至深圳段开通运营 南昌至深圳3小时30分可达" [Beijing-Hong Kong HSR corridor Ganzhou-Shenzhen section started operation, Nanchang to Shenzhen in 3 hours and 30 minutes].