[go: nahoru, domu]

KR20050081019A - Intelligent direct digital controller for business building facilities to perform optimal and energy-saving management - Google Patents

Intelligent direct digital controller for business building facilities to perform optimal and energy-saving management Download PDF

Info

Publication number
KR20050081019A
KR20050081019A KR1020040009241A KR20040009241A KR20050081019A KR 20050081019 A KR20050081019 A KR 20050081019A KR 1020040009241 A KR1020040009241 A KR 1020040009241A KR 20040009241 A KR20040009241 A KR 20040009241A KR 20050081019 A KR20050081019 A KR 20050081019A
Authority
KR
South Korea
Prior art keywords
control
control information
unit
input
valve
Prior art date
Application number
KR1020040009241A
Other languages
Korean (ko)
Other versions
KR100557672B1 (en
Inventor
백강철
양인호
Original Assignee
바스코리아 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 바스코리아 주식회사 filed Critical 바스코리아 주식회사
Priority to KR1020040009241A priority Critical patent/KR100557672B1/en
Publication of KR20050081019A publication Critical patent/KR20050081019A/en
Application granted granted Critical
Publication of KR100557672B1 publication Critical patent/KR100557672B1/en

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • H04L67/125Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks involving control of end-device applications over a network
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L69/00Network arrangements, protocols or services independent of the application payload and not provided for in the other groups of this subclass
    • H04L69/08Protocols for interworking; Protocol conversion

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • General Health & Medical Sciences (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Computer Security & Cryptography (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computing Systems (AREA)
  • Medical Informatics (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

본 발명에 따른 사무용 건물설비의 최적관리 및 에너지 절감을 위한 지능형 제어정보기는 백넷(BACnet) MS/TP 프로토콜에 의하여 다른 제어정보기와 통신 가능한 MS/TP 프로토콜 모듈(90), 및 현장기기를 제어하는 임베디드 제어부(800)로 구성되고, 이 중 임베디드 제어부(800)는 현장기기와의 입출력신호를 변환하는 A/D 변환 및 D/A 변환부(870), 각각의 현장기기에 대응하는 다수의 제어루프들을 내장하여 제어 및 연산작용을 수행하는 제어연산부(810), 운용프로그램 및 기타 작동에 필요한 정보를 저장하는 제1메모리(850), 상기 MS/TP 프로토콜 모듈(90)과 데이터를 송수신하는 제1 MS/TP 인터페이스(820), 백넷 규격에 정의된 표준 오브젝트와 서비스 기능을 제공하며 상기 제1 MS/TP 인터페이스(820)를 통해 데이터를 송수신하고 백넷 프로토콜의 변환, 해석을 담당하는 백넷 프로토콜 스택(830), 상기 백넷 프로토콜 스택(830)과 데이터를 주고 받으며 이더넷(Ethernet) 통신망을 통해 상위 레벨의 관리장치 또는 서버들과 연계되는 이더넷 인터페이스(840), 상기 제어정보기(80)의 동작상태를 표시하는 표시부(880), 사용자로부터 키 명령을 입력받는 키입력부(890), 및 상기 A/D 변환 및 D/A 변환부(870)와 상기 제어연산부(810) 사이에서 물리적인 입출력값을 소프트웨어적으로 처리가능하도록 변환하는 입출력 인터페이스(860)를 구비한다. 본 발명에 따른 지능형 제어정보기는 기존의 제어정보기 보다 많은 상세 관리 포인트들을 수용하여 건물내 설비별 운전정보와 건물 내외의 각종 실시간 환경정보를 계측함으로써 에너지 절감 및 시설관리의 예방보전을 달성할 수 있고, 백넷(BACnet)을 통신 프로토콜로 채택하여 빌딩 자동제어시스템의 개방성 및 범용성을 제고할 수 있다. Intelligent control information for optimal management and energy saving of office building equipment according to the present invention is to control the MS / TP protocol module 90 and the field equipment to communicate with other control information by the BACnet MS / TP protocol The embedded control unit 800, among which the embedded control unit 800 is an A / D conversion and D / A conversion unit 870 for converting input and output signals with the field device, a plurality of controls corresponding to each field device A control operation unit 810 for embedding loops to perform control and arithmetic operations, a first memory 850 for storing an operation program and other operations, and a data transceiving data with the MS / TP protocol module 90. 1 MS / TP interface 820 provides a standard object and service function defined in the Bacnet standard, and is a back that is responsible for transmitting and receiving data through the first MS / TP interface 820 and converting and interpreting Bacnet protocol. An Ethernet interface 840 and the control information device 80 that exchange data with the Net protocol stack 830 and the backnet protocol stack 830 and are connected to higher level management devices or servers through an Ethernet communication network. A display unit 880 for displaying an operation state of the display unit, a key input unit 890 for receiving a key command from a user, and a physical connection between the A / D conversion and D / A conversion unit 870 and the control operation unit 810. And an input / output interface 860 for converting the input / output values so that they can be processed by software. The intelligent control information device according to the present invention accommodates more detailed management points than existing control information devices and can measure operation information for each facility in the building and various real-time environmental information inside and outside the building to achieve energy conservation and preventive maintenance of facility management. In addition, BACnet can be adopted as a communication protocol to enhance the openness and versatility of the automatic building control system.

Description

사무용 건물설비의 최적관리 및 에너지 절감을 위한 지능형 제어정보기{Intelligent direct digital controller for business building facilities to perform optimal and energy-saving management}Intelligent direct digital controller for business building facilities to perform optimal and energy-saving management}

본 발명은 사무용 건물설비의 최적관리 및 에너지 절감을 위한 지능형 제어정보기에 관한 것으로서, 특히 사무용 건물의 각종 현장기기류에 설정된 관제점들을 통하여 상세 정보를 수집 분석하고 자동제어 방식에 의하여 쾌적한 사무환경을 유지하고 에너지 소비를 절감하며, 다른 현장기기 및 제어정보기와의 원활한 정보교환을 위하여 개방형 표준 프로토콜을 채택함으로써 시스템간의 통합 및 정보의 공유, 백업, 개방 및 표준화를 지원하는 지능형 제어정보기에 관한 것이다. The present invention relates to an intelligent control information device for optimal management and energy saving of office building equipment, and in particular, collects and analyzes detailed information through control points set in various field devices of an office building and maintains a pleasant office environment by an automatic control method. The present invention relates to an intelligent control information controller that supports the integration and sharing of information, backup, open and standardization between systems by adopting an open standard protocol for smooth information exchange with other field devices and control information.

최근의 사무용 건물들은 대형화·고기능화되어 공조, 위생, 전력, 방범, 방재 등의 각종 설비들이 복잡하게 조합되어 있다. 이러한 각종 설비들을 감시하고 제어하기 위하여 구축된 빌딩 자동화 시스템(BAS: Building Automation System)은 중앙감시시스템(CCMS: Central Control Management System), 제어정보기(DDC: Direct Digital Controller) 및 현장기기류(Local Devices)로 구성된다. Recently, office buildings have been enlarged and highly functional, and various facilities such as air conditioning, sanitation, electric power, crime prevention, and disaster prevention are intricately combined. Building Automation System (BAS), which is built to monitor and control these facilities, includes Central Control Management System (CCMS), Direct Digital Controller (DDC) and Local Devices (Local Devices). It is composed of

빌딩 자동화 시스템을 운용함에 있어서는 각종 설비 및 시스템(공조제어, 전력제어, 조명제어, 주차관제, 엘리베이터 등에 대한 감시제어 시스템)상호간의 제어 및 감시에 필요한 많은 정보를 공유하기 위하여 신뢰성 높고 속도가 매우 빠른 통신 인프라를 구축하는 것이 필수적인데, 이러한 건물자동화에 관련된 통신방식의 국제적인 표준으로서 백넷(BACnet: Building Automation & Control Network)이 채택되었으며, 최근 우리나라에서도 백넷을 KSC6909 표준규격으로 제정한 바 있다.In operating the building automation system, it is reliable and fast to share a lot of information necessary for the control and monitoring of various facilities and systems (air conditioning control, power control, lighting control, parking control, elevator, etc.). It is essential to establish a communication infrastructure. BACnet (Building Automation & Control Network) has been adopted as an international standard of communication method related to building automation. Recently, BACNET was established in Korea as KSC6909 standard.

도1은 사무용 건물에 적용되는 통합 빌딩자동제어시스템의 전체 구성도로서, 열원 및 공조설비 감시제어, 전력 및 조명설비 감시제어, 출입통제, 방재, 주차관리 및 시설관리 기능이 통합된 시스템의 구성을 도시한다. 도2는 도1에 도시된 빌딩자동제어시스템 중 공조설비 제어 시스템의 구성도이고, 도3은 조명 제어 시스템의 구성도이며, 도4는 전력 감시 시스템의 구성도이다. 1 is an overall configuration diagram of an integrated building automatic control system applied to an office building, heat source and air conditioning equipment monitoring control, power and lighting equipment monitoring control, access control, disaster prevention, parking management and facility management system integrated To show. FIG. 2 is a block diagram of an air conditioning facility control system of the building automatic control system shown in FIG. 1, FIG. 3 is a block diagram of a lighting control system, and FIG. 4 is a block diagram of a power monitoring system.

도1 내지 도4를 참조하여 통합화된 빌딩자동제어시스템의 계층적 구성요소를 설명하면 다음과 같다. 1 to 4, the hierarchical components of an integrated building automatic control system will be described.

우선, 도1에서 중앙감시 시스템(20)은 건물 전체의 상황을 종합적으로 감시 제어하는 역할을 하는 가장 중요한 시스템으로, 주 BA 서버(Primary Building Automation Server; 21), 백업 BA 서버(Backup Building Automation Server; 22), 기계설비 운영자 스테이션(23), 조명/전력 운영자 스테이션(24), 출입통제 스테이션(25), 방재스테이션(26), 주차 관리 스테이션(ITS Station: Intelligent Transport System Station; 27) 및 시설관리 스테이션(FMS: Facility Management System; 28)으로 구성된다. 이때, 상기 각 서버 및 스테이션들은 리던던시 10베이스-T 이더넷 스위치 허브(Redundancy 10Base-T Ethernet Switch Hub; 10)에 의해 상호 연결되어 통신 및 정보공유가 가능하다. First, in FIG. 1, the central monitoring system 20 is the most important system that comprehensively monitors and controls the situation of the entire building. The primary building automation server 21 and the backup building automation server 22), hardware operator station 23, lighting / power operator station 24, access control station 25, disaster prevention station 26, parking management station (ITS Station: Intelligent Transport System Station; 27) and facilities It consists of a management station (FMS: Facility Management System; 28). At this time, each of the servers and stations are connected to each other by a redundant 10Base-T Ethernet Switch Hub (10) to enable communication and information sharing.

다음으로, 제어정보기(DDC)는 각종의 센서 및 조작기들에 설정된 관제점을 통해 빌딩내 건축설비들의 제어출력과 상태 변화 등 모든 설비관련 정보를 기록·저장하고, 내장된 제어로직에 따라 소프트웨어적 연산과정을 거쳐 조작부에 제어동작신호를 인가하는 마이크로 컴퓨터로서, 게이트웨이 및/또는 통신 네트워크를 통해 중앙감시 시스템(20)과 연결되어 필요한 정보를 주고 받는다. 도1의 칠러/부스터 인터페이스(Chiller/Booster Interface; 30), 제어정보기(41,51), 조명설비제어용 노드(60)와 피엘시(PLC: Programmable Logic Control; 70)가 이러한 제어정보기에 해당되며, 이와 같이 공조기, 열원, 전력설비 등을 총괄적으로 관제하는 제어정보기를 시스템 레벨 제어정보기(System Level DDC)라고 한다. Next, the control information device (DDC) records and stores all equipment-related information such as control outputs and state changes of building facilities in the building through control points set in various sensors and manipulators, and software according to the built-in control logic. A microcomputer that applies a control operation signal to an operation unit through an arithmetic operation, is connected to the central monitoring system 20 through a gateway and / or a communication network to exchange necessary information. The Chiller / Booster Interface 30 of FIG. 1, the control information devices 41 and 51, the lighting equipment control node 60 and the PLC (Programmable Logic Control 70) correspond to such control information. As such, the control information that collectively controls the air conditioner, the heat source, and the power equipment is called a system level control information (System Level DDC).

존 제어정보기(Zone DDC; 53)는 건물내의 실내공간을 여러 개의 존(Zone)으로 나누어 가변풍량(VAV: Variable Air Volume) 방식을 적용할 경우 실내온도조절기(54)와 가변풍량유닛(VAV Unit; 55)을 제어하는 존 레벨의 제어정보기로서, 상기 시스템 레벨 제어정보기(30,41,51,60,70)와는 네트워크의 계층적 구조 또는 설치위치에 의하여 구별된다. Zone control information (Zone DDC) 53 divides the interior space in the building into several zones (Zone), when the variable air volume (VAV) method is applied to the indoor temperature controller 54 and the variable air volume unit (VAV) A zone level control information controller for controlling a unit 55, which is distinguished from the system level control information devices 30, 41, 51, 60, and 70 by a hierarchical structure or an installation position of a network.

마지막으로, 현장기기류는 온도, 습도, 압력, 풍속, 지문, 화재, 주차, 전력 등을 계측하기 위한 각종 센서와 댐퍼조작기, 밸브조작기 등의 각종 조작기(Actuator) 및 댐퍼, 밸브 등으로 구성된다. Finally, field equipment is composed of various sensors for measuring temperature, humidity, pressure, wind speed, fingerprint, fire, parking, power, etc., various actuators such as damper controls, valve controls, dampers, and valves.

도1 내지 도4에 도시된 빌딩자동제어시스템의 본질적인 목적은 건물내의 기계설비, 통신설비, 전기설비 등 각종 시설장비를 감시 및 제어하여 에너지 및 인력의 절감, 소요공간의 감소화, 정보의 집중화 및 설비의 유기적 연결화를 통한 관리의 효율성을 도모하여 쾌적한 실내환경조건을 유지하는 데 있다. The essential purpose of the automatic building control system shown in Figures 1 to 4 is to monitor and control various equipment such as mechanical equipment, communication equipment, electrical equipment in the building to reduce energy and manpower, reduce the required space, centralize information And to maintain the pleasant indoor environment conditions by promoting the efficiency of management through the organic connection of the facilities.

이와 같은 빌딩 자동제어시스템의 목적을 현재의 기술수준과 비교하여 개선이 필요한 점을 찾아보면, 첫째, 건물의 열원 및 냉난방 설비에 소비되는 에너지를 보다 절감할 수 있는 자동제어시스템의 개발이 시급하다고 할 수 있다. 특히, 에너지절감을 위한 최적관리 시스템(OMS: Optimal Management System)을 구축하기 위해서는 우선적으로 설비별 운전정보와 건물 내외의 각종 실시간 환경정보를 계측하여 수집, 정리할 수 있는 제어정보기와 이러한 정보를 통신네트워크를 통해 최적관리 시스템으로 전송할 수 있는 통신 인프라가 갖추어져야 한다. 그러나, 현재까지는 건물의 최적관리를 위해 필요한 운전정보와 건물내 각 실별 정보를 확보할 수 있는 제어정보기가 아직 개발되지 않은 상태라 건물내 에너지 사용의 최적관리가 어려운 형편이다.The purpose of the building automatic control system compared with the current technology level is to find out the need for improvement. First, it is urgent to develop an automatic control system that can further reduce the energy consumed in the building's heat source and air conditioning equipment. can do. In particular, in order to establish an optimal management system (OMS) for energy saving, a control information that can measure, collect, and organize the operation information of each facility and various real-time environmental information inside and outside the building and the communication network Communication infrastructure that can be transmitted through the optimal management system should be prepared. However, until now, operation information necessary for optimal management of buildings and control information to secure information for each room in the building have not been developed yet, so optimal management of energy use in buildings is difficult.

둘째, 건물의 에너지 효율을 최적 상태로 유지하고 설비기기를 오랫동안 무사히 사용하기 위해서는 적시에 점검하고 보수하는 등 유지관리를 잘 하여야 하는데, 이러한 유지관리의 방법으로는 사용연한이 경과되거나 고장난 설비를 교체하는 사후보전(BM: Breakdown Maintenance)의 방법과 미리 고장의 원인을 파악하여 사전에 대처하는 예방보전(PM: Preventive Maintenance) 또는 예지보전의 방법이 있다. 이 중, 사후보전의 방법보다는 예방보전 또는 예지보전의 방법이 비용이 적게 들고 에너지 절약에도 도움이 되므로 바람직하다. Second, in order to keep the energy efficiency of the building in optimum condition and to use the equipment safely for a long time, it must be well-maintained, such as timely inspection and repair. There is a method of breakdown maintenance (BM) and preventive maintenance (PM) or predictive maintenance that identify the cause of the failure in advance and proactively deal with it. Among these, the method of preventive maintenance or predictive maintenance is preferable because it is less expensive and helps to save energy than the method of post maintenance.

그러나, 기존의 건물에 적용되는 시설관리 시스템은 대부분 시설관리자의 업무적인 측면을 단순히 전산화한 것에 불과하여 설비기기의 효율성 및 노후화 정도를 측정하는데 필요한 관제점들을 갖지 못하였기 때문에 위의 예방보전 또는 예지보전의 방법을 적용할 수 없는 문제점이 있었다. 또한, 기존의 시설관리 시스템은 빌딩 자동제어시스템의 분산제어를 담당하는 제어정보기(DDC)와의 인터페이스가 없었기 때문에 설비상태를 고려하여 운전조건을 설정할 수 없다는 문제점이 있었다. However, the existing facility management system applied to existing buildings is merely a computerized aspect of the facility manager's business, and it does not have the necessary control points for measuring the efficiency and aging of the equipment. There was a problem that the method of preservation could not be applied. In addition, the existing facility management system has a problem that it is not possible to set the operating conditions in consideration of the facility status because there is no interface with the control information device (DDC) responsible for distributed control of the automatic building control system.

마지막으로, 빌딩 자동제어시스템을 항상 최적으로 유지하기 위해서는 새로 개발되어 추가되는 제어기, 조작기, 밸브, 댐퍼 및 센서들을 손쉽게 통합하여 네트워크를 구성할 수 있는 개방적인 프로토콜을 사용하는 것이 바람직하다. 그러나, 기존의 빌딩 자동제어시스템용 장비들은 각 제조사마다 고유의 통신 프로토콜을 사용한 것이기 때문에 다른 제조사의 장비와는 호환성이 보장되지 않으며, 이에 따라 새로운 설비의 추가가 어렵고, 설비를 추가하고자 할 때에 비용부담이 큰 단점이 있었다.Finally, in order to maintain optimal building automation systems at all times, it is desirable to use open protocols for easily integrating newly developed controllers, manipulators, valves, dampers and sensors to form a network. However, since existing building automatic control system equipment uses a unique communication protocol for each manufacturer, it is not guaranteed to be compatible with equipment of other manufacturers. Therefore, it is difficult to add new equipment, and the cost of adding equipment There was a big disadvantage.

본 발명은 상기 첫 번째 문제점을 극복하기 위하여 건물내 설비별 운전정보와 건물 내외의 각종 실시간 환경정보를 계측하여 수집, 정리하고 건물내 각 실에 대한 재실자의 환경 요구 수준을 예측하여 설비의 정격특성에 맞는 최적 운전을 수행할 수 있는, 사무용 건물설비의 최적관리 및 에너지 절감을 위한 지능형 제어정보기를 제공하는 것을 목적으로 한다. In order to overcome the first problem, the present invention measures and collects and organizes operation information for each facility in a building and various real-time environmental information inside and outside the building, and predicts the environmental requirements of the occupants for each room in the building to evaluate the rated characteristics of the facility. The purpose of the present invention is to provide intelligent control information for optimal management and energy saving of office building equipment that can perform optimal operation.

또한, 본 발명은 상기 두 번째 문제점을 극복하기 위하여 건물내 설비의 노후화 정도, 성능, 효율 등을 판정하는 데 필요한 진동, 온도, 압력, 전압, 전류계측 등의 다양한 관제점의 입력신호를 받아들여 분석함으로써 건물 설비 관리에 있어 예방보전 또는 예지보전을 가능하게 하는, 사무용 건물설비의 최적관리 및 에너지절감을 위한 지능형 제어정보기를 제공하는 것을 목적으로 한다. In addition, the present invention accepts input signals of various control points such as vibration, temperature, pressure, voltage, current measurement, etc. necessary to determine the degree of aging, performance, efficiency, etc. of the equipment in the building to overcome the second problem. The purpose of this study is to provide intelligent control information for optimal management and energy saving of office building equipment, which enables preventive maintenance or predictive maintenance in building facility management.

마지막으로, 본 발명은 상기 세 번째 문제점을 극복하기 위하여 건물자동화에 관한 통신방식의 국제적인 표준이며 우리나라의 케이에스 표준규격(KSC6909)인 백넷(BACnet: Building Automation & Control Network)을 통신 프로토콜로 채택하여 자동제어시스템을 구성하는 모든 제어기 및 현장기기들과 용이하게 연결하여 네크워크를 구성할 수 있고, 새로 개발되는 장치들의 추가적 설치를 저비용으로 용이하게 가능하도록 하는, 사무용 건물설비의 최적 관리 및 에너지 절감을 위한 지능형 제어정보기를 제공하는 것을 목적으로 한다.Finally, in order to overcome the third problem, the present invention is an international standard of communication method related to building automation and is adopted by adopting BACnet (BACnet: Building Automation & Control Network) as a communication protocol. For optimal management and energy saving of office building equipment, which can be easily connected with all controllers and field devices constituting the control system, and makes it possible to easily install additional newly developed devices at low cost. An object is to provide an intelligent control information.

상기 목적들을 달성하기 위하여, 본 발명에 의해 제공된 사무용 건물설비의 최적관리 및 에너지 절감을 위한 지능형 제어정보기는, 사무용 건물의 빌딩자동화시스템에 적용되는 백넷(BACnet) MS/TP 프로토콜에 의하여 외부제어기기와 통신가능한 MS/TP 프로토콜 모듈(90); 및 상기 빌딩자동화시스템을 구성하는 각 현장기기들로부터 입력된 전자적 신호 중 아날로그 신호를 디지털신호로 변환하고 현장기기에 대한 제어신호를 아날로그 신호로 변환하는 A/D 변환 및 D/A 변환부(870), 각각의 현장기기에 대응하는 다수의 제어루프들을 내장하여 제어 및 연산작용을 수행하는 제어연산부(810), 상기 제어정보기(80)의 운용프로그램 및 상기 제어연산부(810)의 작동에 필요한 정보를 저장하는 제1메모리(850), 상기 MS/TP 프로토콜 모듈(90)과의 데이터 송수신을 처리하는 제1 MS/TP 인터페이스(820), 백넷 규격에 정의된 표준 오브젝트와 서비스 기능을 제공하며 상기 제1 MS/TP 인터페이스(820)에 데이터를 송수신하고 백넷 프로토콜의 변환ㆍ해석을 담당하는 백넷 프로토콜 스택(830), 상기 백넷 프로토콜 스택(830)과 데이터를 주고받으며 이더넷(Ethernet) 통신망을 통해 상위 레벨의 관리장치 또는 서버들과 연계되는 이더넷 인터페이스(840), 및 상기 A/D 변환 및 D/A 변환부(870)와 상기 제어연산부(810) 사이에서 물리적인 입출력값을 소프트웨어적으로 처리가능하도록 변환하는 입출력 인터페이스(860)를 포함한 임베디드 제어기(800);를 구비하는 것을 특징으로 한다.In order to achieve the above objects, the intelligent control information for the optimal management and energy saving of the office building equipment provided by the present invention, the external control device by the BACnet MS / TP protocol applied to the building automation system of the office building MS / TP protocol module 90 in communication with; And an A / D conversion and D / A conversion unit for converting an analog signal from a digital signal input from each field device constituting the building automation system into a digital signal and converting a control signal for the field device into an analog signal 870. ), A control operation unit 810 for embedding a plurality of control loops corresponding to each field device to perform a control and arithmetic operation, the operation program of the control information device 80 and the operation of the control operation unit 810 A first memory 850 for storing information, a first MS / TP interface 820 for processing data transmission and reception with the MS / TP protocol module 90, and standard object and service functions defined in the BACnet standard; Send and receive data to and from the first MS / TP interface 820 and exchange data with the backnet protocol stack 830 and the backnet protocol stack 830. Ethernet interface 840 connected to a higher level management apparatus or servers through an Ethernet network, and physical input / output between the A / D conversion and D / A conversion unit 870 and the control operation unit 810. And an embedded controller 800 including an input / output interface 860 for converting the values to be software-processable.

본 발명에 따른 지능형 제어정보기는 사무용 건물에서의 건축설비 최적화와 에너지 절감을 달성하기 위한 것으로서, 특히 동력사용량이 많은 열원설비, 공조설비, 전기설비 등에 설치할 경우에는 기존의 제어정보기에서 관리하던 관제점에 추가하여 전력 사용량 및 각 현장기기와 센서류의 동작 상태를 감시하기 위한 상세 관제점을 증설한다. 또한, 하나의 빌딩 자동제어시스템에서 종래의 제어정보기와 본 발명에 따른 지능형 제어정보기를 섞어서 사용하는 것이 가능하므로, 종래의 제어정보기에서 제공하는 일반적인 관제점의 정보 수집 기능만으로도 충분한 곳에는 종래의 제어정보기를 그대로 사용함으로써 전체적인 빌딩 자동제어시스템의 설치비용을 절감할 수 있다.Intelligent control information according to the present invention is to achieve the optimization of building equipment and energy saving in the office building, especially when installed in heat source equipment, air conditioning equipment, electrical equipment with a large amount of power use control that was managed by the existing control information equipment In addition to these points, detailed control points for monitoring the power consumption and the operation status of each field equipment and sensors will be added. In addition, since it is possible to mix and use the conventional control information and the intelligent control information according to the present invention in one building automatic control system, the conventional information collection function provided by the conventional control information alone is sufficient where the conventional control information. By using the control information as it is, the installation cost of the overall building automatic control system can be reduced.

이하, 첨부한 도면들을 참고하여 본 발명에 따른 사무용 건물설비의 최적관리 및 에너지 절감을 위한 지능형 제어정보기를 상세히 설명한다.Hereinafter, with reference to the accompanying drawings will be described in detail the intelligent control information for the optimal management and energy saving of office building equipment according to the present invention.

도5는 본 발명에 따른 사무용 건물의 최적관리 및 에너지 절감을 위한 지능형 제어정보기(i-DDC: Intelligent Direct Digital Controller;80)의 구성을 나타낸 블록도이다. FIG. 5 is a block diagram illustrating a configuration of an intelligent direct digital controller (i-DDC) 80 for optimal management and energy saving of an office building according to the present invention.

도5에서, 종래의 제어정보기(41; 도1 참조)를 대체하여 공조기, 열원장치 등 각종 설비의 관제를 담당할 지능형 제어정보기(80)는 이더넷(Ethernet) 통신망을 통하여 중앙감시컴퓨터 또는 기타 상위레벨 서버와 연결된 상태에서 자립형(Stand Alone Type)으로 분산제어기능을 수행하는 임베디드 제어부(800), 및 MS/TP(Master-Slave/Token Passing) 통신망을 통하여 상기 임베디드 제어부(800)가 다른 제어정보기 또는 센서 등과 연결되도록 하는 MS/TP 프로토콜 모듈(90)로 구성된다.In FIG. 5, the intelligent control information 80 to control various equipments such as an air conditioner and a heat source device in place of the conventional control information device 41 (refer to FIG. 1) is provided with a central monitoring computer or an Ethernet communication network. The embedded control unit 800 performs a distributed control function in a standalone type in a state of being connected with other higher level servers, and the embedded control unit 800 is different through a master-slave / token passing network. It is composed of the MS / TP protocol module 90 to be connected to the control information sensor or sensor.

이때, 상기 임베디드 제어부(800)는 도1의 종래의 제어정보기에다 백넷 MS/TP 통신을 위한 기능을 추가한 것이고, 상기 MS/TP 프로토콜 모듈(90)은 백넷의 물리계층 및 데이터링크 계층에 관한 규약의 일종인 MS/TP 프로토콜에 따라 설계된 별개의 단위 장치로서 RS-485(또는 EIA-485) 직렬통신 방법에 의해 네트워크 구성요소간 통신을 담당한다.In this case, the embedded control unit 800 adds a function for BACnet MS / TP communication to the conventional control information of FIG. 1, and the MS / TP protocol module 90 is applied to the physical layer and the datalink layer of the BACnet. It is a separate unit designed according to the MS / TP protocol, which is a kind of protocol related to the communication between network components by RS-485 (or EIA-485) serial communication method.

상기 임베디드 제어부(800)는 센서, 밸브, 댐퍼 등 현장기기와의 입출력신호의 변환을 담당하는 A/D 변환 및 D/A 변환부(870), 각각의 현장기기에 대응하는 다수의 제어루프들을 내장하여 제어 및 연산작용을 수행하는 제어연산부(810), 상기 임베디드 제어부(800)의 운용 프로그램 및 기타 작동에 필요한 정보를 저장하는 제1메모리(850), 상기 MS/TP 프로토콜 모듈(90)과 데이터를 송수신하는 제1 MS/TP 인터페이스(820), 백넷의 표준 오브젝트와 서비스 기능을 제공하며 상기 제1 MS/TP 인터페이스(820)를 통해 데이터를 송수신하고 백넷 프로토콜에 따른 메시지의 변환, 해석을 담당하는 백넷 프로토콜 스택(830), 상기 백넷 프로토콜 스택(830)과 데이터를 주고받으며 이더넷(Ethernet) 통신망을 통해 상위 레벨의 관리장치 또는 서버들과 연계되는 이더넷 인터페이스(840), 제어정보기(80)의 동작상태를 표시하는 표시부(880), 사용자의 키 입력명령을 받는 키입력부(890), 및 상기 A/D 변환 및 D/A 변환부(870)와 상기 제어연산부(810) 사이에서 물리적인 입출력값을 소프트웨어적으로 처리가능하도록 변환하는 입출력 인터페이스(860)로 구성된다. The embedded control unit 800 is the A / D conversion and D / A conversion unit 870 responsible for the conversion of input and output signals with the field devices, such as sensors, valves, dampers, a plurality of control loops corresponding to each field device A control operation unit 810 embedded therein to perform control and arithmetic operations, a first memory 850 for storing an operation program of the embedded control unit 800 and other information required for operation, and the MS / TP protocol module 90; A first MS / TP interface 820 that transmits and receives data, provides standard objects and service functions of the backnet, and transmits and receives data through the first MS / TP interface 820 and converts and interprets a message according to a backnet protocol. An Ethernet interface 840, which is in charge of exchanging data with the BACnet protocol stack 830 and the BACnet protocol stack 830, is connected to higher-level management devices or servers through an Ethernet communication network. A display unit 880 for displaying the operation state of the information device 80, a key input unit 890 for receiving a user's key input command, and the A / D conversion and D / A conversion unit 870 and the control operation unit 810 ) Is configured as an input / output interface 860 for converting a physical input / output value to a software process.

그리고, 상기 MS/TP 프로토콜 모듈(90)은, 상기 제1 MS/TP 인터페이스(820)와 연결되어 백넷 메시지를 송수신하는 제2 MS/TP 인터페이스(91), MS/TP 통신망을 통하여 다른 제어정보기와의 물리적인 연결을 제공하는 EIA485 인터페이스(94), 상기 임베디드 제어부(800)로부터 전달된 백넷 메시지를 MS/TP 통신망을 통하여 다른 제어정보기 또는 현장기기로 전송하고 EIA485 인터페이스(94)를 통하여 수신한 메시지를 상기 임베디드 제어부(800)로 소정의 형식에 맞추어 전달하는 마이크로 프로세서(92), 및 상기 마이크로 프로세서(92)의 운용에 필요한 정보를 저장하는 제2메모리(93)로 구성된다. In addition, the MS / TP protocol module 90 is connected to the first MS / TP interface 820, and the second MS / TP interface 91 for transmitting and receiving a backnet message, and other control information through an MS / TP communication network. EIA485 interface 94, which provides a physical connection with a tile, and a backnet message transmitted from the embedded control unit 800 are transmitted to another control information device or field device through the MS / TP communication network and received through the EIA485 interface 94. A microprocessor 92 for transmitting a message to the embedded control unit 800 according to a predetermined format, and a second memory 93 for storing information necessary for the operation of the microprocessor 92.

이때, 상기 임베디드 제어부(800)와 상기 MS/TP 프로토콜 모듈(90)은 커넥터(미도시)로 연결되며, 커넥터는 MS/TP 모듈에 접근하기 위한 어드레스선과 데이터 교환을 위한 데이터선 및 이들을 제어하기 위한 콘트롤선으로 이루어진다. At this time, the embedded control unit 800 and the MS / TP protocol module 90 is connected by a connector (not shown), the connector is to control the address line and data lines for data exchange and access them to the MS / TP module It consists of a control line.

임베디드 제어부(800)의 기능은 건물설비의 작동에 관한 직접 제어 측면, 네트워크 구성 측면 및 설비의 예방보전적 감시 측면으로 나눌 수 있다. The functions of the embedded control unit 800 may be divided into a direct control aspect, a network configuration aspect, and a preventive maintenance monitoring aspect of the facility.

첫째, 상기 임베디드 제어부(800)의 건물 내 열원설비, 공조설비 등 현장기기에 대한 직접적인 관제기능은 종래의 제어정보기(DDC)의 고유 기능을 그대로 수용한다. 즉, 제로에너지 밴드 (Zero Energy Band) 설정 기능, 실내환경에 따라 급기팬과 댐퍼 및 밸브를 연동하는 기능, 냉난방밸브의 비례대를 설정하는 기능, 외기/환기 엔탈피를 계산하는 기능, 동·하절기 및 중간기의 설정조건 절환기능, 휴일 지정 기능, 예약 운전기능, 급기/환기온도 설정기능, 환기습도 설정기능 등의 제반 기능을 그대로 갖는다. First, the direct control function for a field device such as a heat source facility and an air conditioning facility in a building of the embedded control unit 800 accommodates a unique function of a conventional control information device (DDC). That is, zero energy band setting function, interlocking air supply fan, damper and valve according to indoor environment, setting proportional band of air-conditioning valve, calculating air / ventilation enthalpy, winter / summer season And all functions such as setting condition switching function, holiday designation function, reservation operation function, air supply / ventilation temperature setting function, and ventilation humidity setting function of the intermediate period.

상기 임베디드 제어부(800)는 제어연산부(810)에 미리 프로그램된 제어루틴에 따라 열원설비 및 공조설비를 제어하는 신호를 발생하는데, 건물의 에너지 낭비를 줄이고 재실자에게 쾌적한 환경을 조성하도록 하기 위해서는 건물내 입주자 환경과 근무형태 및 공조설비별 운전정보와 건물 내외의 각종 실시간 환경정보 등을 충분히 반영하도록 제어 알고리즘을 구성하여야 한다. 예를 들면, 건물내 각 실내공간이 필요 이상으로 과열, 과냉되지 않도록 비례제어방식을 적용하며, 건물내의 장시간 공실(空室)로 파악된 곳에 대해서는 냉난방기기의 작동을 멈추고 건물의 외주부에 위치한 부분은 외벽을 통한 외기와의 열교환을 고려하여 건물 중심부와는 냉난방의 정도를 차별화하는 등 건물내 각 실의 현황을 입력변수로서 처리하여야 한다.The embedded control unit 800 generates a signal for controlling the heat source equipment and the air conditioning equipment according to the control routine pre-programmed in the control operation unit 810, in order to reduce energy waste of the building and create a comfortable environment for the occupants. The control algorithm should be configured to sufficiently reflect the tenant's environment, work type, operation information for each air conditioning facility, and various real-time environmental information inside and outside the building. For example, the proportional control method is applied so that each indoor space in the building is not overheated or overcooled more than necessary, and the part located in the outer circumference of the building is stopped at the place where the air conditioner is identified as a long empty space in the building. Considering the heat exchange with the outside air through the outer wall, the current state of each room in the building should be treated as an input variable, such as differentiating the degree of cooling and heating from the center of the building.

이와 같이 건물내의 각 실의 상태를 실시간으로 파악하여 공조기기의 가동조건을 가변 설정하는 변풍량유닛 제어기(VAV-UC: Variable Air Volume Unit Controller) 및 밸브제어기(Valve Controller)에 관해서는 본 출원의 발명자가 앞서 발명하여 출원한 대한민국 특허출원 제2003-22567호 "최적제어에 의한 에너지 절약 및 유지관리가 용이한 한국형 가변풍량 제어시스템" 및 특허출원 제2003-45793호 "예측제어에 의한 주거용 건물의 에너지 절약형 실온제어시스템"에 소개된 바 있다. As described above, the variable air volume unit controller (VAV-UC) and the valve controller (Valve Controller) for variably setting the operating conditions of the air conditioning equipment by grasping the state of each room in the building in real time are described. Korean Patent Application No. 2003-22567 "Korean Variable Wind Volume Control System for Easy Energy Saving and Maintenance by Optimal Control" and Patent Application No. 2003-45793 "Preventive Control of Residential Buildings" Energy-saving room temperature control systems.

둘째, 상기 임베디드 제어부(800)는 범용성과 개방성을 갖춘 MS/TP 프로토콜 모듈(90)에 의하여 현장기기와 연결되므로, 장래의 새로 개발되는 현장기기들이 MS/TP 프로토콜을 채택하기만 하면 별다른 어려움 없이 시스템을 구성할 수 있다. Second, since the embedded control unit 800 is connected to the field device by the MS / TP protocol module 90 having universality and openness, as long as the newly developed field devices adopt the MS / TP protocol, there is no difficulty. You can configure the system.

도5에서, 상기 제1 MS/TP 인터페이스(820)는 상기 MS/TP 프로토콜 모듈(90)의 기능을 제어하고 그 동작에 필요한 파라미터를 설정하여 MS/TP 통신망을 통해 백넷 메시지를 송수신하며, 이더넷 인터페이스(840)는 임베디드 제어부(800)가 상위 레벨의 워크스테이션 또는 서버들과 연계되어 동작할 수 있도록 이더넷을 통한 백넷 서비스 기능을 제공한다. 그리고, 백넷 프로토콜 스택(830)은 백넷 규격에서 정의하고 있는 응용(Application)계층의 알고리즘과 표준 오브젝트(아날로그 입력, 아날로그 출력, 이진 입력, 이진 출력 오브젝트 등) 및 표준 서비스 기능을 제공하며, 제어연산부(810)는 백넷 프로토콜 스택(830)에서 제공하는 다양한 백넷 서비스 기능을 조합하여 제어기의 동작 알고리즘을 구성한다. 입출력 인터페이스(860)는 물리적인 입출력값을 소프트웨어적으로 처리가능하도록 변환하고, 이를 백넷 프로토콜 스택(830)에 존재하는 표준 오브젝트와 매핑시켜 준다.In FIG. 5, the first MS / TP interface 820 controls the function of the MS / TP protocol module 90 and sets parameters necessary for its operation to transmit and receive a backnet message through an MS / TP communication network, Ethernet The interface 840 provides a backnet service function through Ethernet so that the embedded control unit 800 may operate in connection with a higher level workstation or servers. In addition, the BACnet protocol stack 830 provides application layer algorithms and standard objects (analog input, analog output, binary input, binary output object, etc.) and standard service functions defined in the BACnet standard. 810 configures an operation algorithm of the controller by combining various backnet service functions provided by the backnet protocol stack 830. The input / output interface 860 converts the physical input / output values so that they can be processed by software and maps them to standard objects in the backnet protocol stack 830.

셋째, 상기 임베디드 제어부(800)는 종래의 제어정보기가 갖고 있는 온도, 습도, 풍량 등에 관한 관제점에 추가하여 관리대상장비의 전력 사용량, 진동, 발열, 소음 등 이상 증상에 관한 각종 정보를 수집하는 관제점들을 구비하여, 이러한 상세 관제점으로부터 수집된 정보를 분석하여 이상증상이 발견되면 경보를 발령하고, 수집된 모든 정보를 이더넷 통신망 및 MS/TP 통신망을 통해 최적관리시스템(OMS) 및 다른 제어정보기와 공유함으로써 예방보전 기능을 다할 수 있다. Third, the embedded control unit 800 collects various types of information on abnormal symptoms such as power consumption, vibration, heat generation, noise, etc. in addition to the control points related to temperature, humidity, and air volume of the conventional control information device. With points of analysis, it analyzes the information collected from these detailed points and issues an alarm when an abnormal symptom is found, and collects all the collected information through the Ethernet network and MS / TP network for optimal management system (OMS) and other control. Sharing with informers can help prevent preventive maintenance.

상기 제어연산부(810)에 프로그램된 예방보전적 기능은 고장진단, 고장처리 및 고장분석의 세 가지로 이루어진다. The preventive maintenance function programmed in the control operation unit 810 includes three types of failure diagnosis, failure processing, and failure analysis.

(1) 고장진단 기능은 운전 중에 관측자료를 이용하여 정상 여부를 파악하고, 제어정보기에서 제어신호를 출력한 후에 조작기의 동작상태를 피드백으로 입력받아 고장을 진단한다. 그리고, 기존 운전자의 감시와 조작만으로는 해결되지 않는 성능 저하, 고장 및 과부하가 발생한 경우 자동으로 고장으로 진단하고 경보 또는 이벤트 기록 조치한다. (1) Fault diagnosis function checks whether it is normal by using observation data during operation, and outputs control signal from control information device and diagnoses the fault by inputting operation status of manipulator as feedback. In addition, when performance degradation, failure, and overload occur that are not solved only by the existing driver's monitoring and operation, a failure is automatically diagnosed and an alarm or event recording action is performed.

(2) 고장처리 기능은 검출(Detection), 진단(Diagnosis), 평가(Evaluation), 결정(Decision)의 4단계에 의해 진행되는데, 검출된 이상증상이 허용범위 내이면 당분간 계속운전하고, 허용범위 초과시에는 고장 메시지를 출력한 후 원인과 위치를 파악하여 조치한다. 이때, 대상 장치의 에너지 사용량 적산치 및 발생된 고장이 시스템과 공정에 미치는 영향에 따라 조치 방법은 달라진다. (2) Fault handling function is progressed by 4 steps of Detection, Diagnosis, Evaluation, and Decision. If the detected abnormal symptom is within the allowable range, it continues to operate for a while. If it is exceeded, print out a fault message and determine the cause and location. In this case, the method of action varies depending on the integrated energy usage of the target device and the effect of the failure on the system and process.

(3) 고장분석 기능은 시스템의 실제 부하 예측이나 거주자의 환경요구 수준에 대한 정확한 예측에 의하여 제어 프로그램을 기본 설계한 후에 고장이 발견되면 그 원인에 따라 운전조건을 적절히 변경하고, 비효율적인 운전상태를 조기에 발견하여 고장가능성을 미리 예측하며, 자주 발생하거나 운전자에 의해 발견이 어려운 고장에 대해서는 자동고장검출이 가능하도록 관제점을 설정하는 것이다. (3) The failure analysis function is designed after the basic design of the control program based on the actual load prediction of the system or the accurate prediction of the environmental requirements of the occupants. If a failure is found, the operating conditions are changed according to the cause. Early detection of the failure, predicting the possibility of failure, and setting the control point to enable automatic failure detection for failures that occur frequently or are difficult to detect by the driver.

상술한 바와 같이, 본 발명에 따른 지능형 제어정보기는 백넷 MS/TP 프로토콜에 의하여 네트워크를 구성한 상태에서 현장기기에 대한 운전제어기능 및 시설관리 기능을 갖는 것을 특징으로 한다. 그리고, 본 발명의 지능형 제어정보기는 입출력 관제점을 범용성과 개방성을 갖춘 유니버설 포인트(Universal Point)로 설계함으로써 어느 한 설비의 특성에 구애받지 않고 건물내의 다양한 설비를 관제하는 데 적용될 수 있다. 즉, 동일한 하드웨어를 가진 지능형 제어정보기의 제어연산부(810)에다 제어대상설비의 특성에 맞는 응용프로그램(소프트웨어)을 로딩시키기만 하면 그 설비에 적용하기 위한 준비는 끝나는 것이다.As described above, the intelligent control information according to the present invention is characterized in that it has an operation control function and facility management function for the field equipment in the network configuration by the BACnet MS / TP protocol. In addition, the intelligent control information of the present invention can be applied to control a variety of facilities in a building regardless of the characteristics of any one by designing the input and output control point as a universal point (Universal Point) with versatility and openness. That is, simply loading an application program (software) suitable for the characteristics of the control target facility into the control operation unit 810 of the intelligent control information device having the same hardware is ready for application to the facility.

이와 같이 관제점을 유니버설 포인트로 설정함으로써 본 발명의 지능형 제어정보기는 거의 모든 건축설비들, 즉 열원설비(보일러, 냉동기, 냉각탑, 열교환기, 빙축열설비), 공기조화설비(공조기, 변풍량장치, 팬코일유닛, 컨벡터, 라디에이터, 패키지 에어콘), 환기설비(팬 류), 급배수 설비(펌프류, 수조의 수위), 급탕설비(밸브, 펌프류), 오수 정화 설비, 중수설비, 지역 난방 설비 등의 기계설비와 수변전 설비, 비상전원설비(발전기, 무정전전원장치, 축전지), 전력 간선 설비, 조명설비, 동력설비, 엘리베이터 등의 전기설비에 적용할 수 있다. Thus, by setting the control point to the universal point, the intelligent control information of the present invention is almost all building equipment, that is, heat source equipment (boiler, freezer, cooling tower, heat exchanger, ice heat storage equipment), air conditioning equipment (air conditioner, air flow rate device, Fan coil unit, convector, radiator, package air conditioner, ventilation equipment (fans), water supply and drainage equipment (pumps, water tanks), hot water supply equipment (valve, pumps), sewage purification equipment, heavy water equipment, district heating equipment, etc. It can be applied to electrical equipment such as mechanical equipment, water substation equipment, emergency power equipment (generator, uninterruptible power supply, battery), power trunk equipment, lighting equipment, power equipment, elevator, etc.

도6a는 본 발명에 따른 지능형 제어정보기를 건물의 기계설비의 관제에 사용할 경우 주요 관리 포인트를 정리한 표이고, 도6b는 건물의 전기설비의 관제에 사용할 경우 주요 관리 포인트를 정리한 표이다. 6A is a table summarizing the main management points when the intelligent control information according to the present invention is used for the control of the building equipment, and FIG. 6B is a table summarizing the main management points when controlling the electrical equipment of the building.

지금까지 국내외 건물에 사용되는 대부분의 제어정보기의 입출력 신호는 아날로그 입력(AI), 아날로그 출력(AO), 디지털 입력(DI) 및 디지털 출력(DO) 등 4가지 신호에 한정되며, 장치의 온/오프와 계측, 상태감시 위주로 되어 있다. Until now, the input and output signals of most control information devices used in buildings at home and abroad are limited to four signals: analog input (AI), analog output (AO), digital input (DI), and digital output (DO). It is mainly for on / off, measurement and status monitoring.

종래의 제어정보기와 본 발명에 따른 지능형 제어정보기의 관제점 및 기능상 차이점을 비교하면 다음과 같다. Comparing the control point and the functional difference between the conventional control information and the intelligent control information according to the present invention as follows.

(1) 아날로그 입력(AI)에 있어, 종래의 제어정보기는 외기온도, 급기온도, 환기온도 및 혼합기 온도와 외기습도, 급기습도, 환기습도만을 측정하였으나, 본 발명에 따른 제어정보기는 이에 추가하여 급기팬과 환기팬의 전력량까지 측정함으로써 과부하 등으로 인해 이상전류가 흐르는 경우를 진단할 수 있다.(1) In the analog input (AI), the conventional control information only measures the outside air temperature, the air supply temperature, the ventilation temperature and the mixer temperature, the outside air humidity, the air supply humidity, the ventilation humidity, the control information according to the present invention in addition to By measuring the power of the supply fan and the ventilation fan, it is possible to diagnose the case where abnormal current flows due to overload.

(2) 디지털 입력(DI)에 있어, 종래의 제어정보기는 급기팬, 환기팬의 공기흐름 상태감시와 필터 차압 및 연기 감지만이 가능하였으나, 본 발명에 따른 제어정보기는 주유시기 알림, 급배기팬 진동 경보, 표면온도 경보, 댐퍼모터 및 밸브모터의 이상감시, 벨트 장력 감시 등의 추가적인 기능을 갖는다.(2) In the digital input (DI), the control information according to the present invention can only monitor the air flow state of the air supply fan and the ventilation fan, and filter differential pressure and smoke detection. Additional features include fan vibration alarms, surface temperature alarms, abnormality monitoring of damper and valve motors, and belt tension monitoring.

(3) 아날로그 출력(AO)에 있어, 종래의 제어정보기는 댐퍼모터의 제어출력, 냉난방밸브 및 가습밸브의 제어출력과 인버터의 제어출력을 내며, 본 발명에 따른 제어정보기 역시 동일한 출력신호를 발생한다. (3) In the analog output AO, the conventional control information outputs the control output of the damper motor, the control output of the heating / cooling valve and the humidification valve and the control output of the inverter, and the control information according to the present invention also outputs the same output signal. Occurs.

(4) 디지털 출력(DO)에 있어, 종래의 제어정보기는 급기팬, 환기팬의 기동 및 정지신호만을 출력하였으나, 본 발명에 따른 지능형 제어정보기는 이에 추가하여 급기팬, 환기팬의 기동횟수를 적산하고, 동작시간을 합산하여 출력하는 기능을 더 발휘한다. (4) In the digital output (DO), the conventional control information outputs only start and stop signals of the supply fan and the ventilation fan, but the intelligent control information according to the present invention adds the number of starts of the supply fan and the ventilation fan. This function further integrates and outputs the sum of the operating times.

도7은 도5의 지능형 제어정보기(80)가 공조설비의 관제에 적용될 경우 제어연산부(810)에서 수행되는 시설관리 및 운전제어에 관한 알고리즘의 일 예를 도시한 것이다. FIG. 7 illustrates an example of an algorithm for facility management and operation control performed by the control operation unit 810 when the intelligent control information device 80 of FIG. 5 is applied to the control of the air conditioning facility.

도7에서, 사용자의 키입력이나 중앙감시 시스템의 작동제어신호 또는 미리 예약된 설정에 의해 공조설비가 작동할 경우에는, 제1메모리(850)에 저장된 설정값(기준온도, 기준습도, 기준풍량)과 누적적산량 및 가동횟수값이 제어연산부(810)로 로드되고(S1 단계), 설비에 대한 기동신호(DO)가 출력된다(S2 단계). 이어서, 지능형 제어정보기(80)에 연결된 관제점들을 통해 디지털 입력신호(급기, 환기상태, 팬 소음, 발열, 진동) 및 아날로그 입력신호(급기팬, 환기팬의 전력 사용량, 압력, 풍량)가 수신되며(S3 단계), 카운터(미도시)에 의해 급기팬 및 환기팬의 총 사용시간이 적산된다. 이때, 디지털 입력신호가 정상값과 다를 경우 이상경보를 발령하고(S4 및 S5 단계), 작동중지 상황인지 여부를 판단하여(검출된 이상증상이 허용범위 내인지 여부를 판단) 작동을 중단해야 할 상황이면 고장 메시지 및 정지신호를 출력한 후 종료하고, 계속 운전할 수 있는 상황이면 적절한 조치를 병행하면서 계속 진행한다(S6 및 S11 단계). 그리고, 상기 아날로그 입력신호를 설정값과 비교하여 허용범위를 벗어난 경우에는 오차를 줄이는 방향으로 제어신호를 발생하고(S7 및 S8 단계), 전력 사용량 및 총 사용시간 등 아날로그 데이터를 누적 적산하여 업데이트한 후 저장한다(S9 및 S10 단계). 이후에는 작동중지신호가 입력되지 않으면 상기 S3 단계 내지 S9 단계를 반복 시행한다. In FIG. 7, when the air conditioning equipment is operated by a user's key input, an operation control signal of the central monitoring system, or a predetermined setting, the set values (reference temperature, reference humidity, reference wind amount) stored in the first memory 850 ), The cumulative accumulation amount and the number of operation times are loaded into the control operation unit 810 (step S1), and a start signal DO for the facility is output (step S2). Subsequently, digital input signals (air supply, ventilation status, fan noise, heat generation, vibration) and analog input signals (air supply fan, ventilation fan power consumption, pressure, air volume) are connected through control points connected to the intelligent control information device 80. It is received (step S3), the total use time of the air supply fan and the ventilation fan by the counter (not shown) is integrated. At this time, if the digital input signal is different from the normal value, an abnormal alarm is issued (steps S4 and S5), and it is determined whether or not the operation is stopped (determining whether or not the detected abnormal symptom is within the allowable range). If it is a situation, the system outputs a failure message and a stop signal, and then terminates. If it is possible to continue operation, it proceeds in parallel with appropriate measures (steps S6 and S11). When the analog input signal is out of an allowable range by comparing with the set value, a control signal is generated in a direction of reducing an error (steps S7 and S8), and the accumulated and updated analog data such as power consumption and total usage time is updated. Then store (steps S9 and S10). After that, if the operation stop signal is not input, steps S3 to S9 are repeated.

도8은 본 발명에 따른 지능형 제어정보기(i-DDC;81)를 건물의 공조설비의 제어에 적용하였을 경우 각 관제점과 지능형 제어정보기(81)의 입출력 신호관계를 나타낸 개념도이다.8 is a conceptual diagram illustrating input and output signal relationships between control points and the intelligent control information device 81 when the intelligent control information device (i-DDC) 81 according to the present invention is applied to the control of an air conditioning facility of a building.

도8의 공조설비는 건물내로 연결되는 덕트(110)상에 급기팬(111), 환기팬(112), 냉난방밸브(113), 가습밸브(114), 온도센서(115,117,119,121), 습도센서(116,118,120), 연감지센서(122), 필터(123) 및 댐퍼모터(124,125,126)가 설치되어 있다. The air conditioner of FIG. 8 includes an air supply fan 111, a ventilation fan 112, a cooling / heating valve 113, a humidification valve 114, a temperature sensor 115, 117, 119, 121, and a humidity sensor 116, 118, 120 on a duct 110 connected to a building. ), A year sensor 122, a filter 123 and damper motors (124, 125, 126) are provided.

도8의 모든 현장기기들에는 관제점이 설정되어 지능형 제어정보기(81)로 연결되는데, 지능형 제어정보기(81)는 급기팬(111) 및 환기팬(112)과 아날로그 입력신호(사용전력량, 압력, 풍량), 아날로그 출력신호(인버터 제어출력), 디지털 입력신호(급기, 환기상태, 총 사용시간, 팬 소음, 발열, 진동) 및 디지털 출력신호(기동, 정지신호)를 주고 받는다(①,② 참조). Control points are set in all the field devices of FIG. 8 and connected to the intelligent control information device 81. The intelligent control information device 81 includes an air supply fan 111 and a ventilation fan 112 and an analog input signal (amount of power used, Pressure, air volume), analog output signal (inverter control output), digital input signal (air supply, ventilation status, total operating time, fan noise, heat generation, vibration) and digital output signal (start, stop signal) ②).

그리고, 지능형 제어정보기(81)는 냉난방밸브(113) 및 가습밸브(114)와 아날로그 입력신호(개도 입력), 디지털 입력신호(누수 감시) 및 아날로그 출력신호(제어출력)를 주고 받으며(③,④ 참조), 온도센서(115,117,119,121) 및 습도센서(116,118,120)로부터는 아날로그 입력신호(온도측정치 및 습도측정치)를 받고(⑤,⑦,⑨,⑪ 및 ⑥,⑧,⑩ 참조), 연감지센서(122) 및 필터(123)로부터는 디지털 입력신호(경보감시)를 받는다(⑫,⑬ 참조). 또한, 지능형 제어정보기(81)는 댐퍼모터들(124,125,126)에 아날로그 출력신호(제어출력신호)를 보낸다(⑭,⑮,16참조). In addition, the intelligent control information 81 exchanges and receives an air conditioning valve 113 and a humidification valve 114 with an analog input signal (opening input), a digital input signal (leakage monitoring) and an analog output signal (control output) (③ , ④), temperature sensor (115, 117, 119, 121) and humidity sensor (116, 118, 120) receive analog input signals (temperature measurement and humidity measurement) (see ⑤, ⑦, ⑨, ⑪ and ⑥, ⑧,)), soft sensor The digital input signal (alarm monitoring) is received from the reference numeral 122 and the filter 123 (see i). In addition, the intelligent control information 81 sends an analog output signal (control output signal) to the damper motors 124, 125 and 126 (see ⑭, ⑮, 16).

도9는 본 발명에 따른 지능형 제어정보기(82)를 냉난방 순환펌프 및 급 배수 순환펌프의 제어에 적용하였을 경우 각 관제점과 지능형 제어정보기(82)의 입출력 신호 관계를 나타낸 개념도이다. 9 is a conceptual diagram showing the relationship between the control points and the input and output signals of the intelligent control information 82 when the intelligent control information 82 according to the present invention is applied to the control of the cooling and heating circulation pump and the supply and discharge circulation pump.

도9에서, 급수 라인은 수도인입관(202), 저수탱크(201), 양수기(203), 밸브(204), 급수펌프(205) 및 급수관들로 구성되며, 배수 라인은 배수관들, 배수탱크(211), 배수펌프(215) 및 하수관(212)으로 구성되고, 냉난방수 라인은 보일러(221), 난방수 순환펌프(225), 냉동기(231) 및 냉방수 순환펌프(235)로 구성된다. In Fig. 9, the water supply line is composed of a water inlet pipe 202, a water storage tank 201, a water pump 203, a valve 204, a water supply pump 205 and a water supply pipe, and the drain line is a drain pipe, a drain tank. 211, the drain pump 215 and the sewage pipe 212, the cooling and heating line is composed of a boiler 221, a heating water circulation pump 225, a refrigerator 231, and a cooling water circulation pump 235. .

도9에 도시된 모든 순환펌프들에는 관제점이 설정되어 상기 지능형 제어정보기(82)와 연결된다. 지능형 제어정보기(82)는 급수펌프(205), 배수펌프(215), 냉방수 순환펌프(235) 및 난방수 순환펌프(225)와 연결되어 아날로그 입력신호(펌프 사용 전력량) 및 디지털 입력신호(펌프 동작상태, 펌프 총 가동시간 및 이상경보)를 받고, 디지털 출력신호(기동신호 및 정지신호)를 내보낸다(①,②,③,④,⑤ 참조). Control points are set in all circulation pumps shown in FIG. 9 and are connected to the intelligent control information machine 82. The intelligent control information machine 82 is connected to the water supply pump 205, the drain pump 215, the cooling water circulation pump 235, and the heating water circulation pump 225 so that the analog input signal (power amount of the pump used) and the digital input signal are provided. (Receive pump operation status, total pump running time and alarm) and send out digital output signal (start signal and stop signal) (see ①, ②, ③, ④, ⑤).

도10은 본 발명에 따른 지능형 제어정보기(83)를 급탕제어에 적용하였을 경우 각 관제점과 지능형 제어정보기(83)의 입출력 신호관계를 나타낸 개념도로서, 급탕설비는 급수탱크(301), 저탕조(302), 순환펌프(303), 온도센서(304,306), 밸브(305), 보일러(307)로 구성된다. 10 is a conceptual diagram illustrating input and output signal relationships between control points and the intelligent control information device 83 when the intelligent control information device 83 according to the present invention is applied to the hot water supply control. It is composed of a storage tank 302, a circulation pump 303, temperature sensors 304 and 306, a valve 305, a boiler 307.

지능형 제어정보기(83)는 상기 순환펌프(303)와 연결되어 아날로그 입력신호(사용 전력량) 및 디지털 입력신호(상태감시, 펌프소음, 발열, 진동 감시)를 받으며 디지털 출력신호(기동신호 및 정지신호)를 내보내고(① 참조), 상기 온도센서들(304,306)로부터는 아날로그 입력신호(온도 측정치)를 받는다(②,③ 참조). 그리고, 지능형 제어정보기(83)는 상기 밸브(305)와 아날로그 입력신호(개도입력), 디지털 입력신호(누수감시) 및 아날로그 출력신호(제어출력)를 주고 받으며(④ 참조), 상기 보일러(307)와는 디지털 입력신호(상태감시 및 이상경보)를 받는다(⑤ 참조).The intelligent control information device 83 is connected to the circulation pump 303 to receive analog input signals (power consumption) and digital input signals (status monitoring, pump noise, heat generation, vibration monitoring) and digital output signals (starting signals and stops). Signal) (see ①) and receive analog input signals (temperature measurements) from the temperature sensors 304 and 306 (see ② and ③). The intelligent control information device 83 exchanges the valve 305 with the analog input signal (opening input), the digital input signal (leak monitoring) and the analog output signal (control output) (see ④), and the boiler ( 307 receives a digital input signal (status monitoring and alarm) (see ⑤).

도11은 본 발명에 따른 지능형 제어정보기(84)를 팬코일 유닛(Fan Coil Unit)의 제어에 적용하였을 경우 각 관제점과 지능형 제어정보기(84)의 입출력 신호관계를 나타낸 개념도로서, 건물내 사무용 공간의 내부에 설치된 팬 코일 유닛(56)은 케이스 내에 냉수관 및 온수관과 연결된 냉온수코일(56a), 결로되는 물을 처리하기 위한 드레인 팬(56b), 송풍팬(56c), 상기 송풍팬(56c)을 구동하기 위한 모터(56d) 및 오염물질을 거르기 위한 필터(56f)로 구성된다. 11 is a conceptual diagram showing the relationship between each control point and the input / output signal of the intelligent control information device 84 when the intelligent control information device 84 according to the present invention is applied to the control of a fan coil unit. The fan coil unit 56 installed inside the office space includes a cold / hot water coil 56a connected to a cold water pipe and a hot water pipe in the case, a drain pan 56b for treating condensed water, a blowing fan 56c, and the blowing air. Motor 56d for driving fan 56c and filter 56f for filtering contaminants.

지능형 제어정보기(84)는 상기 모터(56d)와 아날로그 입력신호(사용전력량), 디지털 입력신호(모터 소음, 발열, 진동 감시) 및 디지털 출력신호(기동신호 및 정지신호)를 주고 받으며(① 참조), 상기 밸브(56e)와는 아날로그 입력신호(개도입력), 디지털 입력신호(누수감시) 및 아날로그 출력신호(제어출력)를 주고 받는다(② 참조).The intelligent control information device 84 exchanges the motor 56d with an analog input signal (power consumption), a digital input signal (motor noise, heat generation, vibration monitoring) and a digital output signal (starting signal and stop signal) (① And an analog input signal (opening input), a digital input signal (leakage monitoring), and an analog output signal (control output) with the valve 56e (see ②).

본 발명의 지능형 제어정보기를 이용하여 빌딩의 최적관리 시스템을 구성하면, 기존의 기계설비 및 전력감시 관리포인트들은 맨 머신 인터페이스(MMI)에 의해서 운용관리 되지만, 최적관리 시스템은 건물내 모든 동력을 사용하는 전동기류와 조명기구 등의 전력 사용량, 이상경보를 비롯한 보수유지 관리와 운영관리를 위해 필요한 상세 관리 포인트들을 지능형 제어정보기를 통해 전송받아 감시제어 그래픽으로 표시하고 상세 관리 포인트들의 입출력값을 분석, 저장, 기록하여 에너지 절감 및 최적시설관리에 활용할 수 있다. If the optimal management system of the building is configured using the intelligent control information of the present invention, the existing mechanical equipment and power monitoring management points are managed by the man machine interface (MMI), but the optimal management system uses all the power in the building. Detailed control points necessary for maintenance maintenance and operation management, including power consumption of electric motors and lighting fixtures, abnormal alarms, etc., are transmitted through intelligent control information, and displayed as a monitoring control graphic, and the input / output values of the detailed management points are analyzed, It can be stored and recorded for energy saving and optimal facility management.

또한, 본 발명에 의한 지능형 제어정보기는 기존의 제어정보기 보다 많은 상세 관제점을 포함하므로 동력 사용량이 많은 중앙기계실 또는 공조실에 설치하고, 일반적인 관리 포인트만 있는 기계실과 공조실에는 일반 제어정보기를 사용함으로써 설치비용을 절감할 수 있다. 그리고, 본 발명에 의한 지능형 제어정보기는 중앙감시 시스템과는 총괄적인 관리기능만을 공유할 뿐이고 담당하는 현장기기에 관해서는 독자적인 제어기능을 발휘하므로(Stand Alone 타입) 비록 중앙감시 시스템과의 통신이 끊긴 경우에도 공조, 발전, 급배수 등 각종 설비가 원활하게 작동할 수 있다. In addition, since the intelligent control information device according to the present invention includes more detailed control points than the existing control information device, the intelligent control information device is installed in a central machine room or an air conditioning room with high power consumption, and by using a general control information device in a machine room and an air conditioning room having only a general management point. Installation cost can be reduced. In addition, the intelligent control information according to the present invention only shares the overall management function with the central monitoring system and exhibits a unique control function for the field equipment in charge (Stand Alone type). In this case, various facilities such as air conditioning, power generation and water supply and drainage can operate smoothly.

본 발명에 따른 지능형 제어정보기는 기존의 제어정보기 보다 많은 상세 관리 포인트들을 수용하여 건물내 설비별 운전정보와 건물 내외의 각종 실시간 환경정보를 계측할 수 있으므로, 건물내 각 실에 대한 재실자의 환경 요구 수준을 예측하여 설비의 정격특성에 맞는 최적 운전을 수행함으로써 보다 쾌적한 실내환경을 조성하고 에너지 절감을 이룰 수 있는 장점이 있다. The intelligent control information device according to the present invention accommodates more detailed management points than existing control information devices and can measure operation information for each facility in the building and various real-time environment information inside and outside the building, so that the environment of the occupants for each room in the building is By predicting the required level and performing the optimum operation according to the rated characteristics of the facility, there is an advantage that can create a more comfortable indoor environment and achieve energy savings.

또한, 본 발명에 따른 지능형 제어정보기는 건물내 설비의 노후화 정도, 성능, 효율 등을 판정하는 데 필요한 진동, 온도, 압력, 전압, 전류계측 등의 다양한 관제점의 입력신호를 받아들여 분석함으로써 건물 설비 관리에 있어 예방보전 또는 예지보전을 가능하게 하여 건물설비의 유지 보수에 드는 인력 및 비용을 절약하고 최적관리 시스템의 안정성 및 신뢰성을 제고할 수 있는 장점이 있다. In addition, the intelligent control information according to the present invention receives and analyzes the input signals of various control points such as vibration, temperature, pressure, voltage, current measurement, etc. necessary to determine the degree of aging, performance, efficiency, etc. of the equipment in the building Preventive maintenance or predictive maintenance is possible in facility management, which saves manpower and cost for maintenance of building facilities, and improves the stability and reliability of the optimal management system.

마지막으로, 본 발명에 따른 지능형 제어정보기는 백넷(BACnet)을 통신 프로토콜로 채택함으로써 빌딩 자동제어시스템 내의 모든 제어기 및 현장기기들과 용이하게 연결하여 정보의 공유 및 활용도를 높이고, 장래 새로 개발되는 장치들을 시스템에 추가할 때에 설치가 용이하며 비용을 절감할 수 있는 장점이 있다. Lastly, the intelligent control information device according to the present invention adopts BACnet as a communication protocol to easily connect with all controllers and field devices in the automatic building control system to increase information sharing and utilization, and to be newly developed in the future. Adding them to the system has the advantage of ease of installation and cost savings.

도1은 사무용 건물에 적용되는 통합 빌딩자동제어시스템의 개략적인 전체 구성도이다. 1 is a schematic overall configuration diagram of an integrated building automatic control system applied to an office building.

도2는 도1의 빌딩자동제어시스템 중 공조설비 제어 시스템의 구성도이고, 도3은 조명 제어 시스템의 구성도이며, 도4는 전력 감시 시스템의 구성도이다. FIG. 2 is a block diagram of an air conditioning facility control system of the building automatic control system of FIG. 1, FIG. 3 is a block diagram of a lighting control system, and FIG. 4 is a block diagram of a power monitoring system.

도5는 본 발명에 따른 사무용 건물의 최적관리 및 에너지 절감을 위한 지능형 제어정보기(i-DDC: Intelligent Direct Digital Controller;80)의 구성을 나타낸 블록도이다. FIG. 5 is a block diagram illustrating a configuration of an intelligent direct digital controller (i-DDC) 80 for optimal management and energy saving of an office building according to the present invention.

도6a는 본 발명에 따른 지능형 제어정보기가 건물의 기계설비의 관제에 적용될 경우 주요 관리 포인트를 정리한 표이며, 도6b는 건물의 전기설비의 관제에 적용될 경우 주요 관리 포인트를 정리한 표이다.Figure 6a is a table summarizing the main management points when the intelligent control information according to the present invention is applied to the control of the mechanical equipment of the building, Figure 6b is a table summarizing the main management points when applied to the control of the electrical equipment of the building.

도7은 도5의 지능형 제어정보기(80)의 제어연산부(810)에서 수행되는 최적제어 알고리즘의 흐름도이다.7 is a flowchart of an optimal control algorithm performed by the control operation unit 810 of the intelligent control information controller 80 of FIG.

도8은 본 발명에 따른 지능형 제어정보기(i-DDC;81)를 건물의 공조설비의 제어에 적용하였을 경우 각 관제점과 지능형 제어정보기(81)의 입출력 신호 관계를 나타낸 개념도이다. 8 is a conceptual diagram showing the relationship between input and output signals of each control point and the intelligent control information 81 when the intelligent control information (i-DDC) 81 according to the present invention is applied to the control of the building air conditioning equipment.

도9은 본 발명에 따른 지능형 제어정보기(82)를 냉난방 순환펌프 및 급 배수 순환펌프의 제어에 적용하였을 경우 각 관제점과 지능형 제어정보기(82)의 입출력 신호 관계를 나타낸 개념도이다. 9 is a conceptual diagram showing the relationship between the control points and the input and output signals of the intelligent control information 82 when the intelligent control information 82 according to the present invention is applied to the control of the cooling and heating circulation pump and the supply and discharge circulation pump.

도10는 본 발명에 따른 지능형 제어정보기(83)를 급탕제어에 적용하였을 경우각 관제점과 지능형 제어정보기(83)의 입출력 신호관계를 나타낸 개념도이다. Fig. 10 is a conceptual diagram showing the input / output signal relationship between each control point and the intelligent control information device 83 when the intelligent control information device 83 according to the present invention is applied to the hot water supply control.

도11은 본 발명에 따른 지능형 제어정보기(84)를 팬코일 유닛(Fan Coil Unit)의 제어에 적용하였을 경우 각 관제점과 지능형 제어정보기(84)의 입출력 신호관계를 나타낸 개념도이다. FIG. 11 is a conceptual diagram illustrating input and output signal relationships between control points and the intelligent control information device 84 when the intelligent control information device 84 according to the present invention is applied to the control of a fan coil unit.

*도면 중 주요부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

10: 이더넷 스위치 허브 20: 중앙감시 시스템10: Ethernet Switch Hub 20: Central Monitoring System

21: 주 BA 서버 22: 백업 BA 서버21: Primary BA Server 22: Backup BA Server

40,50: 공조설비제어용 노드 41,51,: 제어정보기40,50: Nodes 41,51, for controlling air conditioning equipment

52: 공조기 53: 존 제어정보기(Zone DDC) 52: air conditioner 53: zone control information (Zone DDC)

54: 실내온도조절기 55: 가변풍량유닛(VAV Unit) 54: room temperature controller 55: variable air volume unit (VAV Unit)

56: 팬코일유닛(FCU) 60: 조명설비제어용 노드 56: fan coil unit (FCU) 60: lighting equipment control node

61: 마스터콘트롤 유닛 62: 조명제어패널(LCP) 61: master control unit 62: lighting control panel (LCP)

73: 게이트웨이 74: 지맥(GIMAC, 전자화배전반기기)73: gateway 74: vein (GIMAC)

80: 지능형 정보제어기(i-DDC) 90: MS/TP 프로토콜 모듈80: intelligent information controller (i-DDC) 90: MS / TP protocol module

91: 제2 MS/TP 인터페이스 92: 마이크로프로세서91: second MS / TP interface 92: microprocessor

93: 제2메모리 94: EIA485 인터페이스93: second memory 94: EIA485 interface

111: 급기팬 112: 환기팬111: air supply fan 112: ventilation fan

113: 냉난방밸브 114: 가습밸브113: air conditioning valve 114: humidification valve

115,117,119,121: 온도센서 116,118,120: 습도센서115,117,119,121: Temperature sensor 116,118,120: Humidity sensor

122: 연감지센서 123: 필터122: year sensor 123: filter

124,125,126: 댐퍼모터 800: 임베디드 제어부124, 125, 126: damper motor 800: embedded control unit

810: 제어연산부 820: 제1 MS/TP 인터페이스810: control unit 820: first MS / TP interface

830: BACnet 프로토콜 스택 840: 이더넷 인터페이스830: BACnet Protocol Stack 840: Ethernet Interface

850: 제1 메모리 860: 입출력 인터페이스850: First memory 860: I / O interface

870: A/D변환 및 D/A 변환기 880: 표시부870: A / D conversion and D / A converter 880: display unit

890: 키패드890: keypad

Claims (7)

사무용 건물의 빌딩자동화시스템에 적용되는 백넷(BACnet) MS/TP 프로토콜에 의하여 외부제어기기와 통신가능한 MS/TP 프로토콜 모듈(90); 및 An MS / TP protocol module 90 capable of communicating with an external control device by means of a BACnet MS / TP protocol applied to a building automation system of an office building; And 상기 빌딩자동화시스템을 구성하는 각 현장기기들로부터 입력된 전자적 신호 중 아날로그 신호를 디지털신호로 변환하고 현장기기에 대한 제어신호를 아날로그 신호로 변환하는 A/D 변환 및 D/A 변환부(870), 각각의 현장기기에 대응하는 다수의 제어루프들을 내장하여 제어 및 연산작용을 수행하는 제어연산부(810), 상기 제어정보기(80)의 운용프로그램 및 상기 제어연산부(810)의 작동에 필요한 정보를 저장하는 제1메모리(850), 상기 MS/TP 프로토콜 모듈(90)과의 데이터 송수신을 처리하는 제1 MS/TP 인터페이스(820), 백넷 규격에 정의된 표준 오브젝트와 서비스 기능을 제공하며 상기 제1 MS/TP 인터페이스(820)에 데이터를 송수신하고 백넷 프로토콜의 변환ㆍ해석을 담당하는 백넷 프로토콜 스택(830), 상기 백넷 프로토콜 스택(830)과 데이터를 주고받으며 이더넷(Ethernet) 통신망을 통해 상위 레벨의 관리장치 또는 서버들과 연계되는 이더넷 인터페이스(840), 및 상기 A/D 변환 및 D/A 변환부(870)와 상기 제어연산부(810) 사이에서 물리적인 입출력값을 소프트웨어적으로 처리가능하도록 변환하는 입출력 인터페이스(860)를 포함한 임베디드 제어기(800);를 구비하는 것을 특징으로 하는, 사무용 건물설비의 최적관리 및 에너지 절감을 위한 지능형 제어정보기.A / D conversion and D / A conversion unit 870 for converting the analog signal of the electronic signal input from each field device constituting the building automation system into a digital signal and the control signal for the field device to an analog signal A control operation unit 810 for embedding a plurality of control loops corresponding to each field device to perform control and arithmetic operations, an operation program of the control information device 80, and information necessary for the operation of the control operation unit 810. A first memory 850 for storing data, a first MS / TP interface 820 for processing data transmission and reception with the MS / TP protocol module 90, a standard object and a service function defined in a backnet standard, and The BACnet protocol stack 830 that transmits and receives data to and from the first MS / TP interface 820 and converts and analyzes the BACnet protocol, exchanges data with the BACnet protocol stack 830, and performs Ethernet (Et Ethernet interface 840 associated with a higher level management apparatus or servers through a communication network, and a physical input / output value between the A / D conversion and D / A conversion unit 870 and the control operation unit 810. And an embedded controller (800) including an input / output interface (860) for converting the data into a software process. The intelligent control information device for optimal management and energy saving of office building equipment. 제1항에 있어서, 상기 MS/TP 프로토콜 모듈(90)은, 상기 제1 MS/TP 인터페이스(820)와 연결되어 백넷 메시지를 송수신하는 제2 MS/TP 인터페이스(91); MS/TP 통신망을 통하여 다른 제어정보기와의 물리적인 연결을 제공하는 EIA485 인터페이스(94); 상기 임베디드 제어부(800)로부터 전달된 백넷 메시지를 MS/TP 통신망을 통하여 다른 제어정보기 또는 현장기기로 전송하고, 상기 EIA485 인터페이스(94)를 통하여 수신한 메시지를 상기 임베디드 제어부(800)로 소정의 형식에 맞추어 전달하는 마이크로 프로세서(92); 및 상기 마이크로 프로세서(92)의 운용에 필요한 정보를 저장하는 제2메모리(93);를 구비한 것을 특징으로 하는, 사무용 건물설비의 최적관리 및 에너지 절감을 위한 지능형 제어정보기.2. The MS / TP protocol module of claim 1, further comprising: a second MS / TP interface (91) connected to the first MS / TP interface (820) to transmit and receive a backnet message; An EIA485 interface 94 for providing a physical connection with another control information via an MS / TP communication network; The backnet message transmitted from the embedded control unit 800 is transmitted to another control information device or a field device through an MS / TP communication network, and a message received through the EIA485 interface 94 is predetermined to the embedded control unit 800. A microprocessor 92 for delivery in conformity with the form; And a second memory (93) for storing information necessary for the operation of the microprocessor (92). Intelligent control information for optimal management and energy saving of office building equipment. 제1항에 있어서, 상기 임베디드 제어기(800)는, 현재의 동작상태를 표시하는 표시부(880) 및 사용자로부터 키 명령을 입력받는 키입력부(890)를 더 구비한 것을 특징으로 하는, 사무용 건물설비의 최적관리 및 에너지 절감을 위한 지능형 제어정보기. The office building facility according to claim 1, wherein the embedded controller 800 further comprises a display unit 880 for displaying a current operation state and a key input unit 890 for receiving a key command from a user. Intelligent control information device for optimal management and energy saving. 제1항에 있어서, 상기 현장기기는 급기팬(111), 환기팬(112), 냉난방 밸브(113), 가습밸브(114), 댐퍼모터(124,125,126), 필터(123), 온도센서(115,117,119,121), 습도센서(116,118,120) 및 연감지센서(122)로 구성된 공조기이며, 상기 제어연산부(810)는 상기 급기팬(111) 및 환기팬(112)의 작동상태 및 사용전력량에 관한 입력값을 이용하여 사용전력량, 기동횟수 및 사용시간을 적산하고, 상기 온도센서(115,117,119,121) 및 습도센서(116,118,120)로부터 수신된 온도값 및 습도값과 상기 냉난방밸브(113) 및 가습밸브(114)의 개도(開度)를 고려한 현재의 공조상태가 미리 설정된 기준치와 소정의 허용 범위 내에 속하는 경우 상기 급기팬(111) 및 환기팬(112)의 정지신호를 출력하고 상기 냉난방밸브(113) 및 가습밸브(114)의 개도를 감소하는 제어신호를 출력하며, 그 외의 경우에는 상기 급기팬(111) 및 환기팬(112)의 작동신호를 출력함과 함께 상기 냉난방밸브(113)의 개도를 증대하는 제어신호를 출력하며, 소음, 발열, 진동 및 연감지에 관한 센서 입력이 정상 기준치와 다를 경우 이상경보를 발령하는 것을 특징으로 하는 사무용 건물설비의 최적관리 및 에너지 절감을 위한 지능형 제어정보기.According to claim 1, wherein the field device is an air supply fan 111, a ventilation fan 112, air conditioning valve 113, humidification valve 114, damper motors (124, 125, 126), filter 123, temperature sensors (115, 117, 119, 121) , An air conditioner composed of humidity sensors 116, 118, 120, and a soft sensor 122, and the control operation unit 810 uses input values related to the operating state and the amount of power used of the air supply fan 111 and the ventilation fan 112. Integrating the amount of power used, the number of times and the use time, the temperature and humidity values received from the temperature sensor (115, 117, 119, 121) and the humidity sensor (116, 118, 120) and the opening degree of the heating and cooling valve 113 and humidification valve 114 When the current air conditioner considering the ()) falls within a predetermined reference value and a predetermined allowable range, the stop signal of the air supply fan 111 and the ventilation fan 112 is output, and the air conditioning valve 113 and the humidification valve 114 of the Outputs a control signal to reduce the opening degree, in other cases the air supply fan 111 ) And a control signal for increasing the opening degree of the air-conditioning valve 113 while outputting an operation signal of the ventilation fan 112, and when a sensor input related to noise, heat generation, vibration, and soft-feel is different from the normal reference value. Intelligent control information for optimal management and energy saving of office building equipment, characterized in that the alarm is issued. 제1항에 있어서, 상기 현장기기는 냉난방순환펌프(225,235) 및/또는 급배수 펌프(205,215)이며, 상기 제어연산부(810)는 상기 펌프들(205,215,225,235)의 동작상태 및 사용전력량에 관한 입력값을 이용하여 사용전력량 및 가동시간을 적산하고, 기동 및 정지신호를 출력하며, 소음, 발열 및 진동에 관한 센서 입력이 정상 기준치와 다를 경우 이상경보를 발령하는 것을 특징으로 하는 사무용 건물설비의 최적관리 및 에너지 절감을 위한 지능형 제어정보기.According to claim 1, wherein the field equipment is a heating and cooling circulation pump (225, 235) and / or drainage pump (205, 215), the control operation unit 810 is an input value for the operating state and the amount of power of the pump (205, 215, 225, 235) Optimizing management of office building equipments by integrating power consumption and operating time, outputting start and stop signals, and issuing abnormal alarms when sensor inputs related to noise, heat and vibration are different from normal standard values. And intelligent control information for energy saving. 제1항에 있어서, 상기 현장기기는 순환펌프(303), 밸브(305) 및 온도센서(306)로 구성된 열교환기이며, 상기 제어연산부(810)는 상기 순환펌프(303)의 동작상태 및 사용전력량에 관한 입력값을 이용하여 사용전력량 및 가동시간을 적산하고, 상기 온도센서(306)로부터 수신된 온도값 및 상기 밸브(305)의 개도를 고려한 현재의 열적 상태가 미리 설정된 기준치와 소정의 허용범위 내에 속하는 경우 상기 순환펌프(303)의 정지신호를 출력하고 현재의 열적 상태를 유지하는 방향으로 상기 밸브(305)의 개도를 조절하며, 그 외의 경우에는 상기 순환펌프(303)의 작동신호를 출력함과 함께 상기 기준치와의 차이를 좁히는 방향으로 상기 밸브(305)의 개도를 조절하고, 상기 순환펌프(303)의 소음, 발열 및 진동에 관한 센서 입력이 정상 기준치와 다를 경우 이상경보를 발령하는 것을 특징으로 하는 사무용 건물설비의 최적관리 및 에너지 절감을 위한 지능형 제어정보기.According to claim 1, wherein the field device is a heat exchanger consisting of the circulation pump 303, the valve 305 and the temperature sensor 306, the control operation unit 810 is the operating state and use of the circulation pump 303 Integrating the amount of power used and the operating time using the input value for the amount of power, the current thermal state in consideration of the temperature value received from the temperature sensor 306 and the opening degree of the valve 305 is a predetermined reference value and a predetermined allowance If it is within the range outputs the stop signal of the circulation pump 303 and adjusts the opening degree of the valve 305 in the direction to maintain the current thermal state, otherwise the operation signal of the circulation pump 303 Outputs the valve 305 in the direction of narrowing the difference with the reference value and outputs an alarm if the sensor input of the noise, heat and vibration of the circulation pump 303 is different from the normal reference value. Ha Intelligent control information group for the optimal management characteristics and energy savings of the equipment to the office building. 제1항에 있어서, 상기 현장기기는 팬 모터(56d) 및 밸브(56e)로 구성된 팬코일유닛(Fan Coil Unit, 56)이며, 상기 제어연산부(810)는 상기 팬 모터(56d)의 동작상태 및 사용전력량에 관한 입력값을 이용하여 사용전력량 및 가동시간을 적산하고, 기동 및 정지신호를 출력하며, 상기 밸브(56e)의 개도를 조절하고, 상기 밸브(56e)의 누수여부 및 상기 팬 모터(56d)의 소음, 발열 및 진동에 관한 센서 입력이 정상 기준치와 다를 경우 이상경보를 발령하는 것을 특징으로 하는 특징으로 하는 사무용 건물설비의 최적관리 및 에너지 절감을 위한 지능형 제어정보기.According to claim 1, wherein the field device is a fan coil unit (Fan Coil Unit) 56 consisting of a fan motor 56d and a valve (56e), the control operation unit 810 is an operating state of the fan motor 56d And using the input value of the amount of power used, integrating the amount of power used and operating time, outputting start and stop signals, adjusting the opening degree of the valve 56e, leaking of the valve 56e, and the fan motor. Intelligent control information for optimal management and energy saving of the office building equipment, characterized in that it issues an alarm if the sensor input on the noise, heat and vibration of the 56d is different from the normal reference value.
KR1020040009241A 2004-02-12 2004-02-12 Intelligent direct digital controller for business building facilities to perform optimal and energy-saving management KR100557672B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040009241A KR100557672B1 (en) 2004-02-12 2004-02-12 Intelligent direct digital controller for business building facilities to perform optimal and energy-saving management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040009241A KR100557672B1 (en) 2004-02-12 2004-02-12 Intelligent direct digital controller for business building facilities to perform optimal and energy-saving management

Publications (2)

Publication Number Publication Date
KR20050081019A true KR20050081019A (en) 2005-08-18
KR100557672B1 KR100557672B1 (en) 2006-03-06

Family

ID=37267722

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040009241A KR100557672B1 (en) 2004-02-12 2004-02-12 Intelligent direct digital controller for business building facilities to perform optimal and energy-saving management

Country Status (1)

Country Link
KR (1) KR100557672B1 (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100766294B1 (en) * 2005-11-17 2007-10-11 주식회사 태멘시스템 Automatic gas ventilation apparatus and method thereof
KR100799976B1 (en) * 2007-10-18 2008-02-01 주식회사 대산시스템 Management system of direct digital controller and the method for managing thereof
KR100894506B1 (en) * 2007-06-28 2009-04-22 한양대학교 산학협력단 Monitoring system for communication network having a plurality of layers
KR20110128171A (en) * 2009-02-13 2011-11-28 가부시끼가이샤 이앤드이 플래닝 Energy management support device, energy management support system, energy management support method, and program
KR101238779B1 (en) * 2012-06-12 2013-03-04 한경기전 주식회사 Building management control system which uses stand-alone direct digital controller with analog integration and driving time integration and method of direct digital controller
KR101374044B1 (en) * 2012-06-05 2014-03-12 (주)코젠 Integrated Monitoring and Control System
KR101596004B1 (en) 2014-10-31 2016-02-24 서강대학교산학협력단 System and method of managing facilities of Intelligent Building
KR101700381B1 (en) * 2016-06-27 2017-01-31 이에스콘트롤스(주) Radio Automatic Control Apparatus and Method using Wi-Fi
CN106776224A (en) * 2016-12-26 2017-05-31 东南大学 The power consumption calculating system and method for a kind of Android phone nextport hardware component NextPort based on CPU controls
CN106765893A (en) * 2016-11-30 2017-05-31 郑州云海信息技术有限公司 The control system and method for data center's air-conditioning system
KR20200060135A (en) 2018-11-22 2020-05-29 주식회사 시너젠 Docker based building energy control point manageemnt
KR102258487B1 (en) 2021-01-07 2021-05-31 주식회사 네오비젼 Building energy management system and method for providing dynamic user interface using artificial intelligence
KR102270348B1 (en) 2021-01-07 2021-06-29 주식회사 네오비젼 Building energy management method and system using artificial intelligence using the number of residents for cost reduction
KR20210143645A (en) * 2020-05-20 2021-11-29 오토시맨틱스 주식회사 Method and Apparatus for Managing Building Energy Based on Deep Learning
US11221601B1 (en) 2021-05-24 2022-01-11 Zurn Industries, Llc Various IoT sensory products and cloud-purge for commercial building solutions utilizing LoRa to BACnet conversion for efficient data management and monitoring
US11316908B1 (en) * 2021-02-01 2022-04-26 Zurn Industries, Llc BACnet conversion of water management data for building management solutions
US11573539B1 (en) 2021-09-03 2023-02-07 Zurn Industries, Llc Managing edge devices in building management systems
KR20230053161A (en) 2021-10-14 2023-04-21 (주)코젠 AI-based accident prevention and energy-saving smart building automatic control operation system
KR102594744B1 (en) 2023-04-12 2023-10-30 주식회사 네오비젼 Multiple building control method and system using digital twin

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101460759B1 (en) * 2013-12-30 2014-11-13 주식회사 신영정보기술 Integrated Automatic Control System For Leak Detection And Energy-saving
KR101673576B1 (en) 2015-12-07 2016-11-08 (주)가교테크 Smart building control system and method thereof
KR102097789B1 (en) 2019-01-07 2020-04-06 성진계장 주식회사 Terminal for remote managing in building facility

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100766294B1 (en) * 2005-11-17 2007-10-11 주식회사 태멘시스템 Automatic gas ventilation apparatus and method thereof
KR100894506B1 (en) * 2007-06-28 2009-04-22 한양대학교 산학협력단 Monitoring system for communication network having a plurality of layers
KR100799976B1 (en) * 2007-10-18 2008-02-01 주식회사 대산시스템 Management system of direct digital controller and the method for managing thereof
KR20110128171A (en) * 2009-02-13 2011-11-28 가부시끼가이샤 이앤드이 플래닝 Energy management support device, energy management support system, energy management support method, and program
KR101374044B1 (en) * 2012-06-05 2014-03-12 (주)코젠 Integrated Monitoring and Control System
KR101238779B1 (en) * 2012-06-12 2013-03-04 한경기전 주식회사 Building management control system which uses stand-alone direct digital controller with analog integration and driving time integration and method of direct digital controller
KR101596004B1 (en) 2014-10-31 2016-02-24 서강대학교산학협력단 System and method of managing facilities of Intelligent Building
KR101700381B1 (en) * 2016-06-27 2017-01-31 이에스콘트롤스(주) Radio Automatic Control Apparatus and Method using Wi-Fi
CN106765893A (en) * 2016-11-30 2017-05-31 郑州云海信息技术有限公司 The control system and method for data center's air-conditioning system
CN106776224B (en) * 2016-12-26 2019-12-24 东南大学 System and method for measuring and calculating power consumption of Android mobile phone hardware component based on CPU control
CN106776224A (en) * 2016-12-26 2017-05-31 东南大学 The power consumption calculating system and method for a kind of Android phone nextport hardware component NextPort based on CPU controls
KR20200060135A (en) 2018-11-22 2020-05-29 주식회사 시너젠 Docker based building energy control point manageemnt
KR20210143645A (en) * 2020-05-20 2021-11-29 오토시맨틱스 주식회사 Method and Apparatus for Managing Building Energy Based on Deep Learning
KR102258487B1 (en) 2021-01-07 2021-05-31 주식회사 네오비젼 Building energy management system and method for providing dynamic user interface using artificial intelligence
KR102270348B1 (en) 2021-01-07 2021-06-29 주식회사 네오비젼 Building energy management method and system using artificial intelligence using the number of residents for cost reduction
US11316908B1 (en) * 2021-02-01 2022-04-26 Zurn Industries, Llc BACnet conversion of water management data for building management solutions
US11805155B2 (en) 2021-02-01 2023-10-31 Zurn Industries, Llc BACnet conversion of water management data for building management solutions
US11221601B1 (en) 2021-05-24 2022-01-11 Zurn Industries, Llc Various IoT sensory products and cloud-purge for commercial building solutions utilizing LoRa to BACnet conversion for efficient data management and monitoring
US11768473B2 (en) 2021-05-24 2023-09-26 Zurn Industries, Llc IoT network with BACnet communication for various sensors in a building management system (BMS) platform
US11573539B1 (en) 2021-09-03 2023-02-07 Zurn Industries, Llc Managing edge devices in building management systems
US11803166B2 (en) 2021-09-03 2023-10-31 Zurn Industries, Llc Systems and methods for determining operations of a smart fixture
KR20230053161A (en) 2021-10-14 2023-04-21 (주)코젠 AI-based accident prevention and energy-saving smart building automatic control operation system
KR102594744B1 (en) 2023-04-12 2023-10-30 주식회사 네오비젼 Multiple building control method and system using digital twin

Also Published As

Publication number Publication date
KR100557672B1 (en) 2006-03-06

Similar Documents

Publication Publication Date Title
KR100557672B1 (en) Intelligent direct digital controller for business building facilities to perform optimal and energy-saving management
KR102364621B1 (en) Air-conditioner System and Method thereof
US20230116964A1 (en) Systems and methods for controlling variable refrigerant flow systems and equipment using artificial intelligence models
EP1804007B1 (en) Air conditioner integrated management system and control method of the same
JP4518208B2 (en) Remote management system and remote management method for air conditioner
CN112327730A (en) System, method and device for monitoring and managing building energy consumption
EP2366956B1 (en) Air conditioning system and method of controlling the same
CN107676923A (en) A kind of Air conditioning System for Hospitals cooling tower failure automatic judging method and device
CN112805529A (en) Automatic maintenance and flow control for heat exchangers
KR20130049254A (en) The intelligent building integrated automatic control and energy goal management system based on 3-dimensional modeling and the method thereof
CN110715814B (en) Online comprehensive diagnosis system and method for open cooling tower
CN108268019A (en) Building automatic control system based on P-BUS buses
CN115790233A (en) Feed forward flow control for heat transfer systems
CN102305455B (en) Intelligent through-flow air-interchange ventilation control system and control device and method thereof
CN110285541A (en) Multi-split air conditioner leakage position automatic positioning method, device and equipment
JP2004169989A (en) Abnormality diagnosis system
EP3765797A1 (en) Condensation reduction in water heaters
Seem et al. On-line monitoring and fault detection
KR100742528B1 (en) Remote control system for chiller and cooling tower device
JP2009002650A (en) Abnormality diagnosis system
KR20150110876A (en) System and method for remote integrated management in HVAC equipment
WO2004079615A1 (en) Maintenance information providing system
CN114893886B (en) Integrated energy-saving control system and control method for centralized heating ventilation air conditioner
CN104896689A (en) Intelligent central-air conditioning system of hotel
CN112801610A (en) Full life cycle management system and method for electromechanical equipment

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20090225

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20120224

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20150213

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20180105

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20191223

Year of fee payment: 16