[go: nahoru, domu]

CN106439892A - Mixed powder preparation system with coal and sludge coupling combustion power generation - Google Patents

Mixed powder preparation system with coal and sludge coupling combustion power generation Download PDF

Info

Publication number
CN106439892A
CN106439892A CN201610877253.6A CN201610877253A CN106439892A CN 106439892 A CN106439892 A CN 106439892A CN 201610877253 A CN201610877253 A CN 201610877253A CN 106439892 A CN106439892 A CN 106439892A
Authority
CN
China
Prior art keywords
coal
pulverized
blower fan
mixing
mill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610877253.6A
Other languages
Chinese (zh)
Inventor
施大钟
施登宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Kam Base Environmental Science And Technology Center
Original Assignee
Shanghai Kam Base Environmental Science And Technology Center
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Kam Base Environmental Science And Technology Center filed Critical Shanghai Kam Base Environmental Science And Technology Center
Priority to CN201610877253.6A priority Critical patent/CN106439892A/en
Publication of CN106439892A publication Critical patent/CN106439892A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23KFEEDING FUEL TO COMBUSTION APPARATUS
    • F23K1/00Preparation of lump or pulverulent fuel in readiness for delivery to combustion apparatus
    • F23K1/04Heating fuel prior to delivery to combustion apparatus
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F11/00Treatment of sludge; Devices therefor
    • C02F11/12Treatment of sludge; Devices therefor by de-watering, drying or thickening
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10LFUELS NOT OTHERWISE PROVIDED FOR; NATURAL GAS; SYNTHETIC NATURAL GAS OBTAINED BY PROCESSES NOT COVERED BY SUBCLASSES C10G, C10K; LIQUEFIED PETROLEUM GAS; ADDING MATERIALS TO FUELS OR FIRES TO REDUCE SMOKE OR UNDESIRABLE DEPOSITS OR TO FACILITATE SOOT REMOVAL; FIRELIGHTERS
    • C10L5/00Solid fuels
    • C10L5/02Solid fuels such as briquettes consisting mainly of carbonaceous materials of mineral or non-mineral origin
    • C10L5/04Raw material of mineral origin to be used; Pretreatment thereof
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10LFUELS NOT OTHERWISE PROVIDED FOR; NATURAL GAS; SYNTHETIC NATURAL GAS OBTAINED BY PROCESSES NOT COVERED BY SUBCLASSES C10G, C10K; LIQUEFIED PETROLEUM GAS; ADDING MATERIALS TO FUELS OR FIRES TO REDUCE SMOKE OR UNDESIRABLE DEPOSITS OR TO FACILITATE SOOT REMOVAL; FIRELIGHTERS
    • C10L5/00Solid fuels
    • C10L5/40Solid fuels essentially based on materials of non-mineral origin
    • C10L5/48Solid fuels essentially based on materials of non-mineral origin on industrial residues and waste materials
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23KFEEDING FUEL TO COMBUSTION APPARATUS
    • F23K3/00Feeding or distributing of lump or pulverulent fuel to combustion apparatus
    • F23K3/02Pneumatic feeding arrangements, i.e. by air blast

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • General Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Hydrology & Water Resources (AREA)
  • Water Supply & Treatment (AREA)
  • Treatment Of Sludge (AREA)

Abstract

The invention discloses a mixed powder preparation system with coal and sludge coupling combustion power generation. The mixed powder preparation system comprises a coal mill, a sludge storage bin, a drying pipe, a fan mill, a coarse powder separator, a cyclone separator, a heat exchanger and a mixed draught fan. A discharge port of the coal mill is connected with a combustor of a pulverized coal boiler. The sludge storage bin is connected with a feed port of the drying pipe, a discharge port of the drying pipe is connected with a feed port of the coarse powder separator through the fan mill, a discharge port of the coarse powder separator is connected with a feed port of the cyclone separator, a fine powder outlet of the cyclone separator is connected with a first inlet of the mixed draught fan through the heat exchanger, a coarse powder outlet of the cyclone separator is connected with a second inlet of the mixed draught fan, and an outlet of the mixed draught fan is connected with the combustor of the pulverized coal boiler. The mixed powder preparation system achieves organic combination of coal-fired power generation and sludge drying and combustion and has the beneficial effects of being large in handling capacity, concise in procedure and good in air impermeability.

Description

Coal and the mixing pulverized coal preparation system of mud coupling combustion generating
Technical field
The present invention relates to the mixing powder that coal-fired power generator set field, more particularly, to a kind of coal and mud coupling combustion generate electricity System.
Background technology
Municipal sludge is the discarded object producing in sewage disposal process.According to house and town and country construction portion statistics, year in 2015 End, National urban sewage treatment plant daily handling ability 14028 ten thousand stere, year sewage disposal total amount 428.8 billion cubic meter.Mud Yield has relation with the height of sewage treatment process and standard, accounts for processing the 0.3%-0.5% of the water yield (with moisture content 97% Meter), then the mud of sewage disposal process generation in 2015 reaches hundred million tons of 1.29-2.14.Plurality of heavy metal, pathogen is contained in mud With difficult degradation toxic organic compound, also can emitting offensive odor.If effectively do not process to mud and dispose in addition, can severe contamination ring Border, impact people's is healthy.Therefore, the process of mud and recycling, it has also become the major fields of environmental protection it One.
The pretreatment of mud has the technology such as conditioning, concentration, dehydration, stabilisation and mummification, and the final disposal of mud mainly has Landfill, Land_use change, construction material such as utilize, carry out a biological disposal upon and burn at mode, the emerging technology such as pyrolysis, gasification and pyrohydrolysis Among research and development.
In the above-described techniques, sludge drying-incineration technology quickly grows in recent years.The mud being produced due to sewage treatment plant Still have very high moisture content after mechanical dehydration, calorific value is very low, generally mud is dehydrated and drying and other treatment after, then pass through stove Grate furnace, rotary kiln and fluidized bed incinerator etc. are individually burned, or deliver in boiler of power plant and carry out multifuel combustion with coal.Due to electricity Boiler oil consumption of standing is big, and in-furnace temperature level is high, and flue-gas cleaning devices are perfect, thus dirty based on station boiler cooperative disposal Mud art has the advantages that treating capacity is big, processing speed is fast, innoxious thorough, and application at home is increasing.
At present, because sludge drying-burning engineering that most of thermal power plant puts into operation broadly falls into improvement project, original boiler leads to Often a kind of pulverized coal preparation system of pattern is only joined it is impossible to directly accept the mud of high-moisture percentage according to the characteristic of design coal, thus mend Fill arrangement sludge drying workshop and carry out sludge drying, mummification workshop and steam generator system are relatively independent, and distant, dewatered sludge turns Transport to the coal yard of power plant or special warehouse of sludge, then pulverized coal preparation system is sent into using Belt Conveying mode, or directly pass through spiral shell Rotation conveying, Geldart-D particle enter in stove and burn.Mud after mummification has airborne dust in stacking and course of conveying and foul smell distributes, And the sealing property of belt conveyor system is poor, so easily causing foul smell to spread in plant area and near zone, lead to building ring Border is severe, has a strong impact on the enthusiasm of power plant's burning sludge.
Therefore, Development of Novel pulverized coal preparation system, adapts to common coal and the requirement of mud multifuel combustion on generating plant pulverized coal boiler, is Carry out the important foundation of sludge incineration disposal by thermal power plant, have positive effect for promoting environmental protection.
Content of the invention
Based on this, for above-mentioned technical problem, provide the mixing pulverized coal preparation system that a kind of coal and mud coupling combustion generate electricity.
For solving above-mentioned technical problem, the present invention adopts the following technical scheme that:
A kind of coal and the mixing pulverized coal preparation system of mud coupling combustion generating, including coal pulverizer, warehouse of sludge, drying tube, wind Fan mill, mill separator, cyclone separator, heat exchanger and mixing blower fan, the discharging opening of described coal pulverizer and pulverized-coal fired boiler Burner connect, described warehouse of sludge is connected with the charging aperture of described drying tube, and the discharging opening of described drying tube is through described wind Fan mill is connected with the charging aperture of described mill separator, and the discharging opening of described mill separator connects entering of described cyclone separator Material mouth, the fine powder outlet of described cyclone separator connects the first entrance connecting described mixing blower fan through described heat exchanger, institute The meal outlet stating whirlwind current divider connects second entrance, the outlet of described mixing blower fan and the described coal dust of described mixing blower fan The burner of boiler connects.
This programme also includes deduster, cold smoke blower fan and mixing chamber, and described deduster is located at the cigarette of described pulverized-coal fired boiler Road afterbody, its outlet is connected with the cold smoke import of mixing chamber through described cold smoke blower fan, the hot cigarette import of described mixing chamber with described The high-temperature flue gas extraction opening of pulverized-coal fired boiler connects, and the mixed flue gas outlet of this mixing chamber and the desiccant inlet of described drying tube Connect.
This programme also includes air preheater, the first blower fan and the second blower fan, and described air preheater is located at described coal The flue afterbody of powder boiler, its air intlet is connected with described first blower fan and the second blower fan, and the outlet of its First air and institute State coal pulverizer to connect, Secondary Air outlet is connected with the burner of described pulverized-coal fired boiler.
This programme also includes coal bunker and feeder, and described coal bunker is connected with feeder, described feeder and described coal-grinding Machine connects.
The discharging opening of described drying tube is connected with described fan mill by negative pressure system.
Present system achieves the combination of coal fired power generation, sludge drying and burning, has that treating capacity is big, flow process is simple Advantage clean, that air-tightness is good, it has the advantage that:
(1) direct feed pulverized coal-fan mill sludge drying pulverized coal preparation system and conventional pulverized-coal preparation system is applied in combination it is adaptable to height contains The coupling combustion of water rate mud and coal generates electricity.
(2) complete sludge drying and powder processed in this system it is not necessary to carry out the distance transhipment of dewatered sludge, flow process simultaneously Short, equipment is few;Warehouse of sludge is negative pressure system to fan mill entrance, and fan mill is exported to the company between coal powder fired boiler burner Adapter road is the good steel bearing pipe of air-tightness, can fully avoid the foul smell of effusion in dust and mud to be diffused in environment.
(3) it is sent directly into burner hearth after sludge drying powder in this system, this unit pulverized-coal system avoids mud powder The separation at end and storage link, compared to middle storage formula sludge drying pulverized coal preparation system, can reduce equipment and initial cost, reduce system resistance Power, effectively eliminates the risk of Volatile, slow oxidation and spontaneous combustion during dewatered sludge separates and stores.
(4) this system, to the mummification powder ability of high water content sludge up to more than 100t/h, is advantageously implemented mud Extensive disposal.
Brief description
The present invention is described in detail with reference to the accompanying drawings and detailed description:
Fig. 1 is the structural representation of the present invention.
Specific embodiment
As shown in figure 1, the mixing pulverized coal preparation system that a kind of coal and mud coupling combustion generate electricity, including coal bunker 1, feeder 2, mill Coal machine 3, warehouse of sludge 4, drying tube 5, fan mill 6, mill separator 7, cyclone separator 101, heat exchanger 102 and mixing Blower fan 103.
Coal bunker 1 is connected with feeder 2, and feeder 2 is connected with coal pulverizer 3, the discharging opening of coal pulverizer 3 and pulverized-coal fired boiler 14 Burner 14a connects.
Warehouse of sludge 4 is connected with the charging aperture of drying tube 5, and the discharging opening of drying tube 5 is through fan mill 6 and mill separator 7 Charging aperture connect, the discharging opening of mill separator 7 is connected to the charging aperture of cyclone separator 101, cyclone separator 101 thin Powder outlet connects heat exchanger 102, and heat exchanger 102 reconnects the first entrance of mixing blower fan 103, whirlwind current divider 101 Meal outlet is connected to the second entrance of mixing blower fan 103, the outlet of mixing blower fan 103 and the burner 14a of pulverized-coal fired boiler 14 Connect.Between meal current divider 7 and cyclone separator 101, cyclone separator 101 respectively with heat exchanger 102 and mix blower fan Between 103, heat exchanger 102 with mix between blower fan 103 and mixing blower fan 103 and burner 14a between be all by steel Bearing pipe processed connects.
Preferably, the discharging opening of drying tube 5 is connected with fan mill 6 by negative pressure system.
Raw coal in coal bunker 1 sends into coal pulverizer 3 through feeder 2, and the primary wind and powder mixture of coal pulverizer 3 discharging opening is transported to The burner 14a of pulverized-coal fired boiler 14.
Mud in warehouse of sludge 4 is transported to drying tube 5, contacts and is tentatively done with adding the drier in drying tube 5 Dry, then enter fan mill 6 in the lump with drier, be further dried and be ground to regulation particle diameter, fan mill 6 goes out one's intention as revealed in what one says powder to be mixed Compound enters mill separator 7, and the excessive particle of particle diameter returns and continues grinding, qualified sewage sludge powder and drying in fan mill 6 Weary gas conveys cyclone separator 101 together, and mud powder thicker for particle is delivered to mixing blower fan 103 by cyclone separator 101, and The weary gas being contaminated with the thinner sewage sludge powder of particle then enters heat exchanger 102, is passed through cold water in heat exchanger 102, by with The heat exchange of weary gas, is condensed out the moisture in weary gas further, obtains the weary gas being contaminated with compared with fine sludge powder being more dried It is conveyed into mixing blower fan 103 in the lump, final mixing blower fan 103 is by the primary mixture being further dried pulverized coal conveying boiler 14 Burner 14a, thus more contributing to carrying out mixed combustion in burner 14a and coal dust.
Present system achieves the combination of coal fired power generation, sludge drying and burning, has that treating capacity is big, flow process is simple Advantage clean, that air-tightness is good, it has following features:
(1) direct feed pulverized coal-fan mill sludge drying pulverized coal preparation system and conventional pulverized-coal preparation system is applied in combination it is adaptable to height contains The coupling combustion of water rate mud and coal generates electricity.
(2) complete sludge drying and powder processed in this system it is not necessary to carry out the distance transhipment of dewatered sludge, flow process simultaneously Short, equipment is few;Warehouse of sludge is negative pressure system to fan mill entrance, and fan mill is exported to the company between coal powder fired boiler burner Adapter road is the good steel bearing pipe of air-tightness, can fully avoid the foul smell of effusion in dust and mud to be diffused in environment.
(3) it is sent directly into burner hearth after sludge drying powder in this system, this unit pulverized-coal system avoids mud powder The separation at end and storage link, compared to middle storage formula sludge drying pulverized coal preparation system, can reduce equipment and initial cost, reduce system resistance Power, effectively eliminates the risk of Volatile, slow oxidation and spontaneous combustion during dewatered sludge separates and stores.
(4) this system, to the mummification powder ability of high water content sludge up to more than 100t/h, is advantageously implemented mud Extensive disposal.
The present embodiment also has deduster 8, cold smoke blower fan 9 and mixing chamber 10, and deduster 8 is located at the cigarette of pulverized-coal fired boiler 14 The afterbody of road 14b, its outlet is connected with the cold smoke import of mixing chamber 10 through cold smoke blower fan 9, the hot cigarette import of mixing chamber 10 and coal The high-temperature flue gas extraction opening 14c of powder boiler 14 connects, and the mixed flue gas outlet of this mixing chamber 10 is entered with the drier of drying tube 5 Mouth connects.
High-temperature flue gas from high-temperature flue gas extraction opening 14c are sent in mixing chamber 10 as drier, from cold smoke blower fan 9 Low-temperature furnace smoke equally send in mixing chamber 10 as drier, mud and high-temperature flue gas carry out direct contact heat transfer, and steam The indirectly drying mode such as mummification is compared, and can significantly improve speed and the treatment scale of sludge drying, and due to adopting high temperature Stove cigarette and low-temperature furnace smoke two medium drier, in drier, oxygen content is very low, therefore may insure the security of drying system, keeps away Exempt to explode.
The present embodiment also has air preheater 11, the first blower fan 12 and the second blower fan 13, air preheater 11 located at The afterbody of the flue 14b of pulverized-coal fired boiler 14, its air intlet is connected with the first blower fan 12 and the second blower fan 13, and its First air Outlet is connected with coal pulverizer 3, and Secondary Air outlet is connected with the burner 14a of pulverized-coal fired boiler 14.
First blower fan 12 sucks air from environment, sends into coal pulverizer 3, the second blower fan 13 after air preheater 11 heating Suck air from environment, after air preheater 11 heating, send into burner 14a.
But, those of ordinary skill in the art is it should be appreciated that above embodiment is intended merely to explanation originally Invention, and it is not used as limitation of the invention, as long as in the spirit of the present invention, to embodiment described above Change, modification all will fall in the range of claims of the present invention.

Claims (5)

1. a kind of coal and mud coupling combustion generate electricity mixing pulverized coal preparation system it is characterised in that include coal pulverizer, warehouse of sludge, Drying tube, fan mill, mill separator, cyclone separator, heat exchanger and mixing blower fan, the discharging opening of described coal pulverizer with The burner of pulverized-coal fired boiler connects, and described warehouse of sludge is connected with the charging aperture of described drying tube, the discharging opening of described drying tube It is connected with the charging aperture of described mill separator through described fan mill, the discharging opening of described mill separator connects described whirlwind and divides From the charging aperture of device, the fine powder outlet of described cyclone separator enters through described heat exchanger connects described mixing blower fan first Mouthful, the meal outlet of described whirlwind current divider connects second entrance, the outlet of described mixing blower fan and the institute of described mixing blower fan The burner stating pulverized-coal fired boiler connects.
2. the mixing pulverized coal preparation system of a kind of coal according to claim 1 and the generating of mud coupling combustion is it is characterised in that go back Including deduster, cold smoke blower fan and mixing chamber, located at the flue afterbody of described pulverized-coal fired boiler, its outlet is through institute for described deduster State cold smoke blower fan to be connected with the cold smoke import of mixing chamber, the hot cigarette import of described mixing chamber and the high-temperature flue gas of described pulverized-coal fired boiler Extraction opening connects, and the mixed flue gas outlet of this mixing chamber is connected with the desiccant inlet of described drying tube.
3. the mixing pulverized coal preparation system of a kind of coal according to claim 1 and 2 and the generating of mud coupling combustion, its feature exists In also including air preheater, the first blower fan and the second blower fan, described air preheater is located at the flue of described pulverized-coal fired boiler Afterbody, its air intlet is connected with described first blower fan and the second blower fan, and the outlet of its First air is connected with described coal pulverizer, Secondary Air outlet is connected with the burner of described pulverized-coal fired boiler.
4. the mixing pulverized coal preparation system of a kind of coal according to claim 3 and the generating of mud coupling combustion is it is characterised in that go back Including coal bunker and feeder, described coal bunker is connected with feeder, and described feeder is connected with described coal pulverizer.
5. a kind of coal according to claim 4 and mud coupling combustion generate electricity mixing pulverized coal preparation system is it is characterised in that institute The discharging opening stating drying tube is connected with described fan mill by negative pressure system.
CN201610877253.6A 2016-09-30 2016-09-30 Mixed powder preparation system with coal and sludge coupling combustion power generation Pending CN106439892A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610877253.6A CN106439892A (en) 2016-09-30 2016-09-30 Mixed powder preparation system with coal and sludge coupling combustion power generation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610877253.6A CN106439892A (en) 2016-09-30 2016-09-30 Mixed powder preparation system with coal and sludge coupling combustion power generation

Publications (1)

Publication Number Publication Date
CN106439892A true CN106439892A (en) 2017-02-22

Family

ID=58171854

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610877253.6A Pending CN106439892A (en) 2016-09-30 2016-09-30 Mixed powder preparation system with coal and sludge coupling combustion power generation

Country Status (1)

Country Link
CN (1) CN106439892A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107388263A (en) * 2017-05-05 2017-11-24 江苏绿威环保科技有限公司 A kind of sludge collaboration burning processing system and processing method
CN107557036A (en) * 2017-09-29 2018-01-09 浙江金锅环保科技有限公司 A kind of process units and its production method of highly effective sludge powdered carbon
CN108916884A (en) * 2018-05-22 2018-11-30 华中科技大学 A kind of oxygenation combustion method of coal dust blending rubbish
CN108954277A (en) * 2018-08-06 2018-12-07 西安热工研究院有限公司 One kind is with ball mill pulverized coal preparation system and utilizes flue gas dewatered sludge coupled electricity-generation system
CN110791342A (en) * 2019-11-01 2020-02-14 安徽大学 Method for improving coal combustion by using domestic sludge

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204176665U (en) * 2014-09-30 2015-02-25 上海援梦电力能源科技咨询中心 The pulverized coal preparation system that medium-speed pulverizer and fan mill combine
CN105202549A (en) * 2015-10-20 2015-12-30 上海理工大学 Coal-sludge multi-fuel combustion system based on two-medium flue gas drying and pneumatic transportation
CN105258134A (en) * 2015-10-20 2016-01-20 上海理工大学 Coal-sludge composite firing system based on dual-medium flue gas drying and circulating fluidized bed boiler
JP5888726B2 (en) * 2011-11-17 2016-03-22 三菱日立パワーシステムズ株式会社 Solid fuel boiler system and solid fuel burner
CN206112977U (en) * 2016-09-30 2017-04-19 上海垒锦环境科技中心 Mixed powder process system of coal and mud coupling burning electricity generation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5888726B2 (en) * 2011-11-17 2016-03-22 三菱日立パワーシステムズ株式会社 Solid fuel boiler system and solid fuel burner
CN204176665U (en) * 2014-09-30 2015-02-25 上海援梦电力能源科技咨询中心 The pulverized coal preparation system that medium-speed pulverizer and fan mill combine
CN105202549A (en) * 2015-10-20 2015-12-30 上海理工大学 Coal-sludge multi-fuel combustion system based on two-medium flue gas drying and pneumatic transportation
CN105258134A (en) * 2015-10-20 2016-01-20 上海理工大学 Coal-sludge composite firing system based on dual-medium flue gas drying and circulating fluidized bed boiler
CN206112977U (en) * 2016-09-30 2017-04-19 上海垒锦环境科技中心 Mixed powder process system of coal and mud coupling burning electricity generation

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107388263A (en) * 2017-05-05 2017-11-24 江苏绿威环保科技有限公司 A kind of sludge collaboration burning processing system and processing method
CN107557036A (en) * 2017-09-29 2018-01-09 浙江金锅环保科技有限公司 A kind of process units and its production method of highly effective sludge powdered carbon
CN108916884A (en) * 2018-05-22 2018-11-30 华中科技大学 A kind of oxygenation combustion method of coal dust blending rubbish
CN108954277A (en) * 2018-08-06 2018-12-07 西安热工研究院有限公司 One kind is with ball mill pulverized coal preparation system and utilizes flue gas dewatered sludge coupled electricity-generation system
CN110791342A (en) * 2019-11-01 2020-02-14 安徽大学 Method for improving coal combustion by using domestic sludge

Similar Documents

Publication Publication Date Title
CN106224997A (en) The Combined type pulverizing system generated electricity for coal and mud coupling combustion
CN206112977U (en) Mixed powder process system of coal and mud coupling burning electricity generation
CN105258134B (en) Coal sludge mixture burning control system based on two medium flue gas dryings and CFBB
CN107448920A (en) Biomass, rubbish, sludge and the comprehensive generating system of coal mixed combustion
CN105276603B (en) Coal sludge mixture burning control system based on high temperature flue gas drying and Geldart-D particle
CN106439892A (en) Mixed powder preparation system with coal and sludge coupling combustion power generation
CN105202549B (en) Coal sludge mixture burning control system based on two medium flue gas dryings and Geldart-D particle
CN102889609B (en) Smoke drying steel ball brown-coal milling system
CN106247342A (en) Coal and house refuse coupling combustion system
CN102889608B (en) Direct fired pulverizing system of smoke pre-drying lignite fan mill
CN105318337A (en) Coal-sludge co-combustion system based on high-temperature smoke drying and circulating fluidized bed boiler
CN104033905B (en) System for combustible waste co-processing in cement kiln with bypass exhaust and waste heat power generation
CN104048297B (en) Cement kiln cooperative processing combustible waste and by-pass exhaust power generation complementary system
CN207659297U (en) Sludge drying couples coal generating system
CN106918038A (en) A kind of biomass fuel combustion with reduced pollutants system with blower mill powder
CN111425866A (en) Power station boiler low NO for coupling semicoke and sludge mixed burningxMixed combustion system
CN101642767A (en) Innoxious process of garbage and power generation system and method thereof
CN109797006A (en) A kind of super fine biological matter of flue gas drying powder feeding and coal-fired coupled electricity-generation system and method
CN212408675U (en) Novel sludge drying and incinerating system
CN207471565U (en) Utilize the coal slime of boiler low-temperature fume cycle, drying sludge conveying and combustion system
CN104964286A (en) Sludge treatment method capable of reducing discharge of nitrogen oxide in pulverized coal boiler at the same time
CN111649334A (en) Novel sludge drying and incinerating system and method
CN106322404A (en) Sludge and coal fluidization-suspension coupled combustion system based on direct blowing type high-temperature flue gas drying
CN207729577U (en) A kind of comprehensive generating system of mixed firinor fuel burning
CN104197362B (en) With the furnace smoke drying enclosed powder process coal-burning boiler unit that weary air water reclaims

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170222

RJ01 Rejection of invention patent application after publication