Thethi et al., 2005 - Google Patents
A fatigue monitoring strategy and implementation on a deepwater top tensioned riserThethi et al., 2005
- Document ID
- 11177745964596838205
- Author
- Thethi R
- Howells H
- Natarajan S
- Bridge C
- Publication year
- Publication venue
- Offshore Technology Conference
External Links
Snippet
A riser fatigue monitoring strategy and implementation on a deepwater Gulf of Mexico Spar top tensioned riser is presented. The paper explains why a fatigue monitoring program is considered necessary to provide the operator with assurance of the riser system …
- 238000005516 engineering process 0 description 7
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS
- G01V1/00—Seismology; Seismic or acoustic prospecting or detecting
- G01V1/16—Receiving elements for seismic signals; Arrangements or adaptations of receiving elements
- G01V1/20—Arrangements of receiving elements, e.g. geophone pattern
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS
- G01V1/00—Seismology; Seismic or acoustic prospecting or detecting
- G01V1/38—Seismology; Seismic or acoustic prospecting or detecting specially adapted for water-covered areas
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS
- G01V1/00—Seismology; Seismic or acoustic prospecting or detecting
- G01V1/40—Seismology; Seismic or acoustic prospecting or detecting specially adapted for well-logging
- G01V1/42—Seismology; Seismic or acoustic prospecting or detecting specially adapted for well-logging using generators in one well and receivers elsewhere or vice versa
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/0006—Measuring stresses in a well bore pipe string or casing
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/01—Devices for supporting measuring instruments on a drill pipe, rod or wireline ; Protecting measuring instruments in boreholes against heat, shock, pressure or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/02—Determining slope or direction
- E21B47/022—Determining slope or direction of the borehole, e.g. using geomagnetism
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/12—Means for transmitting measuring-signals or control signals from the well to the surface or from the surface to the well, e.g. for logging while drilling
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS
- G01V11/00—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS prospecting or detecting by methods combining techniques covered by two or more of main groups G01V1/00 - G01V9/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/01—Risers
- E21B17/012—Risers with buoyancy elements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/01—Risers
- E21B17/015—Non-vertical risers, e.g. articulated or catenary-type
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Thethi et al. | A fatigue monitoring strategy and implementation on a deepwater top tensioned riser | |
US7328741B2 (en) | System for sensing riser motion | |
US7194913B2 (en) | Apparatuses and methods for monitoring stress in steel catenary risers | |
CN101057160B (en) | Method and device for seismic data acquisition | |
EP2616786B1 (en) | Method of determining the tension in a mooring line | |
EP2690468B1 (en) | A streamer for seismic prospection comprising tilt compensation of directional sensors | |
CN208012618U (en) | A kind of sea pipe investigating system | |
US20040065437A1 (en) | In-well seismic sensor casing coupling using natural forces in wells | |
BRPI0905886B1 (en) | "UPHOLDER LIFE CYCLE MANAGEMENT SYSTEM AND METHOD FOR MONITORING AND MANAGING UPPER PIPE ITEMS" | |
EP3325337B1 (en) | Monitoring system and method for vessel mooring | |
US9932815B2 (en) | Monitoring tubing related equipment | |
US10378331B2 (en) | Monitoring integrity of a riser pipe network | |
US20230415854A1 (en) | Monitoring system and method for vessel mooring with position and yaw, roll, and pitch rotational motion | |
Mercan et al. | Comparison of riser fatigue methodologies based on measured motion data | |
McNeill et al. | Exploring the benefits of wellhead fatigue monitoring | |
Zumberge et al. | A towed marine gravity meter for near-bottom surveys | |
McNeill et al. | Wellhead fatigue monitoring during subsea well plug and abandonment activities | |
Furnes et al. | A field study of flow induced vibrations on a deepwater drilling riser | |
Stephen et al. | The seafloor borehole array seismic system (SEABASS) and VLF ambient noise | |
Wei et al. | Development of deepwater riser monitoring systems | |
King et al. | The instrumentation of the conductor of a subsea well in the North Sea to measure the installed conditions and behavior under load | |
Machado et al. | Monitoring program for the first steel catenary riser installed in a moored floating platform in deep water | |
Ruf et al. | The growing use of structural monitoring as part of wellhead and conductor integrity management | |
Stahl et al. | Motion monitoring of a moored floating platform during installation over a subsea template | |
Lower et al. | Dynamic monitoring for analysis verification of snorre TLP rigid risers |