Changgang Station (simplified Chinese: 昌岗站; traditional Chinese: 昌崗站; Jyutping: coeng1 gong1 zaam6; Cantonese Yale: Chēunggōng Jaahm) is an interchange station of Line 2 and Line 8 on the Guangzhou Metro. The underground station is located at the intersection of Changgang Road[1] and Jiangnan Avenue[2] in Haizhu District. It started operation on 25 September 2010.[3]
Chinese name | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Simplified Chinese | 昌岗站 | |||||||||||||||
Traditional Chinese | 昌崗站 | |||||||||||||||
| ||||||||||||||||
General information | ||||||||||||||||
Location | Haizhu District, Guangzhou, Guangdong China | |||||||||||||||
Operated by | Guangzhou Metro Co. Ltd. | |||||||||||||||
Line(s) | ||||||||||||||||
Platforms | 4 (2 island platforms) | |||||||||||||||
Tracks | 4 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Accessible | Yes | |||||||||||||||
Other information | ||||||||||||||||
Station code | 209 819 | |||||||||||||||
History | ||||||||||||||||
Opened | 25 September 2010 | |||||||||||||||
Services | ||||||||||||||||
|
At its first operation day of the station, the number of passenger frequency was over 220,000, so traffic control was needed at the platforms of Line 2.[4]
Station layout
editG | - | Exits A, B, C1, C2, D-F |
L1 Reserved Zone |
- | Reserved for Civil Works |
L2 Concourse |
Lobby | Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities |
Pedestrian subway | ||
L3 Platforms |
Platform 3 | 8 towards Jiaoxin (Baogang Dadao) |
Island Platform, doors will open on the left | ||
Platform 4 | 8 towards Wanshengwei Station (Xiaogang) | |
L4 Platforms |
Platform 2 | 2 towards Guangzhou South Railway Station (Jiangtai Lu) |
Island Platform, doors will open on the left | ||
Platform 1 | 2 towards Jiahewanggang (Jiangnanxi) |
Gallery
edit-
Line 8 concourse
-
Line 2 concourse
-
Transfer stairs
-
Exit A
-
Exit E
-
Exit F
References
edit- ^ simplified Chinese: 昌岗路; traditional Chinese: 昌崗路; pinyin: Chānggǎng Lù; Jyutping: coeng1 gong1 lou6
- ^ 江南大道; Jiāngnán Dàdào; gong1 naam4 daai6 dou6
- ^ Guangzhou Metro New Line 2 and Line 8 Opened on Sept 25th Archived September 28, 2010, at the Wayback Machine
- ^ 地鐵三條新線今開通 22萬客流“逼爆”昌崗站 (in Simplified Chinese). Archived from the original on 2011-07-18. Retrieved 2010-10-07.