[go: nahoru, domu]

EP0787946A1 - External fluidized bed for equipping a circulating fluidized bed furnace - Google Patents

External fluidized bed for equipping a circulating fluidized bed furnace Download PDF

Info

Publication number
EP0787946A1
EP0787946A1 EP97400213A EP97400213A EP0787946A1 EP 0787946 A1 EP0787946 A1 EP 0787946A1 EP 97400213 A EP97400213 A EP 97400213A EP 97400213 A EP97400213 A EP 97400213A EP 0787946 A1 EP0787946 A1 EP 0787946A1
Authority
EP
European Patent Office
Prior art keywords
chamber
box
fluidized bed
manifold
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP97400213A
Other languages
German (de)
French (fr)
Other versions
EP0787946B1 (en
Inventor
Jean Aubry
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alstom Power Boiler SA
Original Assignee
GEC Alsthom Stein Industrie
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GEC Alsthom Stein Industrie filed Critical GEC Alsthom Stein Industrie
Publication of EP0787946A1 publication Critical patent/EP0787946A1/en
Application granted granted Critical
Publication of EP0787946B1 publication Critical patent/EP0787946B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B31/00Modifications of boiler construction, or of tube systems, dependent on installation of combustion apparatus; Arrangements of dispositions of combustion apparatus
    • F22B31/0007Modifications of boiler construction, or of tube systems, dependent on installation of combustion apparatus; Arrangements of dispositions of combustion apparatus with combustion in a fluidized bed
    • F22B31/0084Modifications of boiler construction, or of tube systems, dependent on installation of combustion apparatus; Arrangements of dispositions of combustion apparatus with combustion in a fluidized bed with recirculation of separated solids or with cooling of the bed particles outside the combustion bed
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28DHEAT-EXCHANGE APPARATUS, NOT PROVIDED FOR IN ANOTHER SUBCLASS, IN WHICH THE HEAT-EXCHANGE MEDIA DO NOT COME INTO DIRECT CONTACT
    • F28D13/00Heat-exchange apparatus using a fluidised bed

Definitions

  • the present invention relates to an external fluidized bed intended to equip a circulating fluidized bed hearth.
  • a dense fluidized bed comprising in a box a chamber into which solids are poured out and equipped with a lower box for supplying fluidizing air, with nozzles for injecting fluidizing air arranged on its lower wall. and a heat exchanger made up of a plurality of parallel arrangements of tubes conveying a heat-transfer fluid, arranged transversely to the chamber and suspended from the upper wall of the chamber, each arrangement of tubes being connected at the bottom to a collector inlet of the heat transfer fluid consisting of a tube disposed longitudinally in the box and in the upper part to an outlet manifold of this heated fluid consisting of a tube disposed longitudinally in the box.
  • the inlet and outlet manifolds are arranged outside the box.
  • the inlet manifold is arranged next to the box and the heat exchange tube arrangements have a first part opening out of the box to connect to this manifold.
  • the outlet manifold is arranged above the box and the heat exchange tube arrangements have a second part opening out of the box to connect to this manifold.
  • the present invention solves these problems and consists of a compactly shaped bed, the manufacture and repair of which are particularly easy and rapid.
  • the inlet manifold is housed in the lower wall of the chamber and the outlet manifold is disposed inside the chamber and is equipped with at least one outlet manifold for the heated heat transfer fluid passing through a wall of the chamber.
  • the outlet manifold is disposed under the upper wall of the chamber and said tube passes through this upper wall.
  • the two collectors are arranged in the longitudinal central plane of the chamber.
  • all the tubes of each tube arrangement are of substantially identical length.
  • the inlet manifold is housed in a slot made in the bottom wall of the chamber and coated with sand.
  • a pipe for supplying heat transfer fluid passes through the fluidization box and is connected to the inlet manifold.
  • the invention also relates to a combustion installation comprising a circulating fluidized bed hearth comprising a gas outlet opening into a separation cyclone whose recovered solids are treated in an external fluidized bed as specified above.
  • Figure 1 is a perspective view of a bed according to the invention, its wall being partially broken away.
  • Figure 2 is a cross-sectional view of this bed.
  • Chamber 2 is equipped with a lower fluidization air supply box 3, nozzles 4 for injecting fluidization air arranged on the lower wall 2A of chamber 2 and a heat exchanger 5 consisting of '' a plurality of parallel arrangements of tubes conveying a heat transfer fluid, for example steam, arranged transversely to the chamber 2 and suspended from the upper wall 2B of the chamber 2, each arrangement of tubes being connected at the bottom to a manifold inlet of the heat transfer fluid 6 consisting of a tube disposed longitudinally in the casing 1 and in the upper part to an outlet manifold of this heated fluid 7 consisting of a tube disposed longitudinally in the casing 1.
  • a heat transfer fluid for example steam
  • Such a bed is generally intended for a combustion installation comprising a circulating fluidized bed hearth comprising a gas outlet opening into a separation cyclone whose recovered solids are treated in this external fluidized bed before being at least partially reinjected into the circulating fluidized bed hearth.
  • the inlet manifold 6 is housed in the bottom wall 2A of the chamber 2 and arranged in the central plane of the chamber 2. More precisely, it is housed in a slot 9 made in the lower wall 2A of the chamber 2 and coated with sand or concrete 16, which ensures its fixing and its protection.
  • a heat transfer fluid supply line 10 passes through the fluidization box 3 and is connected to the inlet manifold 6 by a T-connector.
  • the arrangements of heat exchange tubes which are conventionally essentially horizontal and hairpin and extend to the height of the walls 13, 14.
  • the arrangements are suspended by pair to the upper wall 2B of the chamber 2 by two vertical support tubes 17, 18 which are connected to the inlet manifold 5, pass through the upper wall 2B and return by return sections 17A, 18A connect to the outlet manifold 6 to which the tubes of the tube arrangements are connected.
  • these support tubes 17, 18 can be of the type described in patent document FR-2 622 963 and be secured to the horizontal sections by connecting pieces ensuring both the mechanical support and the hydraulic connection, the support tubes constituting an extension of one of the hairpin tubes.
  • the horizontal hairpin tubes are all of identical length, which eliminates any differential tension in the support tubes 17, 18.
  • the outlet manifold 7 coated with concrete is placed inside the chamber 2, in the longitudinal central plane of the chamber 2 and more precisely under the upper wall 2B of the chamber 2 and is equipped with at least one manifold of outlet of the heated heat transfer fluid 8 passing through this upper wall 2B and connected to the outlet manifold 6 by a T-connector also ensuring the suspension of the outlet manifold 6 from the upper wall 2B.
  • Such a bed allows a particularly improved manufacturing, which reduces manufacturing and assembly times on site.
  • the box 1 without its upper wall can be manufactured in a first assembly, such as an open box.
  • the upper wall with the collectors 5, 6 and the arrangements of suspended tubes can be prefabricated in a second set, in the workshop or on site. It suffices during the final assembly to introduce the second set from above into the first set, the inlet manifold 5 being installed in the slot 9, placed on the metal sheet 20 and then coated with sand or concrete.
  • the complete dismantling of the device is carried out by destruction of the possible concrete 16 and removal from the top of the second set.
  • the coating of the inlet manifold 5 with sand facilitates disassembly thereof and any intervention on it.
  • partial disassembly is carried out by cutting off the pair of damaged tube arrangements and the corresponding support tubes 17, 18 just above and just below the pair of tube arrangements and by translating this pair of arrangements in the box up or down in order to carry out the repair on the cleared tube arrangements.
  • disassembly requires less space than in known beds and it is thus possible to make a bed of less height and size.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Fluidized-Bed Combustion And Resonant Combustion (AREA)
  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
  • Devices And Processes Conducted In The Presence Of Fluids And Solid Particles (AREA)

Abstract

The fluidised bed is located inside a furnace chamber (2) which receives solids. It has a lower fluidising air feed (3) with injector nozzles (4) situated in the chamber's lower wall (2A). The furnace has a heat exchanger (5) made from a series of parallel tubes connected to an inlet manifold (6) embedded in the lower wall of the chamber. The outlet manifold (7) is situated inside the chamber at the top and has at least one outlet pipe (8) for the heated fluid which passes through the chamber's upper wall (2B). The two manifolds are situated in the chamber's central lengthwise plane, with the inlet manifold situated in a lower wall recess and covered with sand or concrete.

Description

La présente invention se rapporte à un lit fluidisé externe destiné à équiper un foyer à lit fluidisé circulant.The present invention relates to an external fluidized bed intended to equip a circulating fluidized bed hearth.

Elle concerne plus précisément un lit fluidisé dense comportant dans un caisson une chambre dans laquelle se déversent des solides et équipée d'une boîte inférieure d'alimentation en air de fluidisation, de buses d'injection d'air de fluidisation disposées sur sa paroi inférieure et d'un échangeur de chaleur constitué d'une pluralité d'agencements parallèles de tubes véhiculant un fluide caloporteur, disposés transversalement à la chambre et suspendus à la paroi supérieure de la chambre, chaque agencement de tubes étant reliés en partie basse à un collecteur d'entrée du fluide caloporteur constitué d'un tube disposé longitudinalement au caisson et en partie haute à un collecteur de sortie de ce fluide chauffé constitué d'un tube disposé longitudinalement au caisson.More precisely, it relates to a dense fluidized bed comprising in a box a chamber into which solids are poured out and equipped with a lower box for supplying fluidizing air, with nozzles for injecting fluidizing air arranged on its lower wall. and a heat exchanger made up of a plurality of parallel arrangements of tubes conveying a heat-transfer fluid, arranged transversely to the chamber and suspended from the upper wall of the chamber, each arrangement of tubes being connected at the bottom to a collector inlet of the heat transfer fluid consisting of a tube disposed longitudinally in the box and in the upper part to an outlet manifold of this heated fluid consisting of a tube disposed longitudinally in the box.

Dans un tel lit fluidisé externe connu, les collecteurs d'entrée et de sortie sont disposés à l'extérieur du caisson. Le collecteur d'entrée est disposé à côté du caisson et les agencements de tubes d'échange de chaleur ont une première partie débouchant hors du caisson pour se relier à ce collecteur. Le collecteur de sortie est disposé au dessus du caisson et les agencements de tubes d'échange de chaleur ont une seconde partie débouchant hors du caisson pour se relier à ce collecteur. Ces parties traversent donc, l'une la paroi latérale, l'autre la paroi supérieure du caisson, formant des protubérances supérieure et latérale dont il faut tenir compte lorsqu'est considéré l'encombrement du lit.In such a known external fluidized bed, the inlet and outlet manifolds are arranged outside the box. The inlet manifold is arranged next to the box and the heat exchange tube arrangements have a first part opening out of the box to connect to this manifold. The outlet manifold is arranged above the box and the heat exchange tube arrangements have a second part opening out of the box to connect to this manifold. These parts therefore cross, one the side wall, the other the upper wall of the box, forming upper and lateral protrusions which must be taken into account when considering the size of the bed.

Par ailleurs, les opérations de montage et de réparation nécessitent d'intervenir sur ces parois, afin de démonter les parties de tubes externes au caisson.Furthermore, assembly and repair operations require intervention on these walls, in order to dismantle the parts of tubes external to the box.

La présente invention résout ces problèmes et consiste en un lit de forme compacte et dont la fabrication et la réparation sont particulièrement aisées et rapides.The present invention solves these problems and consists of a compactly shaped bed, the manufacture and repair of which are particularly easy and rapid.

Pour ce faire, conformément à l'invention, le collecteur d'entrée est logé dans la paroi inférieure de la chambre et le collecteur de sortie est disposé à l'intérieur de la chambre et est équipé d'au moins une tubulure de sortie du fluide caloporteur chauffé traversant une paroi de la chambre.To do this, in accordance with the invention, the inlet manifold is housed in the lower wall of the chamber and the outlet manifold is disposed inside the chamber and is equipped with at least one outlet manifold for the heated heat transfer fluid passing through a wall of the chamber.

Selon le mode de réalisation préféré de l'invention, le collecteur de sortie est disposé sous la paroi supérieure de la chambre et ladite tubulure traverse cette paroi supérieure.According to the preferred embodiment of the invention, the outlet manifold is disposed under the upper wall of the chamber and said tube passes through this upper wall.

De préférence, les deux collecteurs sont disposés dans le plan central longitudinal de la chambre.Preferably, the two collectors are arranged in the longitudinal central plane of the chamber.

Avantageusement, tous les tubes de chaque agencement de tube sont de longueur sensiblement identique.Advantageously, all the tubes of each tube arrangement are of substantially identical length.

De préférence, le collecteur d'entrée est logé dans une fente réalisée dans la paroi inférieure de la chambre et enrobé de sable.Preferably, the inlet manifold is housed in a slot made in the bottom wall of the chamber and coated with sand.

Avantageusement, une canalisation d'alimentation en fluide caloporteur traverse la boite de fluidisation et est connectée au collecteur d'entrée.Advantageously, a pipe for supplying heat transfer fluid passes through the fluidization box and is connected to the inlet manifold.

L'invention concerne également une installation de combustion comportant un foyer à lit fluidisé circulant comportant une sortie des gaz débouchant dans un cyclone de séparation dont les solides récupérés sont traités dans un lit fluidisé externe tel que précisé ci-dessus.The invention also relates to a combustion installation comprising a circulating fluidized bed hearth comprising a gas outlet opening into a separation cyclone whose recovered solids are treated in an external fluidized bed as specified above.

L'invention est décrite ci-après plus en détail à l'aide de figures ne représentant qu'un mode de réalisation préféré de l'invention.The invention is described below in more detail using figures showing only a preferred embodiment of the invention.

La figure 1 est une vue en perpective l'un lit conforme à l'invention, sa paroi étant partiellement arrachée.Figure 1 is a perspective view of a bed according to the invention, its wall being partially broken away.

La figure 2 est une vue en coupe transversale de ce lit.Figure 2 is a cross-sectional view of this bed.

Le lit fluidisé dense comporte dans un caisson 1 constitué d'une tôle métallique 20 renforcée de raidisseurs et d'une couche de béton interne 21, trois chambres:

  • une chambre de réception des solides 11 dans laquelle sont introduits des solides par un orifice 12,
  • une chambre 2 dans laquelle se déversent les solides après leur passage au-dessus d'un premier muret 13,
  • une chambre de sortie 15 des solides partiellement représentée sur la figure 1, recevant les solides après leur passage au-dessus d'un second muret 14 et comportant un orifice d'évacuation des solides non visible sur la figure.
The dense fluidized bed comprises in a box 1 made up of a metal sheet 20 reinforced with stiffeners and an internal concrete layer 21, three chambers:
  • a solid receiving chamber 11 into which solids are introduced through an orifice 12,
  • a chamber 2 into which the solids are discharged after their passage over a first low wall 13,
  • an outlet chamber 15 for the solids partially shown in FIG. 1, receiving the solids after their passage over a second wall 14 and comprising a solids evacuation orifice not visible in the figure.

La chambre 2 est équipée d'une boîte inférieure d'alimentation en air de fluidisation 3, de buses 4 d'injection d'air de fluidisation disposées sur la paroi inférieure 2A de la chambre 2 et d'un échangeur de chaleur 5 constitué d'une pluralité d'agencements parallèles de tubes véhiculant un fluide caloporteur, par exemple de la vapeur, disposés transversalement à la chambre 2 et suspendus à la paroi supérieure 2B de la chambre 2, chaque agencement de tubes étant relié en partie basse à un collecteur d'entrée du fluide caloporteur 6 constitué d'un tube disposé longitudinalement au caisson 1 et en partie haute à un collecteur de sortie de ce fluide chauffé 7 constitué d'un tube disposé longitudinalement au caisson 1.Chamber 2 is equipped with a lower fluidization air supply box 3, nozzles 4 for injecting fluidization air arranged on the lower wall 2A of chamber 2 and a heat exchanger 5 consisting of '' a plurality of parallel arrangements of tubes conveying a heat transfer fluid, for example steam, arranged transversely to the chamber 2 and suspended from the upper wall 2B of the chamber 2, each arrangement of tubes being connected at the bottom to a manifold inlet of the heat transfer fluid 6 consisting of a tube disposed longitudinally in the casing 1 and in the upper part to an outlet manifold of this heated fluid 7 consisting of a tube disposed longitudinally in the casing 1.

Dans cette chambre 2 a donc lieu la fluidisation dense des solides et une récupération de chaleur par l'échangeur 5.In this chamber 2 therefore takes place the dense fluidization of the solids and heat recovery by the exchanger 5.

Un tel lit est en général destiné à une installation de combustion comprenant un foyer à lit fluidisé circulant comportant une sortie des gaz débouchant dans un cyclone de séparation dont les solides récupérés sont traités dans ce lit fluidisé externe avant d'être au moins partiellement réinjectés dans le foyer à lit fluidisé circulant.Such a bed is generally intended for a combustion installation comprising a circulating fluidized bed hearth comprising a gas outlet opening into a separation cyclone whose recovered solids are treated in this external fluidized bed before being at least partially reinjected into the circulating fluidized bed hearth.

Le collecteur d'entrée 6 est logé dans la paroi inférieure 2A de la chambre 2 et disposé dans le plan central de la chambre 2. Plus précisément, il est logé dans une fente 9 réalisée dans la paroi inférieure 2A de la chambre 2 et enrobé de sable ou de béton 16, qui assure sa fixation et sa protection. Une canalisation d'alimentation en fluide caloporteur 10 traverse la boîte de fluidisation 3 et est connectée au collecteur d'entrée 6 par un raccord en Té.The inlet manifold 6 is housed in the bottom wall 2A of the chamber 2 and arranged in the central plane of the chamber 2. More precisely, it is housed in a slot 9 made in the lower wall 2A of the chamber 2 and coated with sand or concrete 16, which ensures its fixing and its protection. A heat transfer fluid supply line 10 passes through the fluidization box 3 and is connected to the inlet manifold 6 by a T-connector.

A ce collecteur d'entrée 6, sont reliés les agencements de tubes d'échange thermique qui sont de façon classique essentiellement horizontaux et en épingle à cheveux et s'étendent jusqu'à la hauteur des murets 13, 14. Les agencements sont suspendus par paire à la paroi supérieure 2B de la chambre 2 par deux tubes porteurs verticaux 17, 18 qui sont connectés au collecteur d'entrée 5, traversent la paroi supérieure 2B et reviennent par des tronçons de retour 17A, 18A se raccorder au collecteur de sortie 6 auquel sont raccordés les tubes des agencements de tubes. Avantageusement, ces tubes supports 17, 18 peuvent être du type de ceux décrits dans le document de brevet FR-2 622 963 et être solidarisés avec les tronçons horizontaux par des pièces de liaison assurant tout à la fois le support mécanique et la connexion hydraulique, les tubes supports constituant un prolongement de l'un des tubes en épingle à cheveux. Les tubes horizontaux en épingle à cheveux sont tous de longueur identique ce qui élimine toute tension différentielle dans les tubes supports 17, 18.To this inlet manifold 6 are connected the arrangements of heat exchange tubes which are conventionally essentially horizontal and hairpin and extend to the height of the walls 13, 14. The arrangements are suspended by pair to the upper wall 2B of the chamber 2 by two vertical support tubes 17, 18 which are connected to the inlet manifold 5, pass through the upper wall 2B and return by return sections 17A, 18A connect to the outlet manifold 6 to which the tubes of the tube arrangements are connected. Advantageously, these support tubes 17, 18 can be of the type described in patent document FR-2 622 963 and be secured to the horizontal sections by connecting pieces ensuring both the mechanical support and the hydraulic connection, the support tubes constituting an extension of one of the hairpin tubes. The horizontal hairpin tubes are all of identical length, which eliminates any differential tension in the support tubes 17, 18.

Le collecteur de sortie 7 enrobé de béton est disposé à l'intérieur de la chambre 2, dans le plan central longitudinal de la chambre 2 et plus précisément sous la paroi supérieure 2B de la chambre 2 et est équipé d'au moins une tubulure de sortie du fluide caloporteur chauffé 8 traversant cette paroi supérieure 2B et raccordée au collecteur de sortie 6 par un raccord en Té assurant également la suspension du collecteur de sortie 6 à la paroi supérieure 2B.The outlet manifold 7 coated with concrete is placed inside the chamber 2, in the longitudinal central plane of the chamber 2 and more precisely under the upper wall 2B of the chamber 2 and is equipped with at least one manifold of outlet of the heated heat transfer fluid 8 passing through this upper wall 2B and connected to the outlet manifold 6 by a T-connector also ensuring the suspension of the outlet manifold 6 from the upper wall 2B.

Plusieurs ensembles de collecteurs et d'agencements de tubes tels que précédemment décrits peuvent être installés dans la chambre 2, alignés dans la direction longitudinale de celle-ci.Several sets of manifolds and tube arrangements as previously described can be installed in chamber 2, aligned in the longitudinal direction thereof.

Un tel lit permet une fabrication particulièrement améliorée, qui réduit les délais de fabrication et de montage sur site.Such a bed allows a particularly improved manufacturing, which reduces manufacturing and assembly times on site.

En effet, le caisson 1 sans sa paroi supérieure peut être fabriqué en un premier ensemble, tel une boîte ouverte. La paroi supérieure avec les collecteurs 5, 6 et les agencements de tubes suspendus peuvent être préfabriqués en un second ensemble, en atelier ou en chantier. Il suffit lors du montage final d'introduire par le haut le second ensemble dans le premier ensemble, le collecteur d'entrée 5 étant installé dans la fente 9, posé sur la tôle métallique 20 puis enrobé de sable ou de béton.Indeed, the box 1 without its upper wall can be manufactured in a first assembly, such as an open box. The upper wall with the collectors 5, 6 and the arrangements of suspended tubes can be prefabricated in a second set, in the workshop or on site. It suffices during the final assembly to introduce the second set from above into the first set, the inlet manifold 5 being installed in the slot 9, placed on the metal sheet 20 and then coated with sand or concrete.

Le démontage complet de l'appareil est réalisé par destruction du béton éventuel 16 et enlèvement par le haut du second ensemble.The complete dismantling of the device is carried out by destruction of the possible concrete 16 and removal from the top of the second set.

L'enrobage par du sable du collecteur d'entrée 5 facilite le démontage de celui-ci et toute intervention sur celui-ci.The coating of the inlet manifold 5 with sand facilitates disassembly thereof and any intervention on it.

En cas de fuite et de réparation nécessaire, un démontage partiel est effectué en sectionnant la paire d'agencements de tubes endommagée et les tubes supports 17, 18 correspondants juste au-dessus et juste au-dessous de la paire d'agencements de tubes et en translatant cette paire d'agencements dans le caisson vers le haut ou vers le bas afin d'opérer la réparation sur les agencements de tubes dégagés.In the event of a leak and necessary repair, partial disassembly is carried out by cutting off the pair of damaged tube arrangements and the corresponding support tubes 17, 18 just above and just below the pair of tube arrangements and by translating this pair of arrangements in the box up or down in order to carry out the repair on the cleared tube arrangements.

En partie haute, le démontage nécessite moins de place que dans les lits connus et il est ainsi possible de réaliser un lit de hauteur et d'encombrement moindres.In the upper part, disassembly requires less space than in known beds and it is thus possible to make a bed of less height and size.

Grâce à cette nouvelle conception du lit, l'échange thermique a lieu dès la sortie du fluide hors du collecteur d'entrée 5 dans les agencements de tubes d'échange thermique, l'ensemble de ces agencements étant à l'intérieur de la chambre 2.Thanks to this new design of the bed, the heat exchange takes place as soon as the fluid leaves the inlet manifold 5 in the arrangements of heat exchange tubes, all of these arrangements being inside the chamber. 2.

Claims (7)

Lit fluidisé dense comportant dans un caisson (1) une chambre (2) dans laquelle se déversent des solides et équipée d'une boite inférieure d'alimentation en air de fluidisation (3), de buses d'injection d'air de fluidisation (4) disposées sur sa paroi inférieure (2A) et d'un échangeur de chaleur (5) constitué d'une pluralité d'agencements parallèles de tubes véhiculant un fluide caloporteur, disposés transversalement à la chambre (2) et suspendus à la paroi supérieure (2B) de la chambre (2), chaque agencement de tubes étant relié en partie basse à un collecteur d'entrée du fluide caloporteur (6) constitué d'un tube disposé longitudinalement au caisson (1) et en partie haute à un collecteur de sortie de ce fluide chauffé (7) constitué d'un tube disposé longitudinalement au caisson (1), caractérisé en ce que le collecteur d'entrée (6) est logé dans la paroi inférieure (2A) de la chambre et en ce que le collecteur de sortie (7) est disposé à l'intérieur de la chambre (2) et est équipé d'au moins une tubulure de sortie du fluide caloporteur chauffé (8) traversant une paroi de la chambre (2).Dense fluidized bed comprising in a box (1) a chamber (2) into which solids are discharged and equipped with a lower box for supplying fluidizing air (3), nozzles for injecting fluidizing air ( 4) arranged on its lower wall (2A) and a heat exchanger (5) consisting of a plurality of parallel arrangements of tubes conveying a heat transfer fluid, arranged transversely to the chamber (2) and suspended from the upper wall (2B) of the chamber (2), each arrangement of tubes being connected in the lower part to an inlet manifold for the heat-transfer fluid (6) consisting of a tube disposed longitudinally in the box (1) and in the upper part to a manifold outlet of this heated fluid (7) consisting of a tube disposed longitudinally to the box (1), characterized in that the inlet manifold (6) is housed in the bottom wall (2A) of the chamber and in that the outlet manifold (7) is arranged inside d e the chamber (2) and is equipped with at least one outlet pipe for the heated heat transfer fluid (8) passing through a wall of the chamber (2). Lit selon la revendication 1, caractérisé en ce que le collecteur de sortie (7) est disposé sous la paroi supérieure (2B) de la chambre (2) et ladite tubulure (8) traverse cette paroi supérieure (2B).Bed according to claim 1, characterized in that the outlet manifold (7) is arranged under the upper wall (2B) of the chamber (2) and said tube (8) passes through this upper wall (2B). Lit selon l'une des revendications précédentes, caractérisé en ce que les deux collecteurs (6, 7) sont disposés dans le plan central longitudinal de la chambre (2).Bed according to one of the preceding claims, characterized in that the two collectors (6, 7) are arranged in the longitudinal central plane of the chamber (2). Lit selon la revendication 3, caractérisé en ce que tous les tubes de chaque agencement de tube sont de longueur sensiblement identique.Bed according to claim 3, characterized in that all the tubes of each tube arrangement are of substantially identical length. Lit selon l'une des revendications précédentes, caractérisé en ce que le collecteur d'entrée (6) est logé dans une fente (9) réalisée dans la paroi inférieure (2A) de la chambre (2) et enrobé de sable.Bed according to one of the preceding claims, characterized in that the inlet manifold (6) is housed in a slot (9) made in the lower wall (2A) of the chamber (2) and coated with sand. Lit selon l'une des revendications précédentes, caractérisé en ce qu'une canalisation d'alimentation en fluide caloporteur (10) traverse la boîte de fluidisation (3) et est connectée au collecteur d'entrée (6).Bed according to one of the preceding claims, characterized in that a supply pipe for heat transfer fluid (10) passes through the fluidization box (3) and is connected to the inlet manifold (6). Installation de combustion comprenant un foyer à lit fluidisé circulant comportant une sortie des gaz débouchant dans un cyclone de séparation dont les solides récupérés sont traités dans un lit fluidisé externe conforme à l'une des revendications précédentes.Combustion installation comprising a circulating fluidized bed hearth comprising a gas outlet opening into a separation cyclone, the recovered solids of which are treated in an external fluidized bed according to one of the preceding claims.
EP97400213A 1996-01-31 1997-01-30 External fluidized bed for equipping a circulating fluidized bed furnace Expired - Lifetime EP0787946B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR9601130 1996-01-31
FR9601130A FR2744037B1 (en) 1996-01-31 1996-01-31 EXTERNAL FLUIDIZED BED FOR FITTING A CIRCULATING FLUIDIZED BED FIREPLACE

Publications (2)

Publication Number Publication Date
EP0787946A1 true EP0787946A1 (en) 1997-08-06
EP0787946B1 EP0787946B1 (en) 2000-06-28

Family

ID=9488661

Family Applications (1)

Application Number Title Priority Date Filing Date
EP97400213A Expired - Lifetime EP0787946B1 (en) 1996-01-31 1997-01-30 External fluidized bed for equipping a circulating fluidized bed furnace

Country Status (10)

Country Link
EP (1) EP0787946B1 (en)
CN (1) CN1078093C (en)
DE (1) DE69702352T2 (en)
DK (1) DK0787946T3 (en)
ES (1) ES2148910T3 (en)
FR (1) FR2744037B1 (en)
GR (1) GR3034383T3 (en)
PT (1) PT787946E (en)
RU (1) RU2161283C2 (en)
ZA (1) ZA97779B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2767380A1 (en) * 1997-08-18 1999-02-19 Gec Alsthom Stein Ind HEAT EXCHANGE DEVICE FOR A FLUIDIZED BED CIRCULATING BOILER
US9631145B2 (en) 2007-11-20 2017-04-25 Ensyn Renewables, Inc. Rapid thermal conversion of biomass
US9670413B2 (en) 2012-06-28 2017-06-06 Ensyn Renewables, Inc. Methods and apparatuses for thermally converting biomass
US9809564B2 (en) 2006-04-03 2017-11-07 Pharmatherm Chemicals, Inc. Thermal extraction method and product
US9951278B2 (en) 2010-05-20 2018-04-24 Ensyn Renewables, Inc. Processes for controlling afterburn in a reheater and for controlling loss of entrained solid particles in combustion product flue gas
US9969942B2 (en) 2011-12-12 2018-05-15 Ensyn Renewables, Inc. Systems and methods for renewable fuel
US10337726B2 (en) 2015-08-21 2019-07-02 Ensyn Renewables, Inc. Liquid biomass heating system
US10400175B2 (en) 2011-09-22 2019-09-03 Ensyn Renewables, Inc. Apparatuses and methods for controlling heat for rapid thermal processing of carbonaceous material
US10400176B2 (en) 2016-12-29 2019-09-03 Ensyn Renewables, Inc. Demetallization of liquid biomass
US10633606B2 (en) 2012-12-10 2020-04-28 Ensyn Renewables, Inc. Systems and methods for renewable fuel
US10794588B2 (en) 2011-09-22 2020-10-06 Ensyn Renewables, Inc. Apparatuses for controlling heat for rapid thermal processing of carbonaceous material and methods for the same
US11028325B2 (en) 2011-02-22 2021-06-08 Ensyn Renewables, Inc. Heat removal and recovery in biomass pyrolysis

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8499702B2 (en) 2010-07-15 2013-08-06 Ensyn Renewables, Inc. Char-handling processes in a pyrolysis system
US9347005B2 (en) 2011-09-13 2016-05-24 Ensyn Renewables, Inc. Methods and apparatuses for rapid thermal processing of carbonaceous material
US9044727B2 (en) 2011-09-22 2015-06-02 Ensyn Renewables, Inc. Apparatuses and methods for controlling heat for rapid thermal processing of carbonaceous material
CN102425965B (en) * 2011-12-01 2013-08-14 兰州节能环保工程有限责任公司 Plate type heat exchanger for granular solid materials

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR934373A (en) * 1945-03-29 1948-05-20 Standard Oil Dev Co Reaction apparatus
US3983927A (en) * 1975-06-25 1976-10-05 Dorr-Oliver Incorporated Heat exchanger for fluidized bed reactor
US4607690A (en) * 1985-11-29 1986-08-26 Foster Wheeler Energy Corporation Tube and support system for a heat exchanger
WO1991017388A1 (en) * 1990-05-08 1991-11-14 Abb Carbon Ab Pfbc power plant
US5095854A (en) * 1991-03-14 1992-03-17 Foster Wheeler Development Corporation Fluidized bed reactor and method for operating same utilizing an improved particle removal system
US5239946A (en) * 1992-06-08 1993-08-31 Foster Wheeler Energy Corporation Fluidized bed reactor system and method having a heat exchanger

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR934373A (en) * 1945-03-29 1948-05-20 Standard Oil Dev Co Reaction apparatus
US3983927A (en) * 1975-06-25 1976-10-05 Dorr-Oliver Incorporated Heat exchanger for fluidized bed reactor
US4607690A (en) * 1985-11-29 1986-08-26 Foster Wheeler Energy Corporation Tube and support system for a heat exchanger
WO1991017388A1 (en) * 1990-05-08 1991-11-14 Abb Carbon Ab Pfbc power plant
US5095854A (en) * 1991-03-14 1992-03-17 Foster Wheeler Development Corporation Fluidized bed reactor and method for operating same utilizing an improved particle removal system
US5239946A (en) * 1992-06-08 1993-08-31 Foster Wheeler Energy Corporation Fluidized bed reactor system and method having a heat exchanger

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2767380A1 (en) * 1997-08-18 1999-02-19 Gec Alsthom Stein Ind HEAT EXCHANGE DEVICE FOR A FLUIDIZED BED CIRCULATING BOILER
EP0898116A1 (en) * 1997-08-18 1999-02-24 GEC ALSTHOM Stein Industrie Heat exchange device for a circulating fluidized bed boiler
US9809564B2 (en) 2006-04-03 2017-11-07 Pharmatherm Chemicals, Inc. Thermal extraction method and product
US9631145B2 (en) 2007-11-20 2017-04-25 Ensyn Renewables, Inc. Rapid thermal conversion of biomass
US10544368B2 (en) 2007-11-20 2020-01-28 Ensyn Renewables, Inc. Rapid thermal conversion of biomass
US9951278B2 (en) 2010-05-20 2018-04-24 Ensyn Renewables, Inc. Processes for controlling afterburn in a reheater and for controlling loss of entrained solid particles in combustion product flue gas
US10563127B2 (en) 2010-05-20 2020-02-18 Ensyn Renewables, Inc. Processes for controlling afterburn in a reheater and for controlling loss of entrained solid particles in combustion product flue gas
US11028325B2 (en) 2011-02-22 2021-06-08 Ensyn Renewables, Inc. Heat removal and recovery in biomass pyrolysis
US10400175B2 (en) 2011-09-22 2019-09-03 Ensyn Renewables, Inc. Apparatuses and methods for controlling heat for rapid thermal processing of carbonaceous material
US10794588B2 (en) 2011-09-22 2020-10-06 Ensyn Renewables, Inc. Apparatuses for controlling heat for rapid thermal processing of carbonaceous material and methods for the same
US10570340B2 (en) 2011-12-12 2020-02-25 Ensyn Renewables, Inc. Systems and methods for renewable fuel
US9969942B2 (en) 2011-12-12 2018-05-15 Ensyn Renewables, Inc. Systems and methods for renewable fuel
US10975315B2 (en) 2011-12-12 2021-04-13 Ensyn Renewables, Inc. Systems and methods for renewable fuel
US9670413B2 (en) 2012-06-28 2017-06-06 Ensyn Renewables, Inc. Methods and apparatuses for thermally converting biomass
US10633606B2 (en) 2012-12-10 2020-04-28 Ensyn Renewables, Inc. Systems and methods for renewable fuel
US10640719B2 (en) 2013-06-26 2020-05-05 Ensyn Renewables, Inc. Systems and methods for renewable fuel
US10948179B2 (en) 2015-08-21 2021-03-16 Ensyn Renewables, Inc. Liquid biomass heating system
US10337726B2 (en) 2015-08-21 2019-07-02 Ensyn Renewables, Inc. Liquid biomass heating system
US10400176B2 (en) 2016-12-29 2019-09-03 Ensyn Renewables, Inc. Demetallization of liquid biomass
US10982152B2 (en) 2016-12-29 2021-04-20 Ensyn Renewables, Inc. Demetallization of liquid biomass

Also Published As

Publication number Publication date
GR3034383T3 (en) 2000-12-29
EP0787946B1 (en) 2000-06-28
ZA97779B (en) 1997-08-13
DK0787946T3 (en) 2000-10-16
ES2148910T3 (en) 2000-10-16
RU2161283C2 (en) 2000-12-27
PT787946E (en) 2000-12-29
DE69702352T2 (en) 2001-02-15
CN1167651A (en) 1997-12-17
DE69702352D1 (en) 2000-08-03
FR2744037B1 (en) 1998-02-27
CN1078093C (en) 2002-01-23
FR2744037A1 (en) 1997-08-01

Similar Documents

Publication Publication Date Title
EP0787946A1 (en) External fluidized bed for equipping a circulating fluidized bed furnace
EP1772670B1 (en) Circulating fluidised bed furnace provided with a convertible combustion process
FR2486223A1 (en) HEAT EXCHANGER WITH FLUIDIZED BED
KR101167514B1 (en) Centrifugal separator assembly
NL8303096A (en) HEAT EXCHANGER WITH A FLUIDIZED BED.
FR2466706A1 (en) HEATER OR STEAM GENERATOR WITH FLUIDIZED BED AND LOW SIZE
EP0320403B1 (en) Cooled fluidisation grid
EP0694749B1 (en) Solid particle cooling device at the outlet of a treatment arrangement
EP0879271A1 (en) Plant for treating waste products by injecting hot gas in the load to be treated and recycling the resulting thermolysis gases
EP0864834B1 (en) Heat exchanger with dense fluidized bed combined with a reactor with circulating fluidized bed
EP0867680B1 (en) Space saving heat exchanger
FR2547899A1 (en) COMPACT FLUIDIZED BED BOILER
EP2012073B1 (en) Heat exchanger for a boiler, boiler having such a heat exchanger and method for producing such a heat exchanger
EP0044316A1 (en) Spouted and fluidised bed combustors
FR2752926A1 (en) Fluid heat exchanger
BE465328A (en)
FR2535026A1 (en) Boiler using wood or other solid combustible materials
FR2602313A1 (en) Heat recovery apparatus for heating facilities
FR2547648A1 (en) Condensation boiler
FR2497926A1 (en) Sectional boiler working at reduced pressure - has integral insulation to provide hot water or low pressure vapour
FR2614393A1 (en) Method and device for improving the heat production of an incinerating furnace
BE434989A (en)
BE487579A (en)
FR2855593A1 (en) Exterior fluidized bed for combustion installation, has stiffeners placed on one another to constitute continuous conduit, where stiffeners are spaced by distance greater than diameter of heat exchange tubes
FR2612614A3 (en) Heating boiler, in particular for use at low temperature

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): BE DE DK ES GB GR IT PT SE

17P Request for examination filed

Effective date: 19971206

17Q First examination report despatched

Effective date: 19990504

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: ALSTOM ENERGY SYSTEMS S.A.

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): BE DE DK ES GB GR IT PT SE

REF Corresponds to:

Ref document number: 69702352

Country of ref document: DE

Date of ref document: 20000803

GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

Effective date: 20000724

ITF It: translation for a ep patent filed
REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2148910

Country of ref document: ES

Kind code of ref document: T3

REG Reference to a national code

Ref country code: PT

Ref legal event code: SC4A

Free format text: AVAILABILITY OF NATIONAL TRANSLATION

Effective date: 20000911

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PT

Payment date: 20011221

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GR

Payment date: 20011228

Year of fee payment: 6

REG Reference to a national code

Ref country code: GB

Ref legal event code: IF02

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DK

Payment date: 20020102

Year of fee payment: 6

Ref country code: SE

Payment date: 20020102

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20020220

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20021227

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20030131

Ref country code: DK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20030131

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20030131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20030731

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20030804

REG Reference to a national code

Ref country code: DK

Ref legal event code: EBP

EUG Se: european patent has lapsed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20040108

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20040122

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20040130

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20040130

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

Effective date: 20050130

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20050131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20050802

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20050131