Guangzhou Huangpu Tram Line 1 (Chinese: 广州黄埔有轨电车1号线) is a tram line serving the Huangpu District of Guangzhou. The initial section opened on 1 July 2020.[1] The remaining section opened on 28 December 2020. It is 14.3 km (8.9 mi) in length with 20 stations, currently 19 stations are operational.
Guangzhou Huangpu Tram Line 1 | |
---|---|
THP1 | |
Overview | |
Native name | 广州黄埔有轨电车1号线 |
Owner | Guangzhou Development Zone Transport Investment Group |
Locale | Huangpu District, Guangzhou, Guangdong |
Stations | 19 (in operation) 20 (future) |
Service | |
Type | Tram |
System | Guangzhou Trams |
Services | 1 |
Operator(s) | Guangzhou Tram Co., Ltd. |
Depot(s) | Lingfu, Yuyan |
History | |
Opened | 1 July 2020[1] |
Technical | |
Line length | 14.3 km (8.9 mi)[1] |
Number of tracks | 2 |
Character | At-grade, elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Stations
editStation
№ |
Station name[2] | Connections | Distance km |
Location | ||
---|---|---|---|---|---|---|
English[2] | Chinese | |||||
THP1 19 | Xinfeng Lu | 新丰路 | Huangpu | |||
THP1 18 | Xianjiang | 贤江 | ||||
THP1 17 | Xianjiang Park | 贤江公园 | ||||
THP1 16 | Xianjiang West | 贤江西 | ||||
THP1 15 | Lingtou East | 岭头东 | ||||
THP1 14 | Guangzhou Cadre Health Management Center | 干部健康中心 | ||||
THP1 13 | Lingtou | 岭头 | ||||
THP1 12 | Changlingju Primary School | 长岭居小学 | ||||
THP1 11 | Qiangdong | 羌洞 | ||||
THP1 10 | Changping Subway Station | 地铁长平站 | 21 | |||
THP1 09 | Guangzhou Experimental School Affiliated to BNU | 北师大实验学校 | ||||
THP1 08 | Shuixi | 水西 | ||||
THP1 07 | Juntai Lu | 峻泰路 | ||||
THP1 06 | Shuixi Subway Station | 地铁水西站 | 7 21 | |||
THP1 05 | Convention Center | 会议中心 | ||||
THP1 04 | Civic Square | 市民广场 | 6 7 (via Luogang) | |||
THP1 03 | Xiankeng | 线坑 | ||||
THP1 02 | Luogang District Children's Palace | 区少年宫(萝岗) | ||||
Kailuo Dadao (reserved) | 开萝大道 | |||||
THP1 01 | Xiangxue Subway Station | 地铁香雪站 | THP2 6 | |||
See also
editReferences
edit- ^ a b c "官宣:黄埔有轨电车1号线示范段明天开通". 2020-06-30.
- ^ a b "黄埔有轨电车1号线示范段中英文站名新鲜出炉". 2020-06-19.