[go: nahoru, domu]

US20080071588A1 - Method of and system for analyzing, modeling and valuing elements of a business enterprise - Google Patents

Method of and system for analyzing, modeling and valuing elements of a business enterprise Download PDF

Info

Publication number
US20080071588A1
US20080071588A1 US09/938,874 US93887401A US2008071588A1 US 20080071588 A1 US20080071588 A1 US 20080071588A1 US 93887401 A US93887401 A US 93887401A US 2008071588 A1 US2008071588 A1 US 2008071588A1
Authority
US
United States
Prior art keywords
value
systems
data
block
elements
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US09/938,874
Inventor
Jeff S. Eder
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Eder Jeffrey
Asset Trust Inc
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US09/938,874 priority Critical patent/US20080071588A1/en
Priority to US10/282,113 priority patent/US20050119922A1/en
Priority to US10/283,083 priority patent/US7580848B2/en
Priority to US10/298,021 priority patent/US7693733B2/en
Assigned to ASSET TRUST, INC. reassignment ASSET TRUST, INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: EDER, JEFF
Publication of US20080071588A1 publication Critical patent/US20080071588A1/en
Assigned to ASSET RELIANCE, INC. reassignment ASSET RELIANCE, INC. NUNC PRO TUNC ASSIGNMENT (SEE DOCUMENT FOR DETAILS). Assignors: EDER, JEFF
Assigned to EDER, JEFFREY reassignment EDER, JEFFREY ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: ASSET RELIANCE INC
Abandoned legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • G06Q10/06375Prediction of business process outcome or impact based on a proposed change
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0201Market modelling; Market analysis; Collecting market data
    • G06Q30/0202Market predictions or forecasting for commercial activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/02Banking, e.g. interest calculation or account maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/12Accounting

Definitions

  • This invention relates to a method of and system for business valuation, more particularly, to an automated system that analyzes elements of a business to identify their value drivers, models the value creation impact of the elements and computes a valuation of each of the elements on a specified date.
  • the valuation of a business is a complex and time-consuming undertaking.
  • Business valuations determine the price that a hypothetical buyer would pay for a business under a given set of circumstances.
  • the volume of business valuations being performed each year is increasing significantly.
  • a leading cause of this growth in volume is the increasing use of mergers and acquisitions as vehicles for corporate growth.
  • Business valuations are frequently used in setting the price for a business that is being bought or sold.
  • Another reason for the growth in the volume of business valuations has been their increasing use in areas other than supporting merger and acquisition transactions. For example, business valuations are now being used by financial institutions to determine the amount of credit that should be extended to a company, by courts in determining litigation settlement amounts and by investors in evaluating the performance of company management.
  • a business valuation is completed by an appraiser or a Certified Public Accountant (hereinafter, appraiser) using a combination of judgment, experience and an understanding of generally accepted valuation principles.
  • appraiser a Certified Public Accountant
  • the two primary types of business valuations that are widely used and accepted are income valuations and asset valuations.
  • Market valuations are also used in some cases but their use is restricted because of the difficulty inherent in trying to compare two different companies.
  • Income valuations are based on the premise that the current value of a business is a function of the future value that an investor can expect to receive from purchasing all or part of the business.
  • Income valuations are the most widely used type of valuation. They are generally used for valuing businesses that are expected to continue operating for the foreseeable future. In these valuations the expected returns from investing in the business and the risks associated with receiving the expected returns are evaluated by the appraiser. The appraiser then determines the value whereby a hypothetical buyer would receive a sufficient return on the investment to compensate the buyer for the risk associated with receiving the expected returns.
  • Income valuation methods include the capitalization of earnings method, the discounted future income method, the discounted cash flow method, the economic income method and other formula methods.
  • Asset valuations consider the business to be a collection of assets which have an intrinsic value to a third party in an asset sale. Asset valuations are typically used for businesses that are ceasing operation and for specific type of businesses such as holding companies and investment companies. Asset valuation methods include the book value method, the adjusted book value method, the economic balance sheet method and the liquidation method.
  • Market valuations are used to place a value on one business by using valuations that have been established for comparable businesses in either a public stock market or a recent transaction. This method is difficult to use properly because no two companies are exactly the same and no two transactions are completed for the exact same reasons.
  • Market valuation methods include the price to earnings method, the comparable sales method, industry valuation methods and the comparable investment method.
  • the appraiser When performing a business valuation, the appraiser is generally free to select the valuation type and method (or some combination of the methods) in determining the business value. Under the current procedures, there is no correct answer, there is only the best possible informed guess for any given business valuation. There are several difficulties inherent in this approach. First, the reliance on informed guessing places a heavy reliance on the knowledge and experience of the appraiser. The recent increase in the need for business valuations has strained the capacity of existing appraisal organizations. As a result, the average experience level of those performing the valuations has decreased. The situation is even worse for many segments of the American economy where experienced appraisers don't exist because the industries are too new.
  • a preferable object to which the present invention is applied is the valuation of elements of a high technology commercial enterprise where a significant portion of the business value is associated with intangible assets.
  • the present invention eliminates a great deal of time-consuming and expensive effort by automating the extraction of transaction data from the databases, tables, and files of the existing computer-based corporate finance, operation, sales, and human resource software databases as required to operate the system.
  • the automated extraction, aggregation and analysis of transaction data from a variety of existing computer-based systems significantly increases the scale and scope of the analysis that can be completed.
  • the system of the present invention further enhances the efficiency and effectiveness of the business valuation by automating the retrieval, storage and analysis of information useful for valuing intangible assets from external databases and publications via the internet or other external networks.
  • the value of an enterprise operation is calculated by summing items from Table 1 as shown in Table 2.
  • option pricing algorithms are improvements over traditional methods as they correct two inaccurate assumptions implicit in traditional discounted cash flow analyses of business growth opportunities, namely: the assumption that investment decisions are reversible, and the assumption that investment decisions can not be delayed.
  • a firm with a project that requires an investment has the right but not the obligation to buy an asset at some future time of its choosing.
  • option valuation algorithms explicitly recognize that investments of this type are often irreversible and that they can be delayed, the asset values calculated using these algorithms are more accurate than valuations created using more traditional approaches.
  • growth options gives the present invention a distinct advantage over traditional approaches to business valuation.
  • the innovative system has the added benefit of providing a large amount of detailed information concerning both tangible and intangible elements of enterprise business value.
  • the system also gives the user the ability to track the changes in elements of business value and total business value over time by comparing the current valuation to previously calculated valuations.
  • the system also provides the user with an alternative mechanism for tracking financial performance.
  • the system of the present invention produces reports in formats that are similar to the reports provided by traditional accounting systems.
  • the method for tracking the elements of value for a business enterprise provided by the present invention eliminates many of the limitations associated with current accounting systems that were described previously.
  • FIG. 1 is a block diagram showing the major processing steps of the present invention
  • FIG. 2 is a diagram showing the files or tables in the application database of the present invention that are utilized for data storage and retrieval during the processing that values elements of the enterprise;
  • FIG. 3 is a block diagram of an implementation of the present invention.
  • FIG. 4 is a diagram showing the data windows that are used for receiving information from and transmitting information to the user during system processing
  • FIG. 5A and FIG. 5B are block diagrams showing the sequence of steps in the present invention used for extracting, aggregating and storing information utilized in system processing from: user input, the basic financial system database, the operation management system database, the advanced financial system database, the sales management system database, external databases via the internet and the human resource information system database;
  • FIG. 6A , FIG. 6B , FIG. 6C , FIG. 6D and FIG. 6E are block diagrams showing the sequence of steps in the present invention that are utilized in identifying the value drivers and defining the composite variables;
  • FIG. 7 is a block diagram showing the sequence of steps in the present invention used for the specification and valuation of growth options
  • FIG. 8 is a block diagram showing the sequence of steps associated with the analyzing the components of enterprise value
  • FIG. 9A and FIG. 9B are block diagrams showing the sequence of steps in the present invention that are utilized in the specification and optimization of the predictive models that determine the relationships between value drivers and the revenue, expense and capital components of enterprise value;
  • FIG. 10 is a diagram illustrating the processing of a feed-forward neural network
  • FIG. 11 is a diagram illustrating the processing of a Kohonen neural network
  • FIG. 12 is a block diagram showing the sequence of the steps in the present invention used for calculating the percentage of the revenue, expense and capital components attributed to the elements and sub-elements of value;
  • FIG. 13 is a block diagram showing the sequence of steps in the present invention used in preparing, displaying and optionally printing reports;
  • FIG. 14 is a sample Value MapTM report from the present invention showing the calculated value for all elements of value in the total company on the valuation date;
  • FIG. 15 is a sample Value Creation report from the present invention detailing the changes in the elements of value and total company value from a prior date to the valuation date.
  • FIG. 1 provides an overview of the processing completed by the innovative system for business valuation.
  • an automated method of and system ( 100 ) for business valuation is provided. Processing starts in this system ( 100 ) with a block of software ( 200 ) that extracts, aggregates and stores the transaction data and user input required for completing a valuation.
  • This information is extracted via an interconnection network ( 25 ) from a basic financial system database ( 10 ), an operation management system database ( 15 ), an advanced financial system database ( 30 ), a sales management system database ( 35 ), and a human resource information system database ( 40 ).
  • Information can also be extracted from an on-line external database such as those found on an internet ( 5 ) via a communications link ( 45 ).
  • the application database ( 50 ) contains tables for storing user input, extracted information and system calculations including a system settings table ( 140 ), a revenue data table ( 141 ), an expense data table ( 142 ), a capital data table ( 143 ), an equity data table ( 144 ), a physical asset ID table ( 145 ), an asset liquidation price table ( 146 ), an account number structure table ( 147 ), an equity forecast table ( 148 ), a data dictionary table ( 149 ), a revenue component definition table ( 150 ), an expense component definition table ( 151 ), a capital component definition table ( 152 ), an element of value definition table ( 153 ), a sub-element definition table ( 154 ), an enterprise definition table ( 155 ), a composite variable table ( 156 ), a sub-element weights table ( 157 ), a revenue model
  • the application database ( 50 ) can optionally exist as a datamart, data warehouse or departmental warehouse.
  • the system of the present invention has the ability to accept and store supplemental or primary data directly from user input, a data warehouse or other electronic files in addition to receiving data from the databases described previously.
  • the system of the present invention also has the ability to complete the necessary calculations without receiving data from one or more of the specified databases. However, in the preferred embodiment all required information is obtained from the specified databases ( 5 , 10 , 15 , 30 , 35 & 40 ).
  • the preferred embodiment of the present invention is a computer system ( 100 ) illustratively comprised of a client personal computer ( 110 ) connected to an application server personal computer ( 120 ) via an interconnection network ( 25 ).
  • the application server personal computer ( 120 ) is in turn connected via the interconnection network ( 25 ) to a database-server personal computer ( 130 ).
  • the database-server personal computer ( 130 ) has a CPU ( 136 ), a keyboard ( 132 ), a CRT display ( 133 ), a printer ( 137 ), a hard drive ( 131 ) for storage of the basic financial system database ( 10 ), the operation management system database ( 15 ), the advanced financial system database ( 30 ), the sales management system database ( 35 ) and the human resource information system database ( 40 ), a communications bus ( 134 ) and a read/write random access memory ( 135 ).
  • the application-server personal computer ( 120 ) has a CPU ( 127 ), a keyboard ( 123 ), a mouse ( 126 ), a CRT display ( 124 ), a printer ( 128 ), a hard drive ( 122 ) for storage of the application database ( 50 ) and the majority of the application software ( 200 , 300 , 400 , 500 , 600 , 700 and 800 ) of the present invention, a communications bus ( 125 ) and a read/write random access memory ( 121 ). While only one client personal computer is shown in FIG. 3 , it is to be understood that the application-server personal computer ( 120 ) can be networked to fifty or more client personal computers ( 110 ) via the interconnection network ( 25 ).
  • the application-server personal computer ( 120 ) can also be networked to fifty or more server, personal computers ( 130 ) via the interconnection network ( 25 ). It is to be understood that the diagram of FIG. 3 is merely illustrative of one embodiment of the present invention.
  • the client personal computer ( 110 ) has a CPU ( 117 ), a keyboard ( 113 ), a mouse ( 116 ), a CRT display ( 114 ), a printer ( 118 ), a modem ( 119 ), a hard drive ( 112 ) for storage of a client data-base ( 49 ) and the user-interface portion of the application software ( 900 ), a communications bus ( 115 ) and a read/write random access memory ( 111 ).
  • the application software controls the performance of the central processing unit ( 127 ) as it completes the calculations required to calculate the detailed business valuation.
  • the application software program ( 200 , 300 , 400 , 500 , 600 , 700 , 800 and 900 ) is written in a combination of PowerScript, C++ and Visual Basic®.
  • the application software ( 200 , 300 , 400 , 500 , 600 , 700 , 800 and 900 ) also uses Structured Query Language (SQL) for extracting data from other databases ( 10 , 15 , 30 , 35 and 40 ) and then storing the data in the application database ( 50 ) or for receiving input from the user ( 20 ) and storing it in the client database ( 49 ).
  • the other databases contain information regarding historical financial performance ( 10 ), operation management records ( 15 ), forecast financial performance ( 30 ), sales prospects and transactions ( 35 ) and the company employees ( 40 ) that are used in the operation of the system ( 100 ).
  • the user ( 20 ) provides the information the application software requires to determine which data need to be extracted and transferred from the database-server hard drive ( 131 ) via the interconnection network ( 25 ) to the application-server computer hard drive ( 122 ) by interacting with user-interface portion of the application software ( 900 ).
  • the extracted information is combined with input received from the keyboard ( 113 ) or mouse ( 116 ) in response to prompts from the user-interface portion of the application software ( 900 ) before processing is completed.
  • User input is initially saved to the client database ( 49 ) before being transmitted to the communication bus ( 125 ) and on to the hard drive ( 122 ) of the application-server computer via the interconnection network ( 25 ).
  • the central processing unit ( 127 ) accesses the extracted data and user input by retrieving it from the hard drive ( 122 ) using the random access memory ( 121 ) as computation workspace in a manner that is well known.
  • the computers ( 110 , 120 and 130 ) shown in FIG. 3 illustratively are IBM PCs or clones or any of the more powerful computers or workstations that are widely available.
  • Typical memory configurations for client personal computers ( 110 ) used with the present invention should include at least 32 megabytes of semiconductor random access memory ( 111 ) and at least a 2 gigabyte hard drive ( 112 ).
  • Typical memory configurations for the application-server personal computer ( 120 ) used with the present invention should include at least 64 megabytes of semiconductor random access memory ( 121 ) and at least a 50 gigabyte hard drive ( 122 ).
  • Typical memory configurations for the database-server personal computer ( 130 ) used with the present invention should include at least 128 megabytes of semiconductor random access memory ( 135 ) and at least a 200 gigabyte hard drive ( 131 ).
  • the value of the enterprise will be further broken down into tangible and intangible elements of value.
  • the value of the current-operation will be calculated using an income valuation model.
  • An integral part of most income valuation models is the calculation of the present value of the expected cash flows, income or profits associated with the current-operation.
  • the present value of a stream of cash flows is calculated by discounting the cash flows at a rate that reflects the risk associated with realizing the cash flow. For example, the present value (PV) of a cash flow of ten dollars ($10) per year for five (5) years would vary depending on the rate used for discounting future cash flows as shown below.
  • the first step in evaluating the elements of current-operation value is separating the underlying formula that defines the value of the current-operation as shown in Table 3.
  • the three components of current-operation value will be referred to as the revenue value (R), the expense value (E) and the capital value (C).
  • R revenue value
  • E expense value
  • C capital value
  • Table 3 shows that there are three ways to increase the value of the current-operation—increase the revenue, decrease the expense or decrease the capital requirements (note: this statement ignores a fourth way to increase value—decrease interest rate used for discounting future cash flows).
  • the preferred embodiment has a pre-determined number of sub-components for each component of value.
  • the revenue value is not subdivided.
  • the expense value is subdivided into five sub-components: the cost of raw materials, the cost of manufacture or delivery of service, the cost of selling, the cost of support and the cost of administration.
  • the capital value is subdivided into six sub-components: cash, non-cash financial assets, production equipment, other assets (non financial, non production assets), financial liabilities and equity.
  • the production equipment and equity sub-components are not used directly in evaluating the elements of value.
  • the components and sub-components of current-operation value will be used in calculating the value of the tangible and intangible elements of value.
  • an element of value will be defined as “an identifiable entity or group that as a result of past transactions has provided and is expected to provide economic benefit to the enterprise.”
  • An item will be defined as a single member of the group that defines an element of value. For example, an individual salesman would be an “item” in the “element of value” sales staff.
  • Predictive models are used to determine the percentage of: the revenue value, the expense value sub-components, and the capital value sub-components that are attributable to each element of value. The resulting values will then be added together to determine the valuation for different elements as shown by the example in Table 4.
  • the valuation of an enterprise using the approach outlined above is completed in seven distinct stages.
  • the first stage of processing (block 200 from FIG. 1 ) extracts, aggregates and stores the data from user input, existing internal databases ( 10 , 15 , 30 , 35 or 40 ) and external databases ( 5 ) required for the calculation of enterprise business value as shown in FIG. 5A and FIG. 5B .
  • the second stage of processing (block 300 from FIG. 1 ) identifies the item variables and item performance indicators that drive the components of value (revenue, expense and changes in capital) and calculates composite variables that characterize the performance of the elements of value, as shown in FIG. 6A FIG. 6B , FIG. 6C , FIG. 6D , FIG. 6E , FIG. 10 and FIG. 11 .
  • the third stage of system processing (block 400 from FIG. 1 ) values the growth options by enterprise using option pricing algorithms as shown in FIG. 7 .
  • the fourth stage of system processing (block 500 from FIG. 1 ) values the revenue, expense and capital components and calculates the current operation value using the information prepared in the previous stage of processing as shown in FIG. 8 .
  • the fifth stage of system processing (block 600 from FIG. 1 ) specifies and optimizes predictive models to determine the relationship between the value drivers and the revenue, expense and capital values as shown in FIG. 9A , FIG. 9B and FIG. 10 .
  • the sixth stage of processing (block 700 from FIG. 1 ) combines the results of the fourth and fifth stages of processing to determine the value of each element as shown in FIG. 12 .
  • the seventh and final stage of processing (block 800 from FIG. 1 ) determines the relationship between equity and calculated total value as shown in FIG. 13 and displays the results of the prior calculations in specified formats as shown in FIG. 14 and FIG. 15 .
  • FIG. 5A and FIG. 5B detail the processing that is completed by the portion of the application software ( 200 ) that extracts, aggregates and stores the information required for system operation from: the basic financial system database ( 10 ), operation management system database ( 15 ), advanced financial system database ( 30 ), sales management system database ( 35 ), human resource information system database ( 40 ), external databases found on the internet ( 5 ) and the user ( 20 ).
  • the basic financial system database 10
  • operation management system database 15
  • advanced financial system database 30
  • sales management system database 35
  • human resource information system database 40
  • external databases found on the internet ( 5 ) and the user 20 .
  • Advanced financial systems utilize information from the basic financial systems to perform financial analysis, financial planning and financial reporting functions.
  • Virtually every commercial enterprise uses some type of basic financial system as they are required to use these systems to maintain books and records for income tax purposes.
  • An increasingly large percentage of these basic financial systems are resident in microcomputer and workstation systems.
  • Basic financial systems include general-ledger accounting systems with associated accounts receivable, accounts payable, capital asset, inventory, invoicing, payroll and purchasing subsystems. These systems incorporate worksheets, files, tables and databases. These databases, tables and files contain information about the company operations and its related accounting transactions. As will be detailed below, these databases, tables and files are accessed by the application software of the present invention as required to extract the information required for completing a business valuation.
  • the system is also capable of extracting the required information from a data warehouse (or datamart) when the required information has been pre-loaded into the warehouse.
  • General ledger accounting systems generally store only valid accounting transactions. As is well known, valid accounting transactions consist of a debit component and a credit component where the absolute value of the debit component is equal to the absolute value of the credit component. The debits and the credits are posted to the separate accounts maintained within the accounting system. Every basic accounting system has several different types of accounts. The effect that the posted debits and credits have on the different accounts depends on the account type as shown in Table 5.
  • the general ledger system generally maintains summary, dollar only transaction histories and balances for all accounts while the associated subsystems, accounts payable, accounts receivable, inventory, invoicing, payroll and purchasing, maintain more detailed historical transaction data and balances for their respective accounts. It is common practice for each subsystem to maintain the detailed information shown in Table 6 for each transaction.
  • Advanced financial systems including financial planning systems, generally use the same format used by basic financial systems in forecasting income statements, balance sheets and cash flow statements for future periods. Management uses the output from financial planning systems to highlight future financial difficulties with a lead time sufficient to permit effective corrective action and to identify problems in company operations that may be reducing the profitability of the business below desired levels. These systems are most often developed by individuals within companies using 2 and 3 dimensional spreadsheets such as Lotus 1-2-3®, Microsoft Excel® and Quattro Pro®. In some cases, financial planning systems are built within an executive information system (EIS) or decision support system (DSS).
  • EIS executive information system
  • DSS decision support system
  • the advanced financial system database is the financial planning system database detailed in U.S. Pat. No. 5,165,109 for “Method of and System for Generating Feasible, Profit Maximizing Requisition Sets”, by Jeff S. Eder, the disclosure of which is incorporated herein by reference.
  • ERP Enterprise Requirements Planning Systems
  • MRP Material Requirement Planning Systems
  • Purchasing Systems Scheduling Systems and Quality Control Systems
  • Systems similar to the one described above may also be useful for distributors to use in monitoring the flow of products from a manufacturer.
  • Operation Management Systems in manufacturing firms may also monitor information relating to the production rates and the performance of individual production workers, production lines, work centers, production teams and pieces of production equipment including the information shown in Table 8.
  • Sales management systems are similar to operation management systems in that they vary considerably depending on the type of firm they are supporting and they generally have the ability to forecast future events as well as track historical occurrences.
  • the sales management system is generally integrated with an estimating system that tracks the flow of estimates into quotations, orders and eventually bills of lading and invoices.
  • sales management systems In other firms that sell more standardized products, sales management systems generally are used to track the sales process from lead generation to lead qualification to sales call to proposal to acceptance (or rejection) and delivery. All sales management systems would be expected to store information similar to that shown below in Table 10.
  • Sales Management System Information 1. Customer/Potential customer name 2. Customer number 3. Address 4. Phone number 5. Source of lead 6. Date of first purchase 7. Date of last purchase 8. Last sales call/contact 9. Sales call history 10. Sales contact history 11. Sales history: product/qty/price 12. Quotations: product/qty/price 13. Custom product percentage 14. Payment history 15. Current A/R balance 16. Average days to pay
  • Human resource systems are increasingly used for storing and maintaining corporate records concerning active employees in sales, operations and the other functional specialties that exist within a modern corporation. Storing records in a centralized system facilitates timely, accurate reporting of overall manpower statistics to the corporate management groups and the various government agencies that require periodic updates.
  • human resource systems include the company payroll system as a subsystem. In the preferred embodiment of the present invention, the payroll system is part of the basic financial system. These systems can also be used for detailed planning regarding future manpower requirements.
  • Human resource systems typically incorporate worksheets, files, tables and databases that contain information about the current and future employees. As will be detailed below, these databases, tables and files are accessed by the application software of the present invention as required to extract the information required for completing a business valuation. It is common practice for human resource systems to store the information shown in Table 11 for each employee.
  • External databases such as those found on the internet ( 5 ) can be used for obtaining information that enables the categorization and valuation of assets such as brand names, trademarks and service marks (hereinafter, referred to as brand names). In some cases it can also be used to supplement information obtained from the other databases ( 10 , 15 , 30 , 35 and 40 ) that are used in categorizing and evaluating employee groups and other elements of value.
  • the retrieval of information from the internet ( 5 ) can be:
  • System processing of the information from the different databases ( 5 , 10 , 15 , 30 , 35 and 40 ) described above starts in a block 201 , FIG. 5A , which immediately passes processing to a software block 202 .
  • the software in block 202 prompts the user via the system settings data window ( 901 ) to provide system setting information.
  • the system setting information entered by the user ( 20 ) is transmitted via the interconnection network ( 25 ) back to the application server ( 120 ) where it is stored in the system settings table ( 140 ) in the application database ( 50 ) in a manner that is well known.
  • the specific inputs the user ( 20 ) is asked to provide at this point in processing are shown in Table 12.
  • Weighted average cost of capital (to be used in discounting cash flows) 15. Simplified analysis (no sub-components of expense or capital value) 16. Number of months a product is considered new after it is first produced 17. Define composite variables? (Yes or No) 18. Amount of cash and marketable securities required for day to day operations
  • the software in block 202 uses the valuation date specified by the user ( 20 ) to determine the time periods (months) that require data in order to complete the valuation of the current operation and the growth options and stores the resulting date range in the system settings table ( 140 ).
  • the valuation of the current operation by the system requires sales, operation, finance, external database and human resource data for the three year period before and the four year period after the specified valuation date. Because of the difficulties inherent in forecasting from the perspective of the past or the future, the specified valuation date is generally within a month of the current system date.
  • processing advances to a software block 203 where the data dictionaries from the basic financial system database ( 10 ), the operation management system database ( 15 ), the advanced financial system database ( 30 ), the sales management system database ( 35 ) and the human resource information system database ( 40 ) are extracted and saved in the data dictionary table ( 149 ) in the application database ( 50 ) and processing advances to a software block 204 .
  • the software in block 204 checks the system settings table ( 140 ) in the application database ( 50 ) to determine if the current calculation is a comparison to a prior valuation or if it is a stand-alone calculation. If the calculation involves a comparison with a prior valuation, then the software in block 204 retrieves the previously defined account structure, data definitions, enterprise definitions and component definitions and saves them in the appropriate tables for use in the current calculation before processing advances to a software block 209 . Alternatively, if the calculation is a stand-alone, then processing advances to a software block 205 .
  • the software in block 205 interacts with an account structure and data dictionary data window ( 902 ) that prompts the user for any input that is required to define data fields for the extracted data dictionaries and the data dictionary of the application software of the present invention. This input is also saved to the data dictionary table ( 149 ).
  • the software in block 205 also prompts the user ( 20 ) via the account structure and data dictionary data window ( 902 ) for information that edits or defines the account structure used in the financial system databases. It is common practice for account numbers to have several segments where each segment represents a different set of subgroups as shown below in Table 13.
  • the different account number segments are used for separating the financial information for analysis.
  • processing advances to a block 206 where the software in the block interacts with an enterprise definition data window ( 903 ) to prompt the user ( 20 ) to specify the account number segment or segments that will be used to define the enterprise being valued by the innovative system of the present invention.
  • the user ( 20 ) could specify that each division is to be analyzed as a separate enterprise. In this case, if the total company had two business units with six divisions, then the user could specify up to six enterprises as shown in Table 14.
  • the specified enterprises are then displayed to the user ( 20 ) by the software in block 206 via the enterprise definition data window ( 903 ).
  • the user ( 20 ) is given the option of combining the enterprises or leaving them in the initial configuration.
  • the user ( 20 ) could combine the Personal Computer Product enterprise and the Workstation Product enterprise into one enterprise for the business valuation calculation.
  • the resulting specifications are stored in the enterprise definition table ( 155 ) in the application database ( 50 ).
  • departments, accounts and sub-accounts are the only segments that can be utilized for expense or capital component and sub-component specification. This limitation is applicable because their position numbers 3, 2 and 1 respectively are below 4, the position number of the division segment that was the lowest position used to define the enterprise.
  • the enterprise definition automatically defines the revenue component.
  • each enterprise has: one revenue component, five expense sub-components (cost of raw materials, the cost of manufacture or delivery of service, the cost of sales, the cost of support and other costs), four capital sub-components used in the valuation calculation (cash, non-cash financial assets, other (non-financial, non-production) assets, liabilities), and two capital sub-components that are not used directly in the valuation calculation (production equipment and equity).
  • the software in block 207 via the component definition data window ( 904 ) will accept all logical combinations of account number segment specifications for a sub-component while preventing the reuse of the same segment for more than one sub-component specification in each enterprise.
  • Sub-component definitions are required even if the user ( 20 ) has chosen to run a simplified analysis (i.e., one without sub-components). Table 15 provides examples of expense and capital sub-component definitions.
  • the software in block 207 saves the new or updated revenue component definitions to the revenue component definition table ( 150 ), expense sub-component definitions to the expense component definition table ( 151 ) and capital sub-component definitions to the capital component definition table ( 152 ).
  • the production equipment and other asset definitions are also used to populate the physical asset ID table ( 145 ) and the asset liquidation price table ( 146 ) with the names of all assets used by all enterprises.
  • processing advances to a software block 209 .
  • Processing can also advance to block 209 directly from block 204 if the calculation is a comparison to a prior valuation.
  • the software in block 209 checks to determine if all the available financial data have been included in a revenue, expense, or capital component or sub-component. In the example shown above, block 209 would check to determine that the financial data for all divisions, departments, account numbers and sub-account numbers have been assigned to a component. If the software in block 209 determines that all financial data have been assigned to a component, then processing advances to a software block 210 .
  • processing advances to a software block 208 .
  • the software in block 208 prompts an edit component definition data window ( 905 ) to display a screen that provides the user ( 20 ) with the ability to redefine previously stored component and sub-component definitions to include the unassigned financial data.
  • the revised component definition(s) are then saved in the appropriate definition table(s) ( 150 , 151 or 152 ) in the application database ( 50 ) and processing returns to block 209 and from there to software block 210 .
  • the software in block 210 retrieves the debit or credit balances from the basic financial system database ( 10 ) and the advanced financial system database ( 30 ) in account segment position order, lowest position to highest position, for the revenue, expense and capital components for the time periods determined by the software in block 202 and stored in the system settings table ( 140 ).
  • the software in block 210 would first retrieve and total debits and credits in each required period for the sub-components that have sub-account specifications. The higher level specifications, account number, department and division, are observed when data are retrieved for the sub-components with sub-account specifications. The software in block 210 would then retrieve the required data for the sub-components with account number specifications.
  • the higher level specifications, department and division are observed when data are retrieved for the sub-components with account number specifications.
  • the software in block 210 would finally retrieve the required data for the sub-components with department number specifications.
  • the higher level specification, division is observed when data are retrieved for these sub-components. This same procedure is completed for each enterprise and the resulting totals are then saved in the appropriate data tables ( 141 -revenue, 142 -expense and 143 -capital) in the application database ( 50 ).
  • system processing advances to a software block 212 .
  • the software in block 212 determines if any of the components or sub-components are missing data for any of the required periods. Missing data is defined as the condition when there is a null value for a sub-component financial data field in a required period. If the software in block 212 determines that all components have the required data in all periods, then processing advances directly to a software block 221 . Alternatively, if data are missing, then processing advances to a software block 213 where the user ( 20 ) is prompted by a missing financial data window ( 906 ) to provide the missing data or the location of the missing data.
  • the user ( 20 ) may simply replace the null value with a zero.
  • the appropriate data tables ( 141 -revenue, 142 -expense and/or 143 -capital) in the application database ( 50 ) are updated and processing advances to software block 221 .
  • the next step in system processing is completed by software block 221 where the software in the block prompts the user ( 20 ) via an element of value specification data window ( 907 ) to define the elements of value for each enterprise, to indicate the maximum number of sub-elements for each element and to identify the identity and location of transaction data and other information that are related to each element of value.
  • Elements of value with sample specifications are shown below in Table 16.
  • the software in block 222 prompts the user ( 20 ) via a growth option definition data window ( 908 ) to specify the growth options that will be valued for each enterprise.
  • the specification of each growth option includes: an option name; the financial resources consumed or generated by the growth option by component of value; the resources associated with the growth option by element of value, and the number of scenarios that will be analyzed as part of the growth option valuation.
  • a growth option specification example is shown below in Table 17.
  • the software in block 225 prompts the user ( 20 ) via a tax information data window ( 910 ) to provide an overall tax rate for the company and detailed schedules for federal income taxes plus any other taxes as shown in Table 18.
  • the software in block 227 prompts the user ( 20 ) via a liability information data window ( 912 ) to provide historical and forecast information concerning each account included in the financial liability sub-component stored in the capital component definition table ( 152 ) as shown in Table 20.
  • the software in block 228 calculates the current weighted average cost of capital using the information stored in the debt and equity tables ( 174 and 144 , respectively) using Formula 1 shown below.
  • Weighted average cost of capital (( D/V ) ⁇ R D )(1 ⁇ T )+( E/V ⁇ R E ) Formula 1
  • the software in block 232 checks the asset liquidation price table ( 146 ) to determine if there are “current” (as defined previously) liquidation prices for all physical assets listed in the physical asset ID table ( 145 ). If there are “current” prices for all physical assets listed in the physical asset ID table ( 145 ), then processing advances to a software block 302 where the identification of the value drivers begins. If, on the other hand, there are not “current” prices for all physical assets, then processing advances to a software block 235 . The software in block 235 prompts the user ( 20 ) via a liquidation price entry data window ( 914 ) to provide liquidation prices for all physical assets that don't have “current” values.
  • the user ( 20 ) is given the option of specifying a liquidation value as a fixed price, as a percentage of original purchase price or as a percentage of book value (as stored in the basic financial system database ( 10 )).
  • a liquidation value as a fixed price, as a percentage of original purchase price or as a percentage of book value (as stored in the basic financial system database ( 10 )).
  • FIG. 6A , FIG. 6B , FIG. 6C , FIG. 6D and FIG. 6E detail the processing that is completed by the portion of the application software ( 300 ) that identifies the item variables and item performance indicators that drive revenue, expense and changes in capital by element for all defined enterprises.
  • the item variables and item performance indicators identified during this processing are collectively referred to as “value drivers”.
  • Processing begins in software block 302 .
  • the software in block 302 checks the composite variable table ( 156 ) and the revenue driver table ( 179 ) in the application database ( 50 ) to determine if all enterprise revenue components have “current” drivers and composite variables for all elements. If all enterprise revenue components have “current” drivers for all elements, then processing advances to a software block 306 . Alternatively, if there are any revenue components without “current” drivers for at least one element, then processing advances to a software block 303 .
  • the software in block 303 uses the element of value definition table ( 153 ) and excluded variables table ( 182 ) to guide the retrieval of information required to specify the next revenue driver model that is being updated.
  • All information related to the enterprise element being examined less any information identified in the excluded variable table ( 182 ) is retrieved by block 303 from the primary databases including: the basic financial system database ( 10 ), the operation management system database ( 15 ), the advanced financial system database ( 30 ), the sales management system database ( 35 ), the human resource information system database ( 40 ), and external databases found on the internet ( 5 ) by item.
  • the element being modeled was the customer element that was defined by the customer numbers in the range from 1 to 21,877, then all numeric and date fields in data records containing a customer number, save those listed in the excluded variable table ( 182 ), would be retrieved and stored in the revenue driver table ( 179 ) by item.
  • the numeric and date field data are collectively referred to as “item variables”.
  • the software in block 304 calculates expressions by item for each numeric data field including: cumulative total value, the period to period rate of change in value, the rolling average value and the time lagged value of each numeric item variable. In a similar fashion the software in block 304 calculates expressions for each date field including time since last occurrence, cumulative time since first occurrence, average frequency of occurrence and the rolling average frequency of occurrence.
  • the numbers calculated from numeric and date fields are collectively referred to as “item performance indicators”. After the item performance indicators are calculated and stored in the revenue driver table ( 179 ) in the application database ( 50 ), processing advances to a software block 305 .
  • the software in block 305 creates a predictive time series neural net model for the revenue driver. More specifically, the software in the block creates a neural network model that relates the item variables and item performance indicators for a given enterprise to the revenue component.
  • Neural networks are increasingly being used for statistically modeling the relationships between sets of data. One of the main reasons for the increase in their use is that they are effective in modeling relationships even when there are nonlinear relationships and interactions between independent variables. Neural networks consist of a number of processing elements (hereinafter, referred to as nodes) that send data to one another via connections. The strengths of the connections between the nodes are referred to as weights. As shown in FIG.
  • Input nodes receive data values from input variables ( 701 ).
  • a threshold node ( 710 -THRESH) is a special class of input node ( 710 - x ) with a constant weight of 1 on the connection to a hidden node ( 720 - x ).
  • Hidden nodes ( 720 - x ) create intermediate representations of the relationship between input data and the output values. It is important to note that while the diagram in FIG. 10 shows only one layer of hidden nodes ( 703 ), in many cases a network model will contain several layers of hidden nodes. Finally, output nodes ( 730 ) produce output variables ( 705 ).
  • the action of a neural network is determined by two things: the architecture, that is how many input, hidden and output nodes it has; and the values of the weights.
  • a neural network “learns” by modifying its weights ( 706 and 707 ) to minimize the difference between the calculated output value ( 705 ) and the actual output value.
  • the difference between the calculated output value and the actual output value is defined as the error function for the network.
  • the error function is defined by Formula 2.
  • ERR ⁇ ( W ) k 1 / 2 ⁇ ( R k - Y ⁇ ( W ) ) 2 _
  • W a ⁇ ⁇ set ⁇ ⁇ of ⁇ ⁇ weight ⁇ ⁇ values
  • ERR ⁇ ( W ) k error ⁇ ⁇ function ⁇ ⁇ for ⁇ ⁇ W ⁇ ⁇ for ⁇ ⁇ period ⁇ ⁇ k
  • R k actual / forecast ⁇ ⁇ revenue ⁇ ⁇ for ⁇ ⁇ period ⁇ ⁇ k
  • Y ⁇ ( W ) output ⁇ ⁇ value ⁇ ⁇ for ⁇ ⁇ W Formula ⁇ ⁇ 2
  • the software in block 305 determines the number of the input nodes and hidden nodes for each network as a function of the number of item variables and item performance indicators specified by the software in blocks 303 and 304 . There are also additional input nodes for prior period revenue and for a threshold node. For the system of the present invention, the number of hidden nodes is derived by adding one (1) to the number of input nodes. Table 21 shows the calculation of the number of nodes in an example predictive revenue model.
  • the processing completed by all of the network nodes ( 710 - x, 720 - x and 730 ) is similar.
  • the input nodes ( 710 - x ) receive their input of item variables and item performance indicators by item by period while the hidden node ( 720 - x ) receives its input from the input nodes and the output nodes ( 730 - x ) receive their input from the hidden nodes.
  • Each node multiplies the received input by the corresponding weight ( 706 or 707 ) to produce a weighted sum.
  • the network applies a sigmoid or linear function to the weighted sum to determine the state of the node.
  • each node is then passed on to the next layer along a weighted connection or it is used to generate an output variable.
  • processing advances to a software block 325 where network optimization begins.
  • the normal operation of a neural network requires the use of very large amounts of data to train the network to minimize the error function and then test the networks predictive capabilities.
  • the preferred embodiment of the present invention minimizes the need for very large data sets by using genetic algorithms to find the weights (W) that reduce the error function to an acceptable level before optimizing the network using the backpropagation algorithm to determine the “best fit”.
  • the software in a block 325 uses genetic algorithms to find solutions for the current error minimization problem by evolving a set of solutions toward the desired goal of having an error function value of zero.
  • the genetic algorithms in block 325 create and maintain a population of the software equivalent of DNA chromosomes (hereinafter, chromosomes) that “evolve” toward the specified goal by using selective crossover and random mutation to generate new chromosomes.
  • chromosomes (see Table 22 below) encode the network weights.
  • Each individual “gene” represents a weight between two sets of nodes.
  • the fitness of each chromosome in the population is evaluated by the proximity of the resulting solution to the expected objective function maximum (the maximum of the objective function corresponds to the minimum error level of the neural network).
  • Selective crossover in a genetic algorithm gives a preference to the chromosomes (sets of weights) that are the most fit (e.g., have lowest error and highest objective function outputs).
  • Crossover is a form of reproduction that separates each of two individual chromosomes into two separate pieces at a random break point.
  • Crossover is completed when the algorithm recombines the top piece from the first chromosome with the bottom piece of the second chromosome and the bottom piece from the first chromosome with the top piece from the second chromosome to produce two new chromosomes that have a mix of “genes” from each of the original chromosomes. Giving a preference to the most fit chromosomes increases the likelihood that the new chromosomes will produce more fit solutions than the precursor chromosomes. Mutation is the random change in the value of a randomly selected “gene”. Mutation occurs to “genes” during crossover. It also occurs in individual chromosomes within the population.
  • the evolutionary process is enhanced in the present invention using three separate mechanisms.
  • the fitness measures for individual chromosomes are re-scaled before crossover by the software in block 325 whenever the difference between the fitness of the top 10% of population and the bottom 10% of the population is less than 5% of the expected solution.
  • the fitness of the chromosome(s) with the lowest fitness is arbitrarily changed to 10% of the target value and the fitness of the chromosome(s) with the highest fitness is set to 95% of the target value.
  • the remaining chromosomes fitness values are adjusted accordingly. This adjustment has the effect of restoring the relative advantage that the fitter chromosomes have in being selected for crossover.
  • the second mechanism for speeding the evolutionary process is to pick only the fittest members of a population for inclusion in the next generation.
  • the current generation is combined with the two preceding generations and the fittest third from the combined population is carried forward for crossover and mutation in the next generation by the software in block 325 .
  • the sensitivity of the solution to the inclusion of all “genes” is tested when the fitness of a chromosome reaches the target level or the fitness of the population fails to increase for the maximum number of successive generations specified by the user (see System Settings, Table 12).
  • the highest level of fitness achieved is established as the new target and processing advances to a block 330 after the resulting genes are stored in the driver genes table ( 183 ).
  • the software in block 330 creates parallel populations where the “genes” (weights) associated with one item variable or item-performance indicator are removed from each chromosome before processing advances to a software block 335 .
  • the software in a block 335 repeats the evolution process using the parallel population with the highest initial average fitness. If the fitness level of a chromosome in the parallel populations equals or exceeds the target value after a minimum number of generations (equal to the user specified maximum—see System Settings, Table 12) or the fitness of the population fails to increase for the user specified maximum number of successive generations, then processing advances to a block 340 . If the software in block 340 determines that a chromosome in the parallel population has reached a new target level, then the genes are stored in the driver genes table ( 183 ) and the processing returns to a block 330 where process of creating parallel populations by removing potential driver “genes” is repeated. The overall process of evolution and removal of item variables and item performance indicators continues in this manner until the new parallel populations fail to reach a new target level at which point processing is advanced to a software block 345 .
  • the software in block 345 uses the three chromosomes that achieved the highest fitness to initialize three distinct induction algorithms or causal models. While the neural network software in blocks 325 and 335 is capable of determining which item variables and item performance indicators correlate most strongly with changes in revenue, their configuration does not provide for identification of the item variables and item performance indicators that are causing changes in revenue (i.e. the “value drivers”). The item variables and item performance indicators that didn't correlate strongly with changes in revenue were “pruned” during the evolution of the high fitness chromosomes. As a result, the chromosomes in the three most “fit” chromosomes contain the item variables and item performance indicators that correlate most strongly with revenue changes. Eliminating low correlation factors from the initial configuration of the induction algorithms increases their processing efficiency.
  • processing passes to a software block 350 .
  • the software in block 350 sub-divides the item variable, item performance indicator and revenue data into ten (10) distinct subgroups before processing passes to a block 355 .
  • the software in block 355 uses a model selection algorithm to identify the induction algorithm that best fits the data for the element being examined. For the system of the present invention, a cross validation algorithm is used for model selection.
  • the software in block 355 optimizes each of the induction algorithms using nine (9) of the ten (10) sets of data. As part of this processing, the duplication of the information related to each item is eliminated as only the strongest causal factor variables are included in the final solution.
  • the resulting equation from each induction algorithm is then tested using the data from the remaining set to identify the causal model that produces the best fit for that set of test data.
  • the equations produced by the induction algorithms will hereinafter be referred to as composite variables. This process is repeated ten (10) times which allows each subgroup to be used as the basis for validating model performance.
  • the composite variables and value drivers from the induction algorithm that produced the best results are then saved in the composite variable table ( 156 ), composite variable data table ( 168 ) and revenue driver table ( 179 ) in the application database ( 50 ) and processing returns to a block 302 .
  • the software in block 302 determines that there are elements that still require new revenue value driver models, then the processing described in the preceding paragraphs is repeated. Alternatively, if the software in block 302 determines that there are “current” revenue value drivers for all elements in all enterprises, then processing advances to a software block 306 .
  • the software in block 306 checks the composite variable table ( 156 ) and the expense driver table ( 180 ) in the application database ( 50 ) to determine if all enterprise expense components have “current” drivers and composite variables for all elements. If all enterprise expense components have “current” drivers and composite variables for all elements, then processing advances to a software block 312 .
  • processing advances to a software block 307 .
  • the software in block 307 uses the element of value definition table ( 153 ) and excluded variable table ( 182 ) to guide the retrieval of information required to specify the next expense driver model that is being updated. All information related to the enterprise element being examined less any information identified in the excluded variable table ( 182 ) is retrieved by block 307 from the primary databases including: the basic financial system database ( 10 ), the operation management system database ( 15 ), the advanced financial system database ( 30 ), the sales management system database ( 35 ), the human resource information system database ( 40 ), and external databases found on the internet ( 5 ) by item.
  • processing advances to a software block 308 .
  • the software in block 308 calculates expressions by item for each numeric data field and each date field in manner identical to that described previously for software block 304 .
  • processing advances to a software block 309 .
  • the software in block 309 creates a predictive time series neural net model for the expense driver in a manner similar to that described previously for block 305 .
  • processing proceeds through blocks 325 , 330 , 335 , 340 , 345 , 350 and 355 in a manner identical to that described above for the processing of the revenue value driver model before returning to block 306 .
  • the software in block 306 determines that there are elements that still require new expense value driver models, than the processing described in the preceding paragraphs is repeated.
  • processing advances to a software block 312 .
  • the software in block 312 checks the composite variable table ( 156 ) and the capital driver table ( 181 ) in the application database ( 50 ) to determine if all enterprise capital components have “current” drivers and composite variables for all elements. If all enterprise capital components have “current” drivers and composite variables for all elements, then processing advances to a software block 375 .
  • processing advances to a software block 313 .
  • the software in block 313 uses the element of value definition table ( 153 ) and excluded variables table ( 182 ) to guide the retrieval of information required to specify the next capital driver model that is being updated. All information related to the enterprise element being examined less any information identified in the excluded variable table ( 182 ) is retrieved by block 313 from the primary databases including: the basic financial system database ( 10 ), the operation management system database ( 15 ), the advanced financial system database ( 30 ), the sales management system database ( 35 ), the human resource information system database ( 40 ), and external databases found on the internet ( 5 ) by item.
  • processing advances to a software block 314 .
  • the software in block 314 calculates expressions by item for each numeric data field and each date field in manner identical to that described previously for software blocks 304 and 308 .
  • processing advances to a software block 315 .
  • the software in block 315 creates a predictive time series neural net model for the capital driver in a manner similar to that described previously for block 305 and 309 .
  • processing proceeds through blocks 325 , 330 , 335 , 340 , 345 , 350 and 355 in a manner identical to that described above for the processing of the expense and revenue value driver models before returning to block 312 .
  • the software in block 312 determines that there are elements that still require new capital value driver models, than the processing described in the preceding paragraphs is repeated. Alternatively, if the software in block 312 determines that there are “current” capital value drivers for all elements in all enterprises, then processing advances to a software block 317 .
  • the software in block 317 checks the element of value definition table ( 153 ) and sub-element definition table ( 154 ) to determine if the user ( 20 ) has specified that there will be sub-elements of value for any of the elements. If the user ( 20 ) has specified that there will be no sub-elements of value, then processing advances to a block 375 where the elements are checked for interaction.
  • processing advances to a software block 318 .
  • the software in block 318 checks the element of value definition table ( 153 ) to determine the number of elements that have sub-elements before advancing processing to a block 319 .
  • the software in block 319 retrieves the element of value definition for the next element with defined sub-elements from the element of value definition table ( 153 ) before advancing processing to a block 321 .
  • the software in block 321 checks the sub-element definition table ( 154 ) to determine if the sub-elements assignments for all items within the element are “current”. If the sub-element assignments are “current”, then processing returns to block 318 which checks to see if all elements with sub-elements have been reviewed in the current cycle of processing. If the software in block 318 determines that all elements have been reviewed, then system processing advances to a software block 332 . Alternatively, if there are elements still need to be reviewed, then processing returns to block 319 as described previously. If the software in block 319 determines that the sub-element assignments are not “current”, then processing advances to a block 326 where the sub-element assignments are completed.
  • the software in block 326 checks the system settings table ( 140 ) to determine if the calculation being completed is a stand-alone calculation or a comparison to a prior calculation. If the software in block 326 determines that the current calculation is not being used for a comparison, then the processing advances to a software block 322 .
  • the software in block 322 retrieves the value driver data by item for the element being analyzed from the composite variable data table ( 168 ) before creating a normalized set of value driver data for each item within the element of value being analyzed. The normalized value for each value driver data element for each item in each period is then calculated using Formula 3 shown below.
  • MN minimum positive or most negative data value for all element items
  • “Kohonen” network processing begins when the software in block 323 initializes at random the weights ( 716 ) between the output layer ( 713 ) and the input layer ( 712 ) with small values.
  • the system starts sequentially entering the normalized composite variable data from the normalized composite variable data table ( 169 ) into the input layer ( 712 ).
  • the normalized value for each variable is entered into a different input node ( 750 - x ) and transmitted from there to the output layer ( 713 ).
  • the nodes in the output layer ( 760 - x ) each compute their matching values (V i ) using Formula 4 shown below:
  • the matching value (V i ) essentially represents the distance between the vectors ( ⁇ i ) and x. Therefore, the output node ( 760 ) with the lowest matching value is also the node that most closely matches the input vector.
  • the unit that is closest to the input is declared the winner and its weight ( ⁇ ij ) along with the weights of the neighboring output nodes are updated.
  • the change in weight for the winning node and its neighbors is calculated using Formula 5 shown below.
  • represents the learning rate (see Formula 6)
  • the application of this formula diminishes the difference between the weights of the output nodes and the weights of the input vectors. Output nodes that are not neighbors of the winning node are not updated. The output nodes are updated after each input and over time the application of the formulas shown above will tend to create clusters of similar nodes.
  • the input vectors (data patterns) are cycled through the “Kohonen” network a pre-determined number of times which are referred to as epochs.
  • the total number of epochs (T) will be set by the software to somewhere between 500 and 10,000 depending upon the number of composite sort variables used for the element.
  • the neighborhood size that is the quantity of adjacent nodes that are considered to be neighbors, is adjusted downward from its initial value of 75% of the value of N by one node at a time as the number of epochs increases from zero (0) to its maximum number (T).
  • the learning rate ( ⁇ ) is determined by Formula 6 shown below.
  • the software in block 323 arbitrarily assigns a number to each output node ( 760 - x ).
  • the software in block 323 then calculates the distance between the input vector (x) of each item and the weight in each output node ( 760 - x ) using Formula 4.
  • the software in block 323 then assigns the number of the closest output node ( 760 - x ) to the item and stores the resulting information in the sub-element definition table ( 154 ) in the application database ( 50 ).
  • the software in block 323 also stores the final value of all network weights in the sub-element weights table ( 157 ) in application database ( 50 ).
  • processing advances to a software block 327 .
  • the software in block 327 retrieves the sub-element weights from the previous calculation from the sub-element weights table ( 157 ) and reestablishes the prior sub-element assignments by using Formula 4 to determine the appropriate sub-element assignment for each item.
  • processing advances to a software block 328 .
  • the software in block 328 checks the composite variable data table ( 168 ) to see if there are any new items for elements being analyzed. If there are no new items, then processing returns to block 318 as described previously. Alternatively, if the software in block 328 determines that there are new items, then processing advances to a software block 329 .
  • the software in block 329 determines the appropriate sub-element assignment for each new item by calculating the normalized value of the input vector for each new item and using formula 4 to determine which output node (i.e., which sub-element from the previous calculation) each item should be assigned to.
  • the inputs for these calculations are stored in the normalized composite variable data table ( 169 ) and the results are stored in the composite variable data table ( 168 ) in the application database before processing returns to block 318 as described previously.
  • processing advances to block 332 as described previously.
  • the software in block 332 checks the composite variable ( 156 ), revenue driver ( 179 ), expense driver ( 180 ) and capital driver ( 181 ) tables to determine if the value drivers and composite variables for all sub-elements are current. If they are current, then processing advances to a software block 375 . Alternatively, if the sub-element drivers and composite variables are not current, then processing advances to a block 337 .
  • the software in block 337 checks the revenue driver table ( 179 ) in the application database ( 50 ) to determine if all enterprise revenue sub-components have “current” drivers and composite variables for all elements. If all enterprise revenue sub-components have “current” drivers and composite variables for all elements, then processing advances to a software block 341 . Alternatively, if there are any revenue components without “current” drivers for at least one element, then processing advances to a software block 338 . The software in block 338 uses the sub-element definition table ( 154 ) and excluded variables table ( 182 ) to guide the retrieval of information required to specify the next revenue driver model that is being updated.
  • All information related to the enterprise element being examined less any information identified in the excluded variable table ( 182 ) is retrieved by block 338 from the primary databases including: the basic financial system database ( 10 ), the operation management system database ( 15 ), the advanced financial system database ( 30 ), the sales management system database ( 35 ), the human resource information system database ( 40 ), and external databases found on the internet ( 5 ) by item.
  • the primary databases including: the basic financial system database ( 10 ), the operation management system database ( 15 ), the advanced financial system database ( 30 ), the sales management system database ( 35 ), the human resource information system database ( 40 ), and external databases found on the internet ( 5 ) by item.
  • the software in block 339 calculates performance indicators by item for each date and numeric data field in a manner similar to that described for block 304 .
  • processing advances to a software block 305 .
  • the software in block 305 creates a predictive time series neural net model for the revenue driver as described previously.
  • processing proceeds through blocks 325 , 330 , 335 , 340 , 345 , 350 in a manner identical to that described previously for the processing of the revenue value driver model before advancing to a block 360 .
  • the software in block 360 uses a model selection algorithm to identify the induction algorithm that best fits the data for the element being examined.
  • a cross validation algorithm is used for model selection.
  • the software in block 360 optimizes each of the induction algorithms using nine (9) of the ten (10) sets of data. As part of this processing, the duplication of the information related to each item is eliminated as only the strongest causal factor variables are included in the final solution.
  • the composite variable from each induction algorithm is then tested using the data from the remaining set to identify the causal model that produces the best fit for that set of test data.
  • the previously calculated composite variable for the revenue element is also compared to the sub-element composite variables as part of this processing.
  • This process is repeated ten (10) times which allows each subgroup to be used as the basis for validating model performance.
  • the composite variable and value drivers that produced the best results are then saved in the composite variable table ( 156 ), composite variable data table ( 168 ) and revenue driver table ( 179 ) in the application database ( 50 ) and processing returns to a block 337 .
  • the processing described in the preceding paragraphs is repeated.
  • the software in block 337 determines that there are “current” revenue value drivers for all sub-elements in all enterprises, then processing advances to a software block 341 .
  • the software in block 341 checks the expense driver table ( 180 ) in the application database ( 50 ) to determine if all enterprise expense components have “current” drivers for all elements. If all enterprise expense components have “current” drivers for all sub-elements, then processing advances to a software block 352 . Alternatively, if there are expense sub-components without “current” drivers for at least one element, then processing advances to a software block 342 .
  • the software in block 342 uses the sub-element definition table ( 154 ) and excluded variables table ( 182 ) to guide the retrieval of information required to specify the next expense driver model that is being updated. All information related to the enterprise sub-element being examined less any information identified in the excluded variable table ( 182 ) is retrieved by block 342 from the primary databases including: the basic financial system database ( 10 ), the operation management system database ( 15 ), the advanced financial system database ( 30 ), the sales management system database ( 35 ), the human resource information system database ( 40 ), and external databases found on the internet ( 5 ) by item.
  • processing advances to a software block 343 .
  • the software in block 343 calculates expressions by item for each numeric data field and each date field in manner identical to that described previously for software block 339 .
  • processing advances to a software block 309 .
  • the software in block 309 creates a predictive time series neural net model for the expense driver as described previously.
  • processing proceeds through blocks 325 , 330 , 335 , 340 , 345 , 350 and 360 in a manner identical to that described above for the processing of the revenue value driver model before returning to block 341 .
  • the processing described in the preceding paragraphs is repeated.
  • the software in block 341 determines that there are “current” expense value drivers for all sub-elements in all enterprises, then processing advances to a software block 352 .
  • the software in block 352 checks the capital driver table ( 181 ) in the application database ( 50 ) to determine if all enterprise capital components have “current” drivers for all elements. If all enterprise capital components have “current” drivers for all sub-elements, then processing advances to software block 375 . Alternatively, if there are capital sub-components without “current” drivers for at least one element, then processing advances to a software block 353 .
  • the software in block 353 uses the sub-element definition table ( 154 ) and excluded variables table ( 182 ) to guide the retrieval of information required to specify the next capital driver model that is being updated. All information related to the enterprise sub-element being examined less any information identified in the excluded variable table ( 182 ) is retrieved by block 353 from the primary databases including: the basic financial system database ( 10 ), the operation management system database ( 15 ), the advanced financial system database ( 30 ), the sales management system database ( 35 ), the human resource information system database ( 40 ), and external databases found on the internet ( 5 ) by item.
  • processing advances to a software block 354 .
  • the software in block 354 calculates expressions by item for each numeric data field and each date field in manner identical to that described previously for software blocks 339 and 343 .
  • processing advances to a software block 315 .
  • the software in block 315 creates a predictive time series neural net model for the capital driver as described previously.
  • processing proceeds through blocks 325 , 330 , 335 , 340 , 345 , 350 and 360 in a manner identical to that described above for the processing of the revenue value driver model before returning to block 352 .
  • the software in block 375 checks the value drivers to determine if there is any interaction between drivers for different elements. If interaction between element drivers is discovered, then processing advances to a block 402 where the valuation of growth options is started. Alternatively, if no interaction between element drivers is found, then system processing is completed in accordance with the specification of U.S. patent application Ser. No. 08/779,109.
  • the flow diagram in FIG. 7 details the processing that is completed by the portion of the application software ( 400 ) that calculates the value of the growth options for each enterprise. Processing begins in block 402 where the software in the block checks the growth option value table ( 178 ) to determine if there are “current” valuations for all defined growth options. If there are no defined growth options or no growth options that require a new valuation, then processing advances to a transfer block 403 and on to a block 501 where the components of value are analyzed.
  • system processing advances to a software block 404 where the software in the block retrieves the previously stored data from the growth option definition table ( 175 ) for the next growth option and then advances processing to a block 405 .
  • the software in block 405 checks the growth option definition table information to determine if there are multiple scenarios for the growth option being analyzed. If there is only one scenario for the growth option being analyzed, then processing advances to a block 407 . Alternatively, if there are multiple scenarios, then processing advances to a block 408 .
  • the software in block 408 prompts the user ( 20 ) via the growth option scenario definition data window ( 916 ) to input or update: the number of scenarios, the name of the scenarios and the probability that each scenario will occur for the growth option being valued.
  • the probability of each scenario is specified as a percentage.
  • the sum of the scenario probabilities must equal 100% for each growth option.
  • the user ( 20 ) is allowed to change the scenarios even if the system ( 100 ) is calculating a business valuation comparison as the comparison will be made at the growth option level not at the scenario level.
  • the input from the user ( 20 ) is stored in the growth option definition table ( 175 ) in the application database ( 50 ) before processing advances to a block 409 .
  • the software in block 409 checks the growth option scenario table ( 177 ) in the application database ( 50 ) to determine if there are “current” data for every scenario listed in the growth option definition table ( 175 ). If there are “current” data for all scenarios, then processing advances to block 407 where the value of the total deductions from revenue components, expense sub-components, capital sub-components and elements of value for the growth option are calculated. Alternatively, if some or all of the scenarios for the growth option being examined don't have “current” data, then processing advances to a block 410 . The software in block 410 retrieves the information for the scenario from the growth option scenario table ( 177 ) and advances processing to a software block 411 .
  • the software in block 411 generates a form that is displayed using a scenario revenue and expense data window ( 917 ) for the user ( 20 ) to complete.
  • the form identifies the time periods that revenue and expense forecasts are required for the growth option scenario in accordance with the calculations previously completed by the application software and stored in the system settings table ( 140 ).
  • the forecast information the user ( 20 ) provides is saved to the growth option scenario table ( 177 ) in the application database ( 50 ). If the scenario being examined is the first scenario for the growth option, then the user ( 20 ) is also asked to quantify any growth-option related expenses by account number that were incurred in prior periods.
  • the user ( 20 ) is not asked to identify any prior period growth option revenue as a growth option is by definition a project that will lead to revenue at some date in the future.
  • the information regarding prior period expenses is saved in expense data table ( 142 ) in the application database ( 50 ).
  • the user ( 20 ) is also asked to identify the months where the prior expenses and/or the forecast revenue and the forecast expenses for the growth option scenario were included in the overall company totals.
  • the users input regarding the overlapping periods for the scenario is saved in the growth option overlap table ( 176 ) in the application database ( 50 ) and processing advances to a software block 412 .
  • the software in block 412 prompts the user ( 20 ) via a scenario capital data window ( 918 ) to edit or provide a forecast of the capital requirements for the scenario by month for the time periods required for growth option valuation in accordance with the calculations previously completed by the application software and stored in the system settings table ( 140 ).
  • the forecast information the user ( 20 ) provides is saved to the growth option scenario table ( 177 ) in the application database ( 50 ). If the scenario being examined is the first scenario for the growth option, then the user ( 20 ) is also asked to quantify any growth-option related capital investments by account number that were present in prior periods.
  • the information regarding prior period capital requirements is saved in the capital data table ( 143 ) in the application database ( 50 ).
  • the user ( 20 ) is also asked to identify the months where the prior period actual and/or forecast capital requirements for the growth option scenario were included in the overall company totals.
  • the users input regarding overlapping periods for the scenario is saved in the growth option overlap table ( 176 ) in the application database and processing advances to a software block 413 .
  • the software in block 413 prompts the user ( 20 ) via a scenario element of value data window ( 919 ) to edit or provide a forecast of element of value usage by month for the time periods required for growth option valuation in accordance with the calculations previously completed by the application software.
  • the forecast information the user ( 20 ) provides is saved to the growth option scenario table ( 177 ) in the application database ( 50 ). If the scenario being examined is the first scenario for the growth option, then the user ( 20 ) is also asked to identify any growth-option related element of value usage that occurred in prior periods. The information regarding prior period use of the elements of value is saved in the element of value data table ( 144 ).
  • the user ( 20 ) is also asked to identify the months where the prior period and/or forecast element of value usage for the growth option were included in the overall company totals.
  • the users input regarding overlapping periods is saved in the growth option overlap table ( 176 ) in the application database and processing returns to a software block 409 .
  • the processing sequence described above is repeated until all scenarios have “current” data.
  • processing advances to block 407 .
  • the software in block 407 calculates the total value of revenue, expense, capital and element of value deductions for each scenario.
  • the software in block 407 also calculates the weighted average forecast of total growth option revenues, expenditures, capital and element of value deductions for each period by multiplying the forecast revenue, capital and element of value deductions for each scenario by the probability of that scenario realization.
  • the totals for the growth option revenue, expense, capital, and element of value deductions are then saved in the appropriate data tables ( 141 through 146 ) in the application database ( 50 ).
  • processing advances to a software block 406 where the value of the growth option is calculated using dynamic programming algorithms in a manner that is well known. The process described in the preceding paragraphs is repeated until all growth options have “current” valuations and processing advances to block 502 as described previously.
  • the flow diagram in FIG. 8 details the processing that is completed by the portion of the application software ( 500 ) that analyzes the components and sub-components of value. Processing begins in a software block 502 .
  • the software in block 502 checks the enterprise value table ( 170 ) in the application database ( 50 ) to determine if there are “current” valuations for all enterprises for the date for which the current valuation is being calculated. If there are “current” valuations for all enterprises, then processing advances to a software block 515 where the software in the block calculates the total company current operation value. However, if some or all of the enterprises don't have “current” valuations, then processing advances to a software block 503 .
  • the software in block 503 retrieves the definition for the next enterprise that doesn't have a “current” valuation from the enterprise definition table ( 155 ) in the application database ( 50 ). Processing then advances to a software block 504 .
  • the software in block 504 checks the data from the revenue component definition table ( 150 ) for the revenue component of the enterprise being valued to determine if there is a “current” valuation for the component. If there is a “current” valuation for the revenue component, then processing advances to a software block 507 where the values of the expense component or expense sub-components for the enterprise are checked to determine if they are “current”. However, if the revenue component valuation isn't “current”, then processing advances to a software block 505 .
  • the software in block 505 retrieves the information for the revenue component from the revenue data table ( 141 ) and processing advances to a software block 506 .
  • the revenue component value is calculated for the specified date of valuation using Formula 7 shown below.
  • the result is stored in the revenue component definition table ( 150 ) in the application database ( 50 ) and processing advances to a software block 507 .
  • the software in block 507 checks the expense component definition table ( 151 ) in the application database ( 50 ) to determine if there are “current” valuations for all expense components or sub-components in the enterprise being valued. If the user ( 20 ) has previously stored information in the system settings table ( 140 ) specifying a “simplified” analysis, then the expense component values will be checked. Alternatively, if the user ( 20 ) has not selected a simplified analysis, then the expense sub-component values will be checked. If there are “current” valuations for the expense components or all sub-components, then processing advances to a block 510 where the values of the capital components for the company are checked to determine if they are “current”.
  • processing advances to a software block 508 .
  • the software in block 508 retrieves the information from the expense data table ( 142 ) for the expense component or the next expense sub-component that doesn't have a “current” valuation. Processing then advances to a software block 509 .
  • the valuation of the expenses is calculated for the specified date of valuation using Formula 7. After the valuation of the expense component or expense sub-component has been completed, the results are stored in the expense component definition table ( 151 ) in application database ( 50 ) and processing returns to a software block 507 .
  • the software in block 510 checks the capital component definition table ( 152 ) in the application database ( 50 ) to determine if there are “current” valuations for all capital components. If the user ( 20 ) has previously stored information in the system settings table ( 140 ) specifying a “simplified” analysis, then the capital component value for the enterprise will be checked. Alternatively, if the user ( 20 ) has not selected a simplified analysis, then the standard capital sub-components will be checked. If there are “current” valuations for all capital components, then processing advances to a software block 514 where the enterprise current operation value is calculated. If the valuation for the capital component or some of the capital sub-components is not “current”, then processing advances to a software block 511 .
  • the software in block 511 retrieves the information required for valuation of the next capital component or sub-component that doesn't have a “current” valuation from the capital data table ( 143 ) in the application database ( 50 ). Processing then advances to a software block 512 .
  • the software in block 512 calculates the value of the capital component or capital sub-component using Formula 7. After the valuation of the capital component or a capital sub-component is complete, the results are stored in the capital component definition table ( 152 ) in the application database ( 50 ) and system processing returns to block 510 . If there are still capital sub-components that don't have current valuations, then the processing described above is repeated for the next sub-component. Alternatively, if the capital component or all capital sub-components have current valuations, then processing advances to a software block 514 .
  • the software in block 514 calculates the current operation value of each enterprise by summing the previously calculated component and sub-component values as shown in Table 4.
  • the calculated value for the enterprise current operation is stored in the enterprise value table ( 170 ) in the application database ( 50 ) and processing returns to block 502 which again checks the enterprise value table ( 170 ) in the application database ( 50 ) to determine if all enterprises have “current” values. If there are still enterprises without “current” values, then processing advances to block 503 and the processing described in the preceding paragraphs is repeated for another enterprise. Alternatively, if all the enterprises have “current” values, then processing transfers to a block 515 where the software in the block adds the enterprise values together to calculate the value of the current-operation for the total company. The total company current-operation value is stored in the enterprise value table ( 170 ) in the application database ( 50 ) and processing advances to a software block 602 where the predictive model specification and optimization is started.
  • FIG. 9A and FIG. 9B detail the processing that is completed by the portion of the application software ( 600 ) that uses predictive models to determine the relationship between the value drivers and the revenue, expense and capital components of all defined enterprises.
  • Processing begins in software block 602 .
  • the software in block 602 checks the revenue model weights table ( 159 ) in the application database ( 50 ) to determine if the revenue components for all enterprises have “current” models. If there are revenue components without “current” predictive models, then processing advances to a software block 603 where the information specifying the next revenue component is retrieved from the revenue component definition table ( 150 ) in the application database ( 50 ).
  • processing advances to a software block 604 where the software in the block creates a predictive time series neural net model for the revenue component. More specifically, the software in the block creates a neural network model that relates the value drivers for a given enterprise to the revenue component.
  • the software in block 604 determines the number of the input nodes and hidden nodes for the network as a function of the number of value drivers associated with the enterprise revenue component. There are also additional input nodes for prior period revenue and for a threshold node. The software in block 604 sets the initial number of hidden layers to one. The software in block 604 also establishes one output node for the revenue and sets all weights to random numbers between 0 and 1 (except the threshold node weight which is fixed at 1). The processing completed by the network nodes ( 710 - x, 720 - x and 730 ) was described previously. After the network architecture including the nodes has been specified by the software in block 604 , processing advances through blocks 325 , 330 , 335 and 340 as described previously.
  • the process of evolving a preliminary solution continues until the new parallel populations fail to reach a new target level and processing is then advanced to a block 625 .
  • As part of this processing revenue model genes are stored in the expense model genes table ( 160 ) in a manner identical to that described previously for the storage of model genes.
  • the software in block 625 uses the chromosome that achieved the highest fitness to initialize a feed-forward neural network.
  • the network is then trained by the software in a block 630 using a traditional backpropagation algorithm to further minimize the error function associated with the network.
  • the resulting weights for the enterprise are then saved in the revenue model weights table ( 159 ) in the application database ( 50 ) and processing returns to a block 602 .
  • processing advances to a software block 605 .
  • the software in block 605 checks the expense model weights table ( 161 ) in the application database ( 50 ) to determine if the expense component or all expense sub-components have “current” models. If the user ( 20 ) has previously stored information in the system settings table ( 140 ) specifying a “simplified” analysis, then the expense component model will be checked before processing advances to another block. Alternatively, if the user ( 20 ) has not selected a simplified analysis, then the expense sub-component models will be checked before processing advances to another block. In either case, processing will advance to block 607 if the expense models aren't “current” and to block 611 if they are “current”.
  • the software in block 607 retrieves the information specifying the expense component or the next expense sub-component from the expense component definition table ( 151 ) in the application database ( 50 ). After the required information is retrieved, processing advances to a block 608 where the predictive expense model is specified in a manner similar to that described previously for the predictive revenue model. From block 608 , processing advances to blocks 325 , 330 , 335 , 340 , 625 and 630 where the genetic evolution of the fittest solution is completed in a manner similar to that described above for the predictive revenue model. As part of this processing expense model genes are stored in the expense model genes table ( 160 ) in a manner identical to that described previously for the storage of revenue model genes. If there are sub-components, then the process described above is repeated until all expense sub-components have “current” models. When all expense components or all expense sub-components have “current” models, processing advances to a software block 611 .
  • the software in block 611 checks the capital model weights table ( 163 ) in the application database ( 50 ) to determine if the capital component or all capital sub-components have “current” models. If the user ( 20 ) has previously stored information in the system settings table ( 140 ) specifying a “simplified” analysis, then the capital component model will be checked before processing advances to another software block. Alternatively, if the user ( 20 ) has not selected a simplified analysis, then the standard capital sub-component models will be checked before processing advances to another software block 613 . In either case, processing will advance to block 613 if the models aren't “current” and to block 772 if they are “current”.
  • the software in block 613 retrieves the information specifying the capital component or the next capital sub-component from the capital component definition table ( 152 ) in the application database ( 50 ). After the required information is retrieved, processing advances to a block 614 where the predictive capital model is specified in a manner similar to that described previously for the predictive revenue and expense models. From block 614 , processing advances to blocks 325 , 330 , 335 , 340 , 625 and 630 where the genetic evolution of the fittest solution is completed in a manner similar to that described above for the predictive revenue and expense model. As part of this processing, capital model genes are stored in the capital model genes table ( 162 ) in a manner identical to that described previously for the storage of revenue and expense model genes.
  • the flow diagram in FIG. 12 details the processing that is completed by the portion of the application software ( 700 ) that values all elements and sub-elements of current-operation value for all enterprises.
  • Processing begins in software block 772 .
  • the software in block 772 checks the revenue component percentage table ( 164 ) in the application database ( 50 ) to determine if the revenue component models for all enterprises have “current” percentages. If there are revenue components without “current” percentages, then processing advances to a block 773 where the information specifying the next revenue component is retrieved from the revenue component definition table ( 150 ) and the revenue model weights table ( 159 ) in the application database ( 50 ).
  • processing advances to a block 774 where relationships between the elements and sub-elements of value and the revenue component are determined.
  • the software in block 774 uses the network weights ( 706 and 707 ) previously stored in the revenue model weights table ( 159 ) to segregate the hidden-layer ( 703 ) to output-layer ( 704 ) connection weights ( 707 ) for each hidden node ( 720 - x ) into the components associated with each input node ( 710 - x ).
  • the portion of the output attributable to each input node is then determined by Formula 8 (shown below).
  • I jk Absolute value of the input weight ( 706 ) from input node j to hidden node k
  • O k Absolute value of output weight ( 707 ) from hidden node k
  • n number of input nodes
  • the portion of the revenue value attributable to each element or sub-element of value is calculated by adding together the percentages from all value drivers associated with each element or sub-element of value. The result of these calculations is then stored in the revenue component percentage table ( 164 ) in the application database ( 50 ).
  • the portion of the revenue value that can't be attributed to an element or sub-element of value is generally the portion that is attributed to the prior period revenue. This portion of the value will be referred to as going concern revenue component.
  • processing returns to block 772 .
  • the software in block 772 checks the application database ( 50 ) to determine if all revenue components have “current” model percentages. If there are still revenue components without “current” percentages, then the system repeats the processing described in the preceding paragraphs. Alternatively, if all of the revenue component models have “current” percentages, then processing advances to a software block 775 .
  • the software in block 775 checks the expense component percentage table ( 165 ) in the application database ( 50 ) to determine if all expense component or sub-component models for all enterprises have “current” percentages. If the user ( 20 ) has previously stored information in the system settings table ( 140 ) specifying a “simplified” analysis, then the expense component percentages will be checked. Alternatively, if the user ( 20 ) has not selected a simplified analysis, then the expense sub-component percentages will be checked.
  • processing advances to a software block 776 where the information specifying the next expense component or sub-component is retrieved from the expense component definition table ( 151 ) and the expense model weights table ( 161 ) in the application database ( 50 ).
  • processing advances to a software block 777 where the percentages of value for the expense component or sub-component are calculated in a manner identical to that described previously for revenue components.
  • the portion of the expense value that can't be attributed to an element or sub-element of value is generally the portion that is attributed to the prior period expense. This portion of the value will be referred to as going concern expense component.
  • processing After the storage of the percentages of the expense component or sub-component to the expense component percentage table ( 165 ) has been completed, processing returns to block 775 .
  • the software in block 775 checks the expense component percentage table ( 165 ) in the application database ( 50 ) to determine if all expense component or sub-component models have “current” percentages. If there are still expense component or sub-component models without “current” percentages, then the system repeats the processing described above. Alternatively, if all of the expense component or sub-component models have “current” percentages, then processing advances to a software block 778 .
  • the software in block 778 checks the capital component percentage table ( 166 ) in the application database ( 50 ) to determine if all capital component or sub-component models for all enterprises have “current” percentages. If the user ( 20 ) has previously stored information in the system settings table ( 140 ) specifying a “simplified” analysis, then the capital component percentages will be checked. Alternatively, if the user ( 20 ) has not selected a simplified analysis, then the capital sub-component percentages will be checked.
  • processing advances to a software block 779 where the information specifying the next capital component or sub-component is retrieved from the capital component definition table ( 152 ) and the capital model weights table ( 163 ) in the application database ( 50 ).
  • processing advances to a software block 780 where the percentages of value for the capital component or sub-component are calculated in a manner identical to that described previously for revenue and expense components.
  • the portion of the capital element or sub-element value that can't be attributed to an element or sub-element of value is generally the portion that is attributed to the prior period capital requirements. This portion of the value will be referred to as going concern capital value.
  • processing After the storage of the percentages of the capital component or sub-component to the capital component percentage table ( 166 ) has been completed, processing returns to block 778 .
  • the software in block 778 checks the capital component percentage table ( 166 ) in the application database ( 50 ) to determine if all capital components or sub-components have “current” percentages. If there are still capital component or sub-component models without “current” percentages, then the system repeats the processing described above ( 779 and 780 ). Alternatively, if all of the capital components or sub-components have “current” percentages, then processing advances to a software block 781 .
  • the software in block 781 combines all the revenue component, expense component or sub-component and capital component or sub-component values together to calculate the overall value for each element or sub-element of value by enterprise as shown in Table 4.
  • the calculated value of production equipment element (or sub-elements) of value is compared to the liquidation value for the equipment in the element.
  • the stored value for the element (or sub-elements) will be the higher of liquidation value or calculated value.
  • Residual Going Concern Value Total Current-Operation Value ⁇ Financial Asset Values ⁇ Elements of Value ⁇ Sub-Elements of Value Formula 9
  • the flow diagram in FIG. 13 details the processing that is completed by the portion of the application software ( 800 ) that creates, displays and optionally prints financial management reports.
  • the primary management report, the Value MapTM report summarizes information about the elements and sub-elements of business value on the valuation date. If a comparison calculation has been completed, a Value Creation report can be generated to highlight changes in the elements and sub-elements of business value during the period between the prior valuation and the current valuation date.
  • System processing in this portion of the application software ( 800 ) begins in block 802 .
  • virtually all of the information required to produce the Value MapTM report has been calculated using the methods outlined in Table 1 as detailed in the preceding sections.
  • the software in block 802 retrieves the required information from the enterprise value table ( 170 ), debt data table ( 174 ) and equity data table ( 144 ) in the application database ( 50 ) and then calculates the economic equity for the business as a whole using Formula 10 (shown below).
  • Enterprise ⁇ ⁇ Equity ( Enterprise ⁇ ⁇ Current ⁇ ⁇ Operation ⁇ ⁇ Value ) + ( ⁇ Enterprise ⁇ ⁇ Growth ⁇ ⁇ Option ⁇ ⁇ Values ) - ( Current ⁇ ⁇ Enterprise ⁇ ⁇ Liabilities ) - ( Current ⁇ ⁇ Enterprise ⁇ ⁇ Debt ) ⁇ ⁇
  • ⁇ ⁇ ⁇ ( Enterprise ⁇ ⁇ Equity ) Book * Equity + Economic ⁇ ⁇ Equity ⁇ ⁇ * ⁇ calculated ⁇ ⁇ in ⁇ ⁇ accordance ⁇ ⁇ with ⁇ ⁇ GAAP Formula ⁇ ⁇ 11
  • a summary Value MapTM report (see FIG. 14 for format) for the entire company is created and stored in the reports table ( 172 ) and processing advances to a software block 803 .
  • the software in block 803 checks the system settings table ( 140 ) to determine if the current valuation is being compared to a previous valuation. If the current valuation is not being compared to a previous valuation, then processing advances to a software block 805 . Alternatively, if the current valuation is being compared to a previously calculated valuation, then processing advances to a software block 804 .
  • the software in block 804 calculates Value Creation Statements (see FIG. 15 for format) for each enterprise and for the business as a whole for the specified time period. After the Value Creation Statements are stored in the reports table ( 172 ) in the application database ( 50 ), processing advances to a software block 805 .
  • the software in block 805 displays the summary Value MapTM report to the user ( 20 ) via a report data window ( 909 ).
  • system processing advances to a software block 806 where the user is prompted via a report selection data window ( 915 ) to designate additional reports for creation, display and/or printing.
  • the report selection data window ( 915 ) also gives the user ( 20 ) the option of having a report created to analyze the relationship between the market value of the business and the calculated business value.
  • the user ( 20 ) has the option of creating, displaying or printing the Value MapTM reports for the company as a whole and/or for any combination of the enterprises within the company.
  • the user ( 20 ) can also choose to create, display or print a Value Creation Statement for the business as a whole and/or for any combination of enterprises if a comparison calculation were being made.
  • the software in block 806 creates and displays all Value MapTM reports and Value Creation Statements requested by the user ( 20 ) via the report selection data window ( 915 ).
  • processing advances to a software block 807 .
  • the software in block 807 transfers processing to a software block 808 if the user ( 20 ) has chosen to have the relationship between market value and calculated business value examined.
  • the software in block 808 compares the market value of the business to the calculated value by completing the Formula 12 for each complete valuation stored in the reports table ( 172 ).
  • the average ratio of market value to calculated business value and the standard deviation of the ratio are then calculated using standard regression analysis methods and stored in the equity forecast table ( 148 ) in the application database.
  • the software in block 808 will calculate a range for equity prices on the valuation date by combining the results of previous calculations of the relationship between equity value and calculated value with the forecast of future value that was just completed.
  • the software will calculate the future equity value range using both the average ratio of total business value to total market value.
  • the software in block 808 then prepares a report summarizing the results of the preceding calculations that is stored in the reports table ( 172 ) in the application database ( 50 ) and processing advances to a software block 809 . If the user ( 20 ) elects not to complete the calculated valuation versus equity price analysis, then the software in block 807 advances processing directly to a software block 809 .
  • the software in block 809 checks the reports tables ( 172 ) to determine if any reports have been designated for printing. If reports have been designated for printing, then processing advances to a block 810 which sends the designated reports to the printer ( 118 ). After the reports have been sent to the printer ( 118 ), processing advances to a software block 811 where processing stops. If no reports were designated for printing then processing advances directly from block 809 to 811 where processing stops.
  • the system and method described above transforms extracted transaction data and information into detailed valuations for specific elements of a business enterprise.
  • the level of detail contained in the business valuations allows users of the system to monitor and manage efforts to improve the value of the business in a manner that is superior to that available to users of traditional accounting systems and business valuation reports.
  • the user also has the option of examining the relationship between the calculated business value and the market price of equity for the business.

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Development Economics (AREA)
  • Accounting & Taxation (AREA)
  • Human Resources & Organizations (AREA)
  • Finance (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Tourism & Hospitality (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Technology Law (AREA)
  • Data Mining & Analysis (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

An automated system (100) and method for analyzing, modeling and valuing elements of a business enterprise on a specified valuation date. The performance of the elements are analyzed using search algorithms and induction algorithms to determine the value drivers associated with each element. The induction algorithms are also used to create composite variables that relate element performance to enterprise revenue, expenses and changes in capital. Predictive models are then used to determine the correlation between the value drivers and the enterprise revenue, expenses and changes in capital. The correlation percentages for each value driver are then multiplied by capitalized value of future revenue, expenses and changes in capital, the resulting numbers for each value driver associated with each element are then added together to calculate a value for each element.

Description

    CONTINUATION AND CROSS REFERENCE TO RELATED PATENT
  • This application is a continuation of application Ser. No. 08/999,245 filed Dec. 10, 1997. The subject matter of this application is also related to the subject matter of U.S. Pat. No. 5,615,109 for “Method of and System for Generating Feasible, Profit Maximizing Requisition Sets”, by Jeff S. Eder, the disclosure of which is incorporated herein by reference.
  • BACKGROUND OF THE INVENTION
  • This invention relates to a method of and system for business valuation, more particularly, to an automated system that analyzes elements of a business to identify their value drivers, models the value creation impact of the elements and computes a valuation of each of the elements on a specified date.
  • The valuation of a business is a complex and time-consuming undertaking. Business valuations determine the price that a hypothetical buyer would pay for a business under a given set of circumstances. The volume of business valuations being performed each year is increasing significantly. A leading cause of this growth in volume is the increasing use of mergers and acquisitions as vehicles for corporate growth. Business valuations are frequently used in setting the price for a business that is being bought or sold. Another reason for the growth in the volume of business valuations has been their increasing use in areas other than supporting merger and acquisition transactions. For example, business valuations are now being used by financial institutions to determine the amount of credit that should be extended to a company, by courts in determining litigation settlement amounts and by investors in evaluating the performance of company management.
  • In most cases, a business valuation is completed by an appraiser or a Certified Public Accountant (hereinafter, appraiser) using a combination of judgment, experience and an understanding of generally accepted valuation principles. The two primary types of business valuations that are widely used and accepted are income valuations and asset valuations. Market valuations are also used in some cases but their use is restricted because of the difficulty inherent in trying to compare two different companies.
  • Income valuations are based on the premise that the current value of a business is a function of the future value that an investor can expect to receive from purchasing all or part of the business. Income valuations are the most widely used type of valuation. They are generally used for valuing businesses that are expected to continue operating for the foreseeable future. In these valuations the expected returns from investing in the business and the risks associated with receiving the expected returns are evaluated by the appraiser. The appraiser then determines the value whereby a hypothetical buyer would receive a sufficient return on the investment to compensate the buyer for the risk associated with receiving the expected returns. Income valuation methods include the capitalization of earnings method, the discounted future income method, the discounted cash flow method, the economic income method and other formula methods.
  • Asset valuations consider the business to be a collection of assets which have an intrinsic value to a third party in an asset sale. Asset valuations are typically used for businesses that are ceasing operation and for specific type of businesses such as holding companies and investment companies. Asset valuation methods include the book value method, the adjusted book value method, the economic balance sheet method and the liquidation method.
  • Market valuations are used to place a value on one business by using valuations that have been established for comparable businesses in either a public stock market or a recent transaction. This method is difficult to use properly because no two companies are exactly the same and no two transactions are completed for the exact same reasons. Market valuation methods include the price to earnings method, the comparable sales method, industry valuation methods and the comparable investment method.
  • When performing a business valuation, the appraiser is generally free to select the valuation type and method (or some combination of the methods) in determining the business value. Under the current procedures, there is no correct answer, there is only the best possible informed guess for any given business valuation. There are several difficulties inherent in this approach. First, the reliance on informed guessing places a heavy reliance on the knowledge and experience of the appraiser. The recent increase in the need for business valuations has strained the capacity of existing appraisal organizations. As a result, the average experience level of those performing the valuations has decreased. The situation is even worse for many segments of the American economy where experienced appraisers don't exist because the industries are too new. Another drawback of the current procedures for completing a valuation is that the appraiser is typically retained and paid by a party to a proposed transaction. It is difficult in this situation to be certain that the valuation opinion is unbiased and fair. Given the appraiser's wide latitude for selecting the method, the large variability of experience levels in the industry and the high likelihood of appraiser bias, it is not surprising that it is generally very difficult to compare the valuations of two different appraisers—even for the same business. These limitations in turn serve to seriously diminish the usefulness of business valuations to business managers, business owners and financial institutions.
  • The usefulness of business valuations to business owners and managers is limited for another reason—valuations typically determine only the value of the business as a whole. To provide information that would be useful in improving the business, the valuation would have to furnish supporting detail that would highlight the value of different elements of the business. An operating manager would then be able to use a series of business valuations to identify elements within a business that have been decreasing in value. This information could also be used to identify corrective action programs and to track the progress that these programs have made in increasing business value. This same information could also be used to identify elements that are contributing to an increase in business value. This information could be used to identify elements where increased levels of investment would have a significant favorable impact on the overall health of the business.
  • Another limitation of the current methodology is that financial statements and accounting records have traditionally provided the basis for most business valuations. Appraisers generally spend a great deal of time extracting, aggregating, verifying and interpreting the information from accounting systems as part of the valuation process. Accounting records do have the advantage of being prepared in a generally unbiased manner using the consistent framework of Generally Accepted Accounting Principles (hereinafter, GAAP). Unfortunately, these accounting statements have proved to be increasingly inadequate for use in evaluating the financial performance of modern companies.
  • Many have noted that traditional accounting systems are driving information-age managers to make the wrong decisions and the wrong investments. Accounting systems are “wrong” for one simple reason, they track tangible assets while ignoring intangible assets. Intangible assets such as the skills of the workers, intellectual property, business infrastructure, databases, and relationships with customers and suppliers are not measured with current accounting systems. This oversight is critical because in the present economy the success of an enterprise is determined more by its ability to use its intangible assets than by its ability to amass and control the physical ones that are tracked by traditional accounting systems.
  • The recent experience of several of the most important companies in the U.S. economy, IBM, General Motors and DEC, illustrates the problems that can arise when intangible asset information is omitted from corporate financial statements. All three were showing large profits using current accounting systems while their businesses were falling apart. If they had been forced to take write-offs when the declines in intangible assets were occurring, the problems would have been visible to the market and management would have been forced to act on them much sooner. These deficiencies of traditional accounting systems are particularly noticeable in high technology companies that are highly valued for their intangible assets and their options to enter new markets rather than their tangible assets.
  • The accounting profession itself recognizes the limitations of traditional accounting systems. A group of senior financial executives, educators and consultants that had been asked to map the future of financial management by the American Institute of Certified Public Accountants (AICPA) recently concluded that:
      • a) Operating managers will continue to lose confidence in traditional financial reporting systems,
      • b) The motto of CFOs in the future will likely be “close enough is good enough”, and
      • c) The traditional financial report will never again be used as the exclusive basis for any business decisions.
  • The deficiency of traditional accounting systems is also one of the root causes of the short term focus of many American firms. Because traditional accounting methods ignore intangible assets, expenditures that develop a market or expand the capabilities of an organization are generally shown as expenses that only decrease the current period profit. For example, an expenditure for technical training which increases the value of an employee to an enterprise is an expense while an expenditure to refurbish a piece of furniture is capitalized as an asset.
  • Even when intangible assets have been considered, the limitations in the existing methodology have severely restricted the utility of the valuations that have been produced. All known prior efforts to value intangible assets have been restricted to independent valuations of different types of intangible assets with only limited attempts to measure the actual impact of the asset on the enterprise that owns it. Some of the intangible assets that have been valued separately in this fashion are: brand names, customers and intellectual property. Problems associated with the known methods for valuing intangible assets include:
      • 1. Interaction between intangible assets is ignored, for example the value of a brand name is in part a function of the customers that use the product—the more prestigious the customers, the stronger the brand name. In a similar fashion the stronger the brand name, the more likely it will be that customers will stay a long time. Valuing either of these assets in isolation will give the wrong answer; and,
      • 2. The value of an intangible asset is a function of the benefit that it provides the enterprise. Therefore, measuring the value of an intangible asset requires a method for measuring the actual impact of the asset on the enterprise—something that is missing from known existing methods
  • The historical dependence on accounting records for valuing business enterprises has to some extent been a matter of simple convenience. Because corporations are required to maintain financial records for tax purposes, accounting statements are available for virtually every company. At the same time, the high cost of data storage has until recently prevented the more detailed information required for valuing intangibles from being readily available. In a similar manner, the absence of integrated corporate databases within corporations and the home-grown nature of most corporate systems has until recently made it difficult to compare similar data from different firms. Unfortunately, even the firms that have established integrated business management systems find that retrieving the information required to perform an integrated analysis of their data is a cumbersome task. These firms also find that there are few tools that facilitate the analysis of the information after it is gathered together in one place.
  • The lack of a consistent, well accepted, realistic method for measuring all the elements of business value also prevents some firms from receiving the financing they need to grow. Most banks and lending institutions focus on book value when evaluating the credit worthiness of a business seeking funds. As stated previously, the value of many high technology firms lies primarily in intangible assets and growth options that aren't visible under traditional definitions of accounting book value. As a result, these businesses generally aren't eligible to receive capital from traditional lending sources, even though their financial prospects are generally far superior to those of companies with much higher tangible book values.
  • In light of the preceding discussion, it is clear that it would be advantageous to have an automated financial system that measured the financial performance of all the elements of business value for a given enterprise. Ideally, this system would be capable of generating detailed valuations for businesses in new industries.
  • SUMMARY OF THE INVENTION
  • It is a general object of the present invention to provide a novel and useful system that calculates and displays a comprehensive and accurate valuation for the elements of an enterprise that overcomes the limitations and drawbacks of the prior art that were described previously.
  • A preferable object to which the present invention is applied is the valuation of elements of a high technology commercial enterprise where a significant portion of the business value is associated with intangible assets.
  • The present invention eliminates a great deal of time-consuming and expensive effort by automating the extraction of transaction data from the databases, tables, and files of the existing computer-based corporate finance, operation, sales, and human resource software databases as required to operate the system. In accordance with the invention, the automated extraction, aggregation and analysis of transaction data from a variety of existing computer-based systems significantly increases the scale and scope of the analysis that can be completed. The system of the present invention further enhances the efficiency and effectiveness of the business valuation by automating the retrieval, storage and analysis of information useful for valuing intangible assets from external databases and publications via the internet or other external networks.
  • Uncertainty over which method is being used for completing the valuation and the resulting inability to compare different valuations is eliminated by the present invention by consistently utilizing different valuation methodologies for valuing the different elements of the enterprise as shown in Table 1.
  • TABLE 1
    Enterprise element Valuation methodology
    Excess Cash & Marketable Securities GAAP
    Total current-operation value (COPTOT): Income valuation*
    Current-operation: Cash & Marketable Securities GAAP
    (CASH)
    Current-operation: Accounts Receivable (AR) GAAP
    Current-operation: Inventory (IN) GAAP
    Current-operation: Prepaid Expenses (PE) GAAP
    Current-operation: Production Equipment (PEQ) If correlation value > liquidation value,
    then use correlation valuation, else
    use liquidation value
    Current-operation: Other Physical Assets (OPA) Liquidation Value
    Current-operation: Other Assets (OA) GAAP
    Current-operation: Intangible Assets (IA):
    Customers Correlation to component(s) of value
    Employees Correlation to component(s) of value
    Vendor Relationships Correlation to component(s) of value
    Strategic Partnerships Correlation to component(s) of value
    Brand Names Correlation to component(s) of value
    Other Intangibles Correlation to component(s) of value
    Current-operation: General going concern value GCV = COPTOT − CASH − AR −
    (GCV) IN − PE − PEQ − OPA − OA − IA
    Growth options Option pricing algorithms
    *The user also has the option of specifying the total value
  • The value of an enterprise operation is calculated by summing items from Table 1 as shown in Table 2.
  • TABLE 2
    Enterprise Value =
    Current value of enterprise excess cash and marketable securities +
    Value of current-operation +
    Value of growth options
  • As shown in Table 1, the growth opportunities of the firm are valued using option pricing algorithms. Option pricing algorithms are improvements over traditional methods as they correct two inaccurate assumptions implicit in traditional discounted cash flow analyses of business growth opportunities, namely: the assumption that investment decisions are reversible, and the assumption that investment decisions can not be delayed. In reality, a firm with a project that requires an investment has the right but not the obligation to buy an asset at some future time of its choosing. However, once the investment is made it is often irreversible—a situation analogous to a call option. Because option valuation algorithms explicitly recognize that investments of this type are often irreversible and that they can be delayed, the asset values calculated using these algorithms are more accurate than valuations created using more traditional approaches. The use of option pricing analysis for valuing growth opportunities (hereinafter, growth options) gives the present invention a distinct advantage over traditional approaches to business valuation.
  • The innovative system has the added benefit of providing a large amount of detailed information concerning both tangible and intangible elements of enterprise business value. The system also gives the user the ability to track the changes in elements of business value and total business value over time by comparing the current valuation to previously calculated valuations. As such, the system also provides the user with an alternative mechanism for tracking financial performance. To facilitate its use as a tool for improving the value of an enterprise, the system of the present invention produces reports in formats that are similar to the reports provided by traditional accounting systems. The method for tracking the elements of value for a business enterprise provided by the present invention eliminates many of the limitations associated with current accounting systems that were described previously.
  • BRIEF DESCRIPTION OF DRAWINGS
  • These and other objects, features and advantages of the present invention will be more readily apparent from the following description of the preferred embodiment of the invention in which:
  • FIG. 1 is a block diagram showing the major processing steps of the present invention;
  • FIG. 2 is a diagram showing the files or tables in the application database of the present invention that are utilized for data storage and retrieval during the processing that values elements of the enterprise;
  • FIG. 3 is a block diagram of an implementation of the present invention;
  • FIG. 4 is a diagram showing the data windows that are used for receiving information from and transmitting information to the user during system processing;
  • FIG. 5A and FIG. 5B are block diagrams showing the sequence of steps in the present invention used for extracting, aggregating and storing information utilized in system processing from: user input, the basic financial system database, the operation management system database, the advanced financial system database, the sales management system database, external databases via the internet and the human resource information system database;
  • FIG. 6A, FIG. 6B, FIG. 6C, FIG. 6D and FIG. 6E are block diagrams showing the sequence of steps in the present invention that are utilized in identifying the value drivers and defining the composite variables;
  • FIG. 7 is a block diagram showing the sequence of steps in the present invention used for the specification and valuation of growth options;
  • FIG. 8 is a block diagram showing the sequence of steps associated with the analyzing the components of enterprise value;
  • FIG. 9A and FIG. 9B are block diagrams showing the sequence of steps in the present invention that are utilized in the specification and optimization of the predictive models that determine the relationships between value drivers and the revenue, expense and capital components of enterprise value;
  • FIG. 10 is a diagram illustrating the processing of a feed-forward neural network;
  • FIG. 11 is a diagram illustrating the processing of a Kohonen neural network;
  • FIG. 12 is a block diagram showing the sequence of the steps in the present invention used for calculating the percentage of the revenue, expense and capital components attributed to the elements and sub-elements of value;
  • FIG. 13 is a block diagram showing the sequence of steps in the present invention used in preparing, displaying and optionally printing reports;
  • FIG. 14 is a sample Value Map™ report from the present invention showing the calculated value for all elements of value in the total company on the valuation date; and
  • FIG. 15 is a sample Value Creation report from the present invention detailing the changes in the elements of value and total company value from a prior date to the valuation date.
  • DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT
  • FIG. 1 provides an overview of the processing completed by the innovative system for business valuation. In accordance with the present invention, an automated method of and system (100) for business valuation is provided. Processing starts in this system (100) with a block of software (200) that extracts, aggregates and stores the transaction data and user input required for completing a valuation. This information is extracted via an interconnection network (25) from a basic financial system database (10), an operation management system database (15), an advanced financial system database (30), a sales management system database (35), and a human resource information system database (40). Information can also be extracted from an on-line external database such as those found on an internet (5) via a communications link (45). These information extractions and aggregations are guided by a user (20) through interaction with a user-interface portion of the application software (900) that mediates the display and transmission of all information to the user (20) from the system (100) as well as the receipt of information into the system (100) from the user (20) using a variety of data windows tailored to the specific information being requested or displayed in a manner that is well known. While only one database of each type (10, 15, 30, 35 & 40) is shown in FIG. 1, it is to be understood that the system (100) can extract data from multiple databases of each type via the interconnection network (25).
  • All extracted information concerning revenue, expenses, capital and elements of value is stored in a file or table (hereinafter, table) within an application database (50) as shown in FIG. 2. The application database (50) contains tables for storing user input, extracted information and system calculations including a system settings table (140), a revenue data table (141), an expense data table (142), a capital data table (143), an equity data table (144), a physical asset ID table (145), an asset liquidation price table (146), an account number structure table (147), an equity forecast table (148), a data dictionary table (149), a revenue component definition table (150), an expense component definition table (151), a capital component definition table (152), an element of value definition table (153), a sub-element definition table (154), an enterprise definition table (155), a composite variable table (156), a sub-element weights table (157), a revenue model gene table (158), a revenue model weights table (159), an expense model gene table (160), an expense model weights table (161), a capital model gene table (162), a capital model weights table (163), a revenue component percentage table (164), an expense component percentage table (165), a capital component percentage table (166), a composite variable location table (167), a composite variable data table (168), a normalized composite variable data table (169), an enterprise value table (170), an economic equity values table (171), a reports table (172), a tax data table (173), a debt data table (174), a growth option definition table (175), a growth option overlap table (176), a growth option scenario table (177), a growth option value table (178), a revenue driver table (179), an expense driver table (180), a capital driver table (181), an excluded variable table (182) and a driver genes table (183). The application database (50) can optionally exist as a datamart, data warehouse or departmental warehouse. The system of the present invention has the ability to accept and store supplemental or primary data directly from user input, a data warehouse or other electronic files in addition to receiving data from the databases described previously. The system of the present invention also has the ability to complete the necessary calculations without receiving data from one or more of the specified databases. However, in the preferred embodiment all required information is obtained from the specified databases (5,10,15, 30, 35 & 40).
  • As shown in FIG. 3, the preferred embodiment of the present invention is a computer system (100) illustratively comprised of a client personal computer (110) connected to an application server personal computer (120) via an interconnection network (25). The application server personal computer (120) is in turn connected via the interconnection network (25) to a database-server personal computer (130).
  • The database-server personal computer (130) has a CPU (136), a keyboard (132), a CRT display (133), a printer (137), a hard drive (131) for storage of the basic financial system database (10), the operation management system database (15), the advanced financial system database (30), the sales management system database (35) and the human resource information system database (40), a communications bus (134) and a read/write random access memory (135).
  • The application-server personal computer (120) has a CPU (127), a keyboard (123), a mouse (126), a CRT display (124), a printer (128), a hard drive (122) for storage of the application database (50) and the majority of the application software (200, 300, 400, 500, 600, 700 and 800) of the present invention, a communications bus (125) and a read/write random access memory (121). While only one client personal computer is shown in FIG. 3, it is to be understood that the application-server personal computer (120) can be networked to fifty or more client personal computers (110) via the interconnection network (25). The application-server personal computer (120) can also be networked to fifty or more server, personal computers (130) via the interconnection network (25). It is to be understood that the diagram of FIG. 3 is merely illustrative of one embodiment of the present invention.
  • The client personal computer (110) has a CPU (117), a keyboard (113), a mouse (116), a CRT display (114), a printer (118), a modem (119), a hard drive (112) for storage of a client data-base (49) and the user-interface portion of the application software (900), a communications bus (115) and a read/write random access memory (111).
  • The application software (200, 300, 400, 500, 600, 700, 800 and 900) controls the performance of the central processing unit (127) as it completes the calculations required to calculate the detailed business valuation. In the embodiment illustrated herein, the application software program (200, 300, 400, 500, 600, 700, 800 and 900) is written in a combination of PowerScript, C++ and Visual Basic®. The application software (200, 300, 400, 500, 600, 700, 800 and 900) also uses Structured Query Language (SQL) for extracting data from other databases (10, 15, 30, 35 and 40) and then storing the data in the application database (50) or for receiving input from the user (20) and storing it in the client database (49). The other databases contain information regarding historical financial performance (10), operation management records (15), forecast financial performance (30), sales prospects and transactions (35) and the company employees (40) that are used in the operation of the system (100). The user (20) provides the information the application software requires to determine which data need to be extracted and transferred from the database-server hard drive (131) via the interconnection network (25) to the application-server computer hard drive (122) by interacting with user-interface portion of the application software (900). The extracted information is combined with input received from the keyboard (113) or mouse (116) in response to prompts from the user-interface portion of the application software (900) before processing is completed.
  • User input is initially saved to the client database (49) before being transmitted to the communication bus (125) and on to the hard drive (122) of the application-server computer via the interconnection network (25). Following the program instructions of the application software, the central processing unit (127) accesses the extracted data and user input by retrieving it from the hard drive (122) using the random access memory (121) as computation workspace in a manner that is well known.
  • The computers (110, 120 and 130) shown in FIG. 3 illustratively are IBM PCs or clones or any of the more powerful computers or workstations that are widely available. Typical memory configurations for client personal computers (110) used with the present invention should include at least 32 megabytes of semiconductor random access memory (111) and at least a 2 gigabyte hard drive (112). Typical memory configurations for the application-server personal computer (120) used with the present invention should include at least 64 megabytes of semiconductor random access memory (121) and at least a 50 gigabyte hard drive (122). Typical memory configurations for the database-server personal computer (130) used with the present invention should include at least 128 megabytes of semiconductor random access memory (135) and at least a 200 gigabyte hard drive (131).
  • Using the system described above, the value of the enterprise will be further broken down into tangible and intangible elements of value. As shown in Table 1, the value of the current-operation will be calculated using an income valuation model. An integral part of most income valuation models is the calculation of the present value of the expected cash flows, income or profits associated with the current-operation. The present value of a stream of cash flows is calculated by discounting the cash flows at a rate that reflects the risk associated with realizing the cash flow. For example, the present value (PV) of a cash flow of ten dollars ($10) per year for five (5) years would vary depending on the rate used for discounting future cash flows as shown below.
  • Discount rate = 25 % _ PV = 10 1.25 + 10 ( 1.25 ) 2 + 10 ( 1.25 ) 3 + 10 ( 1.25 ) 4 + 10 ( 1.25 ) 5 = 26.89 Discount rate = 35 % _ PV = 10 1.35 + 10 ( 1.35 ) 2 + 10 ( 1.35 ) 3 + 10 ( 1.35 ) 4 + 10 ( 1.35 ) 5 = 22.20
  • The first step in evaluating the elements of current-operation value is separating the underlying formula that defines the value of the current-operation as shown in Table 3.
  • TABLE 3
    Value of current-operation =
    (R) Value of expected revenue from current-operation +
    (E) Value of expected expense for current-operation +
    (C) Value of capital required to support current-operation*
    *Note: (C) can have a positive or negative value
  • The three components of current-operation value will be referred to as the revenue value (R), the expense value (E) and the capital value (C). Examination of the equation in Table 3 shows that there are three ways to increase the value of the current-operation—increase the revenue, decrease the expense or decrease the capital requirements (note: this statement ignores a fourth way to increase value—decrease interest rate used for discounting future cash flows).
  • While it is possible to break each component down into a large number of sub-components for analysis, the preferred embodiment has a pre-determined number of sub-components for each component of value. The revenue value is not subdivided. The expense value is subdivided into five sub-components: the cost of raw materials, the cost of manufacture or delivery of service, the cost of selling, the cost of support and the cost of administration. The capital value is subdivided into six sub-components: cash, non-cash financial assets, production equipment, other assets (non financial, non production assets), financial liabilities and equity. The production equipment and equity sub-components are not used directly in evaluating the elements of value.
  • The components and sub-components of current-operation value will be used in calculating the value of the tangible and intangible elements of value. For the calculations completed by the present invention, an element of value will be defined as “an identifiable entity or group that as a result of past transactions has provided and is expected to provide economic benefit to the enterprise.” An item will be defined as a single member of the group that defines an element of value. For example, an individual salesman would be an “item” in the “element of value” sales staff. Predictive models are used to determine the percentage of: the revenue value, the expense value sub-components, and the capital value sub-components that are attributable to each element of value. The resulting values will then be added together to determine the valuation for different elements as shown by the example in Table 4.
  • TABLE 4
    Valuation of the Large, Loyal Customer Element
    Revenue value = $120M 13% attributed to large, Value = $15.6 M
    loyal customers
    Expense value = ($80M) 10% attributed to large, Value = ($8) M
    loyal customers
    Capital value = ($5M) 12% attributed to large, Value = ($.6) M
    loyal customers
    Total value = $35M Large, Loyal Customer Element Value = $ 7 M
  • The valuation of an enterprise using the approach outlined above is completed in seven distinct stages. The first stage of processing (block 200 from FIG. 1) extracts, aggregates and stores the data from user input, existing internal databases (10, 15, 30, 35 or 40) and external databases (5) required for the calculation of enterprise business value as shown in FIG. 5A and FIG. 5B. The second stage of processing (block 300 from FIG. 1) identifies the item variables and item performance indicators that drive the components of value (revenue, expense and changes in capital) and calculates composite variables that characterize the performance of the elements of value, as shown in FIG. 6A FIG. 6B, FIG. 6C, FIG. 6D, FIG. 6E, FIG. 10 and FIG. 11. The third stage of system processing (block 400 from FIG. 1) values the growth options by enterprise using option pricing algorithms as shown in FIG. 7. The fourth stage of system processing (block 500 from FIG. 1) values the revenue, expense and capital components and calculates the current operation value using the information prepared in the previous stage of processing as shown in FIG. 8. The fifth stage of system processing (block 600 from FIG. 1) specifies and optimizes predictive models to determine the relationship between the value drivers and the revenue, expense and capital values as shown in FIG. 9A, FIG. 9B and FIG. 10. The sixth stage of processing (block 700 from FIG. 1) combines the results of the fourth and fifth stages of processing to determine the value of each element as shown in FIG. 12. The seventh and final stage of processing (block 800 from FIG. 1) determines the relationship between equity and calculated total value as shown in FIG. 13 and displays the results of the prior calculations in specified formats as shown in FIG. 14 and FIG. 15.
  • Extraction and Aggregation of Data
  • The flow diagrams in FIG. 5A and FIG. 5B detail the processing that is completed by the portion of the application software (200) that extracts, aggregates and stores the information required for system operation from: the basic financial system database (10), operation management system database (15), advanced financial system database (30), sales management system database (35), human resource information system database (40), external databases found on the internet (5) and the user (20). A brief overview of the different databases will be presented before reviewing each step of processing completed by this portion (200) of the application software.
  • Corporate financial software systems are generally divided into two categories, basic and advanced. Advanced financial systems utilize information from the basic financial systems to perform financial analysis, financial planning and financial reporting functions. Virtually every commercial enterprise uses some type of basic financial system as they are required to use these systems to maintain books and records for income tax purposes. An increasingly large percentage of these basic financial systems are resident in microcomputer and workstation systems. Basic financial systems include general-ledger accounting systems with associated accounts receivable, accounts payable, capital asset, inventory, invoicing, payroll and purchasing subsystems. These systems incorporate worksheets, files, tables and databases. These databases, tables and files contain information about the company operations and its related accounting transactions. As will be detailed below, these databases, tables and files are accessed by the application software of the present invention as required to extract the information required for completing a business valuation. The system is also capable of extracting the required information from a data warehouse (or datamart) when the required information has been pre-loaded into the warehouse.
  • General ledger accounting systems generally store only valid accounting transactions. As is well known, valid accounting transactions consist of a debit component and a credit component where the absolute value of the debit component is equal to the absolute value of the credit component. The debits and the credits are posted to the separate accounts maintained within the accounting system. Every basic accounting system has several different types of accounts. The effect that the posted debits and credits have on the different accounts depends on the account type as shown in Table 5.
  • TABLE 5
    Account Type: Debit Impact: Credit Impact:
    Asset Increase Decrease
    Revenue Decrease Increase
    Expense Increase Decrease
    Liability Decrease Increase
    Equity Decrease Increase
  • General ledger accounting systems also require that the asset account balances equal the sum of the liability account balances and equity account balances at all times.
  • The general ledger system generally maintains summary, dollar only transaction histories and balances for all accounts while the associated subsystems, accounts payable, accounts receivable, inventory, invoicing, payroll and purchasing, maintain more detailed historical transaction data and balances for their respective accounts. It is common practice for each subsystem to maintain the detailed information shown in Table 6 for each transaction.
  • TABLE 6
    Subsystem Detailed Information
    Accounts Vendor, Item(s), Transaction Date, Amount Owed, Due
    Payable Date, Account Number
    Accounts Customer, Transaction Date, Product Sold, Quantity,
    Receivable Price, Amount Due, Terms, Due Date, Account Number
    Capital Asset ID, Asset Type, Date of Purchase, Purchase Price,
    Asset Useful Life, Depreciation Schedule, Salvage Value
    Inventory Item Number, Transaction Date, Transaction Type,
    Transaction Qty, Location, Account Number
    Invoicing Customer Name, Transaction Date, Item(s) Sold, Amount
    Due, Due Date, Account Number
    Payroll Employee Name, Employee Title, Pay Frequency, Pay
    Rate, Account Number
    Purchasing Vendor, Item(s), Purchase Quantity, Purchase Price(s),
    Due Date, Account Number

    As is well known, the output from a general ledger system includes income statements, balance sheets and cash flow statements in well defined formats which assist management in measuring the financial performance of the firm during the prior periods when data input have been completed.
  • Advanced financial systems, including financial planning systems, generally use the same format used by basic financial systems in forecasting income statements, balance sheets and cash flow statements for future periods. Management uses the output from financial planning systems to highlight future financial difficulties with a lead time sufficient to permit effective corrective action and to identify problems in company operations that may be reducing the profitability of the business below desired levels. These systems are most often developed by individuals within companies using 2 and 3 dimensional spreadsheets such as Lotus 1-2-3®, Microsoft Excel® and Quattro Pro®. In some cases, financial planning systems are built within an executive information system (EIS) or decision support system (DSS). For the preferred embodiment of the present invention, the advanced financial system database is the financial planning system database detailed in U.S. Pat. No. 5,165,109 for “Method of and System for Generating Feasible, Profit Maximizing Requisition Sets”, by Jeff S. Eder, the disclosure of which is incorporated herein by reference.
  • While advanced financial systems are similar between firms, operation management systems vary widely depending on the type of company they are supporting. These systems typically have the ability to not only track historical transactions but to forecast future performance. For manufacturing firms, operation management systems such as Enterprise Requirements Planning Systems (ERP), Material Requirement Planning Systems (MRP), Purchasing Systems, Scheduling Systems and Quality Control Systems are used to monitor, coordinate, track and plan the transformation of materials and labor into products. These systems will generally track information about the performance of the different vendors that supply materials to the firm including the information shown in Table 7.
  • TABLE 7
    Operation Management System - Vendor Information
     1. Vendor Name
     2. Vendor Number
     3. Commodity Code(s)
     4. Year to date dollar volume
     5. Historical dollar volume
     6. Percentage of deliveries rejected by QC
     7. Percentage of deliveries accepted out of specification
     8. Compliance with ISO 9000
     9. Actual lead time required for purchases
    10. Terms and conditions for purchases
    11. Average Delivery Quantity Variance
    12. Average Delivery Date Variance
    13. EDI* vendor - Yes or No
    *EDI = Electronic Data Interchange
  • Systems similar to the one described above may also be useful for distributors to use in monitoring the flow of products from a manufacturer.
  • Operation Management Systems in manufacturing firms may also monitor information relating to the production rates and the performance of individual production workers, production lines, work centers, production teams and pieces of production equipment including the information shown in Table 8.
  • TABLE 8
    Operation Management System - Production Information
     1. ID number (employee id/machine id)
     2. Actual hours - last batch
     3. Standard hours - last batch
     4. Actual hours - year to date
     5. Actual/Standard hours - year to date %
     6. Actual setup time - last batch
     7. Standard setup time - last batch
     8. Actual setup hours - year to date
     9. Actual/Standard setup hrs - yr to date %
    10. Cumulative training time
    11. Job(s) certifications
    12. Actual scrap - last batch
    13. Scrap allowance - last batch
    14. Actual scrap/allowance - year to date
    15. Rework time/unit last batch
    16. Rework time/unit year to date
    17. QC rejection rate - batch
    18. QC rejection rate - year to date

    Operation management systems are also useful for tracking requests for service to repair equipment in the field or in a centralized repair facility. Such systems generally store information similar to that shown below in Table 9.
  • TABLE 9
    Operation Management System - Service Call Information
    1. Customer name
    2. Customer number
    3. Contract number
    4. Service call number
    5. Time call received
    6. Product(s) being fixed
    7. Serial number of equipment
    8. Name of person placing call
    9. Name of person accepting call
    10. Promised response time
    11. Promised type of response
    12. Time person dispatched to call
    13. Name of person handling call
    14. Time of arrival on site
    15. Time of repair completion
    16. Actual response type
    17. Part(s) replaced
    18. Part(s) repaired
    19. 2nd call required
    20. 2nd call number
  • Sales management systems are similar to operation management systems in that they vary considerably depending on the type of firm they are supporting and they generally have the ability to forecast future events as well as track historical occurrences. In firms that sell customized products, the sales management system is generally integrated with an estimating system that tracks the flow of estimates into quotations, orders and eventually bills of lading and invoices. In other firms that sell more standardized products, sales management systems generally are used to track the sales process from lead generation to lead qualification to sales call to proposal to acceptance (or rejection) and delivery. All sales management systems would be expected to store information similar to that shown below in Table 10.
  • TABLE 10
    Sales Management System - Information
    1. Customer/Potential customer name
    2. Customer number
    3. Address
    4. Phone number
    5. Source of lead
    6. Date of first purchase
    7. Date of last purchase
    8. Last sales call/contact
    9. Sales call history
    10. Sales contact history
    11. Sales history: product/qty/price
    12. Quotations: product/qty/price
    13. Custom product percentage
    14. Payment history
    15. Current A/R balance
    16. Average days to pay
  • Computer based human resource systems are increasingly used for storing and maintaining corporate records concerning active employees in sales, operations and the other functional specialties that exist within a modern corporation. Storing records in a centralized system facilitates timely, accurate reporting of overall manpower statistics to the corporate management groups and the various government agencies that require periodic updates. In some cases human resource systems include the company payroll system as a subsystem. In the preferred embodiment of the present invention, the payroll system is part of the basic financial system. These systems can also be used for detailed planning regarding future manpower requirements. Human resource systems typically incorporate worksheets, files, tables and databases that contain information about the current and future employees. As will be detailed below, these databases, tables and files are accessed by the application software of the present invention as required to extract the information required for completing a business valuation. It is common practice for human resource systems to store the information shown in Table 11 for each employee.
  • TABLE 11
    Human Resource System Information
    1. Employee name
    2. Job title
    3. Job code
    4. Rating
    5. Division
    6. Department
    7. Employee No./(Social Security Number)
    8. Year to date - hours paid
    9. Year to date - hours worked
    10. Employee start date - company
    11. Employee start date - department
    12. Employee start date - current job
    13. Training courses completed
    14. Cumulative training expenditures
    15. Salary history
    16. Current salary
    17. Educational background
    18. Current supervisor
  • External databases such as those found on the internet (5) can be used for obtaining information that enables the categorization and valuation of assets such as brand names, trademarks and service marks (hereinafter, referred to as brand names). In some cases it can also be used to supplement information obtained from the other databases (10, 15, 30, 35 and 40) that are used in categorizing and evaluating employee groups and other elements of value. In the system of the present invention, the retrieval of information from the internet (5) can be:
      • a) targeted to specific on-line publications that provide information relevant to the element being evaluated,
      • b) restricted to a simple count of the number of matches a specific trademark generates when entered into a general purpose internet search-engine such as Yahoo!, Lycos, AltaVista or HotBot, or WebCrawler, and
      • c) specific searches using commercially available software agents and/or text mining products to determine both the number and the type of references (favorable, unfavorable or information only) that have been made concerning a specific trademark in all discovered references.
  • System processing of the information from the different databases (5, 10, 15, 30, 35 and 40) described above starts in a block 201, FIG. 5A, which immediately passes processing to a software block 202. The software in block 202 prompts the user via the system settings data window (901) to provide system setting information. The system setting information entered by the user (20) is transmitted via the interconnection network (25) back to the application server (120) where it is stored in the system settings table (140) in the application database (50) in a manner that is well known. The specific inputs the user (20) is asked to provide at this point in processing are shown in Table 12.
  • TABLE 12
    System Settings
    1. Mode of operation - stand-alone valuation or comparison to previous
    valuation
    2. Date of business valuation calculation (valuation date)
    3. Date of previous valuation (if any)
    4. Location (address) of basic financial system data dictionary and data
    5. Location (address) of advanced financial system data dictionary and
    data
    6. Location (address) of human resource information system data
    dictionary and data
    7. Location (address) of operation management system data dictionary
    and data
    8. Location (address) of sales management system data dictionary and
    data
    9. Location (address) of any external databases used in the valuation
    calculation
    10. The maximum acceptable age of a valuation (in days)
    11. The maximum number of generations to be processed without
    improving fitness
    12. Base currency
    13. Currency conversions for any non-base currencies used in the
    financial systems
    14. Weighted average cost of capital (to be used in discounting cash
    flows)
    15. Simplified analysis (no sub-components of expense or capital value)
    16. Number of months a product is considered new after it is first
    produced
    17. Define composite variables? (Yes or No)
    18. Amount of cash and marketable securities required for day to day
    operations
  • The application of these system settings will be explained as part of the detailed explanation of the system operation.
  • The software in block 202 uses the valuation date specified by the user (20) to determine the time periods (months) that require data in order to complete the valuation of the current operation and the growth options and stores the resulting date range in the system settings table (140). The valuation of the current operation by the system requires sales, operation, finance, external database and human resource data for the three year period before and the four year period after the specified valuation date. Because of the difficulties inherent in forecasting from the perspective of the past or the future, the specified valuation date is generally within a month of the current system date. After the storage of system setting data is complete, processing advances to a software block 203 where the data dictionaries from the basic financial system database (10), the operation management system database (15), the advanced financial system database (30), the sales management system database (35) and the human resource information system database (40) are extracted and saved in the data dictionary table (149) in the application database (50) and processing advances to a software block 204.
  • The software in block 204 checks the system settings table (140) in the application database (50) to determine if the current calculation is a comparison to a prior valuation or if it is a stand-alone calculation. If the calculation involves a comparison with a prior valuation, then the software in block 204 retrieves the previously defined account structure, data definitions, enterprise definitions and component definitions and saves them in the appropriate tables for use in the current calculation before processing advances to a software block 209. Alternatively, if the calculation is a stand-alone, then processing advances to a software block 205.
  • The software in block 205 interacts with an account structure and data dictionary data window (902) that prompts the user for any input that is required to define data fields for the extracted data dictionaries and the data dictionary of the application software of the present invention. This input is also saved to the data dictionary table (149). The software in block 205 also prompts the user (20) via the account structure and data dictionary data window (902) for information that edits or defines the account structure used in the financial system databases. It is common practice for account numbers to have several segments where each segment represents a different set of subgroups as shown below in Table 13.
  • TABLE 13
    Account Number
    01- 800- 901- 677- 003
    Segment Company Division Department Account Sub-
    account
    Subgroup Products Workstation Marketing Labor P.R.
    Position 5 4 3 2 1
  • As will be detailed below, the different account number segments are used for separating the financial information for analysis.
  • After the account structure information is stored in the account number structure table (147) in the application database (50), processing advances to a block 206 where the software in the block interacts with an enterprise definition data window (903) to prompt the user (20) to specify the account number segment or segments that will be used to define the enterprise being valued by the innovative system of the present invention. For example, the user (20) could specify that each division is to be analyzed as a separate enterprise. In this case, if the total company had two business units with six divisions, then the user could specify up to six enterprises as shown in Table 14.
  • TABLE 14
    Products Business Unit Software Business Unit
    1. PC Division 5. Application Software Division
    2. Workstation Division 6. Operating System Software Division
    3. Mainframe Division
    4. Peripherals Division
  • The specified enterprises are then displayed to the user (20) by the software in block 206 via the enterprise definition data window (903). At this point, the user (20) is given the option of combining the enterprises or leaving them in the initial configuration. For example, the user (20) could combine the Personal Computer Product enterprise and the Workstation Product enterprise into one enterprise for the business valuation calculation. When the user (20) indicates that all enterprises have been defined, the resulting specifications are stored in the enterprise definition table (155) in the application database (50).
  • After the enterprise definitions are stored, processing advances to a software block 207 where the software in the block prompts the user (20) via a component definition data window (904) to specify the account segment or segments that will be used to define the expense and capital sub-components for each enterprise. Only account segments with position numbers below those of the segment used for enterprise specification can be used for expense and capital sub-component specification. Continuing the example shown above for a valuation calculation, departments, accounts and sub-accounts are the only segments that can be utilized for expense or capital component and sub-component specification. This limitation is applicable because their position numbers 3, 2 and 1 respectively are below 4, the position number of the division segment that was the lowest position used to define the enterprise. As discussed previously, there is only one revenue component per enterprise; therefore, the enterprise definition automatically defines the revenue component.
  • For the normal analysis, each enterprise has: one revenue component, five expense sub-components (cost of raw materials, the cost of manufacture or delivery of service, the cost of sales, the cost of support and other costs), four capital sub-components used in the valuation calculation (cash, non-cash financial assets, other (non-financial, non-production) assets, liabilities), and two capital sub-components that are not used directly in the valuation calculation (production equipment and equity). The software in block 207 via the component definition data window (904) will accept all logical combinations of account number segment specifications for a sub-component while preventing the reuse of the same segment for more than one sub-component specification in each enterprise. Sub-component definitions are required even if the user (20) has chosen to run a simplified analysis (i.e., one without sub-components). Table 15 provides examples of expense and capital sub-component definitions.
  • TABLE 15
    Sub-component Definition
    Expense: Cost of materials Departments 10-18, accounts 500 to 505
    Expense: Cost of manufacturing Departments 10-18, accounts 506 to 999
    Expense: Cost of sales Department 21, accounts 500 to 999
    Capital: Cash Account 100, all departments
    Capital: Liabilities Accounts 200-299, all departments
  • The software in block 207 saves the new or updated revenue component definitions to the revenue component definition table (150), expense sub-component definitions to the expense component definition table (151) and capital sub-component definitions to the capital component definition table (152). The production equipment and other asset definitions are also used to populate the physical asset ID table (145) and the asset liquidation price table (146) with the names of all assets used by all enterprises.
  • After the definitions for the revenue, expense and capital components have been stored in the application database (50), processing advances to a software block 209. Processing can also advance to block 209 directly from block 204 if the calculation is a comparison to a prior valuation. The software in block 209 checks to determine if all the available financial data have been included in a revenue, expense, or capital component or sub-component. In the example shown above, block 209 would check to determine that the financial data for all divisions, departments, account numbers and sub-account numbers have been assigned to a component. If the software in block 209 determines that all financial data have been assigned to a component, then processing advances to a software block 210. Alternatively, if the software in block 209 determines that some financial data have not been assigned to a component, then processing advances to a software block 208. The software in block 208 prompts an edit component definition data window (905) to display a screen that provides the user (20) with the ability to redefine previously stored component and sub-component definitions to include the unassigned financial data. The revised component definition(s) are then saved in the appropriate definition table(s) (150, 151 or 152) in the application database (50) and processing returns to block 209 and from there to software block 210.
  • The software in block 210 retrieves the debit or credit balances from the basic financial system database (10) and the advanced financial system database (30) in account segment position order, lowest position to highest position, for the revenue, expense and capital components for the time periods determined by the software in block 202 and stored in the system settings table (140). Continuing the example, the software in block 210 would first retrieve and total debits and credits in each required period for the sub-components that have sub-account specifications. The higher level specifications, account number, department and division, are observed when data are retrieved for the sub-components with sub-account specifications. The software in block 210 would then retrieve the required data for the sub-components with account number specifications. The higher level specifications, department and division, are observed when data are retrieved for the sub-components with account number specifications. The software in block 210 would finally retrieve the required data for the sub-components with department number specifications. The higher level specification, division, is observed when data are retrieved for these sub-components. This same procedure is completed for each enterprise and the resulting totals are then saved in the appropriate data tables (141-revenue, 142-expense and 143-capital) in the application database (50).
  • After all the financial data have been extracted and stored in the application database (50), system processing advances to a software block 212. The software in block 212 determines if any of the components or sub-components are missing data for any of the required periods. Missing data is defined as the condition when there is a null value for a sub-component financial data field in a required period. If the software in block 212 determines that all components have the required data in all periods, then processing advances directly to a software block 221. Alternatively, if data are missing, then processing advances to a software block 213 where the user (20) is prompted by a missing financial data window (906) to provide the missing data or the location of the missing data. In some cases the user (20) may simply replace the null value with a zero. After the user (20) provides the missing data or the location of the missing data, the appropriate data tables (141-revenue, 142-expense and/or 143-capital) in the application database (50) are updated and processing advances to software block 221.
  • The next step in system processing is completed by software block 221 where the software in the block prompts the user (20) via an element of value specification data window (907) to define the elements of value for each enterprise, to indicate the maximum number of sub-elements for each element and to identify the identity and location of transaction data and other information that are related to each element of value. Elements of value with sample specifications are shown below in Table 16.
  • TABLE 16
    Element of Value: Maximum
    Name/ Sub Element of Value Data
    Definition Elements Identity and Location
    Customers/ 10 Account payment data (10); Communications
    Customer numbers history (15), Date of first order (35); Order history -
    1-21,877 line items, products/services, revenue, returns,
    delivery (10 & 35); Invoice adjustment history (10 &
    35), Service call history - first time and repeat (15);
    Technical support call history - first time and repeat
    (15).
    Employees Production/  0 Date of first employment (40), Employee
    Job codes: suggestion history (15); Employee training data
    17, 18, 19 and 33 (40); Employee production data - hours, piece
    quantity (15); Employee pay data including benefits
    (10, 30 & 40).
    Brand names/  50* Monthly average price premium/(discount) vs.
    Name(s) industry average price (35), Monthly number of
    favorable mentions in trade press (5), Monthly
    number of hits on corporate web site (5), Monthly
    spending on advertising (10), Monthly average cost
    per 1,000 for advertising (10).
    *Default system limit

    The information entered by the user (20) defining the elements of value is stored in the element of value definition table (153), the location of the element of value data is stored in the composite variable location table (167), and an index of the element of value data is stored in the composite variable data table (168) in the application database (50), before processing advances to a software block 222.
  • The software in block 222 prompts the user (20) via a growth option definition data window (908) to specify the growth options that will be valued for each enterprise. The specification of each growth option includes: an option name; the financial resources consumed or generated by the growth option by component of value; the resources associated with the growth option by element of value, and the number of scenarios that will be analyzed as part of the growth option valuation. A growth option specification example is shown below in Table 17.
  • TABLE 17
    Growth Option Example Specification
    Option name VRML Equipment
    Revenue Component None
    Expense Sub-Component: Department 17, accounts 500 to 505,
    Raw Materials after 6/97
    Expense Sub-Component: All expenses, department 87
    Other
    Capital Sub-Component: All assets, department 87
    Other Assets
    Element of Value: All employees, department 87
    Other Employees

    If the system (100) is calculating a business valuation comparison, then the input from the user (20) regarding growth options is limited to defining new growth options. After the user's input is stored in the growth option definition table (175) in the application database (50), processing advances to a software block 223. The software in block 223 retrieves data from the different databases in accordance with the specifications provided by the user(20) in the previous two steps. After this information is stored in the application database (50) processing advances to a software block 225.
  • The software in block 225 prompts the user (20) via a tax information data window (910) to provide an overall tax rate for the company and detailed schedules for federal income taxes plus any other taxes as shown in Table 18.
  • TABLE 18
    Tax Example Schedule
    Federal Income Tax 15% of first $250,000 in profit
    25% of next $500,000 in profit
    35% of profit over $750,000
    State Tax 2.25% of revenue
    Overall Tax Rate 33% of GAAP operating profit

    After the information the user (20) provides is stored in the tax data table (173) in the application database (50), processing advances to a software block 226. The software in block 226 prompts the user (20) via an equity information data window (911) to provide historical and forecast (Fcst) information for each account included in the equity sub-component specification stored in the capital component definition table (152) as shown in Table 19.
  • TABLE 19
    Actual/
    Equity Account Example Schedule Fcst
    301 - Preferred stock 100,000 shares @ $40/ A
    share Sep. 1, 1987 with yield 5%
    250,000 shares @ $90/ F
    share Mar. 31, 1998 with yield 8%
    302 - Common Stock 1,000,000 shares @ $20/ A
    share on valuation date
    Price history for last 5 years A
    303 - Dividends Actual dividends last 5 years A
  • After the information the user (20) provides is stored in the equity data table (144) in the application database (50), processing advances to a software block 227.
  • The software in block 227 prompts the user (20) via a liability information data window (912) to provide historical and forecast information concerning each account included in the financial liability sub-component stored in the capital component definition table (152) as shown in Table 20.
  • TABLE 20
    Actual/
    Liability Account Example Schedule Fcst
    201 - Accounts NA
    Payable
    203 - Accrued Salary NA
    205 - Short Term Debt $150,000 @ 12% annual, Dec. 31, 1991 A
    $250,000 @ 11.7% annual, A
    Mar. 17, 1993
    $250,000 @ 11% annual, Jun. 30, 1999 F
    215 - Lon Term Debt $2,500,000 @ 8.5% annual, A
    Sep. 1, 1993
  • After the information the user (20) provides is stored in the debt data table (174) in the application database (50), processing advances to a software block 228.
  • The software in block 228 calculates the current weighted average cost of capital using the information stored in the debt and equity tables (174 and 144, respectively) using Formula 1 shown below.

  • Weighted average cost of capital=((D/VR D)(1−T)+(E/V×R E)   Formula 1
  • Where:
    • D=Value of Debt, E=Value of Equity, RD=Weighted Average Interest Rate of Debt, T=Tax Rate,
    • RE=Rate of Return on Equity (based on historical information provided) and V=(D+E)
      After the calculation is completed, processing advances to a software block 229. The software in block 229 compares the calculated value to the value previously specified by the user (20) in the system settings table (140). If the two values are different, then processing advances to a software block 230 which prompts the user via a cost of capital selection data window (913) to select the cost of capital figure to use for future calculations. The cost of capital specified by the user (20) is stored in the system settings table (140) and processing returns to block 229 and on to a software block 232. System processing passes directly to block 232 if the calculated and specified values of the cost of capital are identical.
  • The software in block 232 checks the asset liquidation price table (146) to determine if there are “current” (as defined previously) liquidation prices for all physical assets listed in the physical asset ID table (145). If there are “current” prices for all physical assets listed in the physical asset ID table (145), then processing advances to a software block 302 where the identification of the value drivers begins. If, on the other hand, there are not “current” prices for all physical assets, then processing advances to a software block 235. The software in block 235 prompts the user (20) via a liquidation price entry data window (914) to provide liquidation prices for all physical assets that don't have “current” values. The user (20) is given the option of specifying a liquidation value as a fixed price, as a percentage of original purchase price or as a percentage of book value (as stored in the basic financial system database (10)). After the required information has been entered by the user (20) and stored in the asset liquidation price table (146) in the application database (50), system processing advances to a software block 302.
  • Identify Value Drivers by Element
  • The flow diagrams in FIG. 6A, FIG. 6B, FIG. 6C, FIG. 6D and FIG. 6E detail the processing that is completed by the portion of the application software (300) that identifies the item variables and item performance indicators that drive revenue, expense and changes in capital by element for all defined enterprises. The item variables and item performance indicators identified during this processing are collectively referred to as “value drivers”.
  • Processing begins in software block 302. The software in block 302 checks the composite variable table (156) and the revenue driver table (179) in the application database (50) to determine if all enterprise revenue components have “current” drivers and composite variables for all elements. If all enterprise revenue components have “current” drivers for all elements, then processing advances to a software block 306. Alternatively, if there are any revenue components without “current” drivers for at least one element, then processing advances to a software block 303. The software in block 303 uses the element of value definition table (153) and excluded variables table (182) to guide the retrieval of information required to specify the next revenue driver model that is being updated. All information related to the enterprise element being examined less any information identified in the excluded variable table (182) is retrieved by block 303 from the primary databases including: the basic financial system database (10), the operation management system database (15), the advanced financial system database (30), the sales management system database (35), the human resource information system database (40), and external databases found on the internet (5) by item. For example, if the element being modeled was the customer element that was defined by the customer numbers in the range from 1 to 21,877, then all numeric and date fields in data records containing a customer number, save those listed in the excluded variable table (182), would be retrieved and stored in the revenue driver table (179) by item. The numeric and date field data are collectively referred to as “item variables”. When all item variables have been stored in the revenue driver table (179), processing advances to a software block 304.
  • The software in block 304 calculates expressions by item for each numeric data field including: cumulative total value, the period to period rate of change in value, the rolling average value and the time lagged value of each numeric item variable. In a similar fashion the software in block 304 calculates expressions for each date field including time since last occurrence, cumulative time since first occurrence, average frequency of occurrence and the rolling average frequency of occurrence. The numbers calculated from numeric and date fields are collectively referred to as “item performance indicators”. After the item performance indicators are calculated and stored in the revenue driver table (179) in the application database (50), processing advances to a software block 305.
  • The software in block 305 creates a predictive time series neural net model for the revenue driver. More specifically, the software in the block creates a neural network model that relates the item variables and item performance indicators for a given enterprise to the revenue component. Neural networks are increasingly being used for statistically modeling the relationships between sets of data. One of the main reasons for the increase in their use is that they are effective in modeling relationships even when there are nonlinear relationships and interactions between independent variables. Neural networks consist of a number of processing elements (hereinafter, referred to as nodes) that send data to one another via connections. The strengths of the connections between the nodes are referred to as weights. As shown in FIG. 10, there are three types of nodes, input nodes (710-x), hidden nodes (720-x) and output nodes (730). Input nodes receive data values from input variables (701). A threshold node (710-THRESH) is a special class of input node (710-x) with a constant weight of 1 on the connection to a hidden node (720-x). Hidden nodes (720-x) create intermediate representations of the relationship between input data and the output values. It is important to note that while the diagram in FIG. 10 shows only one layer of hidden nodes (703), in many cases a network model will contain several layers of hidden nodes. Finally, output nodes (730) produce output variables (705).
  • The action of a neural network is determined by two things: the architecture, that is how many input, hidden and output nodes it has; and the values of the weights. A neural network “learns” by modifying its weights (706 and 707) to minimize the difference between the calculated output value (705) and the actual output value. The difference between the calculated output value and the actual output value is defined as the error function for the network. For revenue components such as those specified by the software in block 305, the error function is defined by Formula 2.
  • ERR ( W ) k = 1 / 2 ( R k - Y ( W ) ) 2 _ Where: W = a set of weight values ERR ( W ) k = error function for W for period k R k = actual / forecast revenue for period k Y ( W ) = output value for W Formula 2
  • The process for minimizing the error function will be detailed after the specification of the network architecture is explained.
  • The software in block 305 determines the number of the input nodes and hidden nodes for each network as a function of the number of item variables and item performance indicators specified by the software in blocks 303 and 304. There are also additional input nodes for prior period revenue and for a threshold node. For the system of the present invention, the number of hidden nodes is derived by adding one (1) to the number of input nodes. Table 21 shows the calculation of the number of nodes in an example predictive revenue model.
  • TABLE 21
    Potential Value Drivers - Element to Revenue Model by Item Quantity
    Item Variables 6
    Item Performance Indicators 48
    Subtotal Input Nodes: 54
    Threshold & Prior Period Nodes 2
    Total Input Nodes: 56
    Hidden Node Adder 1
    Total Hidden Nodes: 57

    The software in block 305 sets the initial number of hidden layers to one. The software in block 305 also establishes one output node for the revenue and sets all weights to random numbers between 0 and 1 (except the threshold node weight which is fixed at 1).
  • The processing completed by all of the network nodes (710-x, 720-x and 730) is similar. The input nodes (710-x) receive their input of item variables and item performance indicators by item by period while the hidden node (720-x) receives its input from the input nodes and the output nodes (730-x) receive their input from the hidden nodes. Each node multiplies the received input by the corresponding weight (706 or 707) to produce a weighted sum. The network applies a sigmoid or linear function to the weighted sum to determine the state of the node. The state of each node is then passed on to the next layer along a weighted connection or it is used to generate an output variable. When the network architecture including the nodes has been specified by the software in block 305, then processing advances to a software block 325 where network optimization begins.
  • The normal operation of a neural network requires the use of very large amounts of data to train the network to minimize the error function and then test the networks predictive capabilities. The preferred embodiment of the present invention minimizes the need for very large data sets by using genetic algorithms to find the weights (W) that reduce the error function to an acceptable level before optimizing the network using the backpropagation algorithm to determine the “best fit”. The software in a block 325 uses genetic algorithms to find solutions for the current error minimization problem by evolving a set of solutions toward the desired goal of having an error function value of zero. More specifically, the genetic algorithms in block 325 create and maintain a population of the software equivalent of DNA chromosomes (hereinafter, chromosomes) that “evolve” toward the specified goal by using selective crossover and random mutation to generate new chromosomes. For this application, the chromosomes (see Table 22 below) encode the network weights.
  • TABLE 22
    Figure US20080071588A1-20080320-C00001

    Each individual “gene” represents a weight between two sets of nodes. The fitness of each chromosome in the population is evaluated by the proximity of the resulting solution to the expected objective function maximum (the maximum of the objective function corresponds to the minimum error level of the neural network). Selective crossover in a genetic algorithm gives a preference to the chromosomes (sets of weights) that are the most fit (e.g., have lowest error and highest objective function outputs). Crossover is a form of reproduction that separates each of two individual chromosomes into two separate pieces at a random break point. Crossover is completed when the algorithm recombines the top piece from the first chromosome with the bottom piece of the second chromosome and the bottom piece from the first chromosome with the top piece from the second chromosome to produce two new chromosomes that have a mix of “genes” from each of the original chromosomes. Giving a preference to the most fit chromosomes increases the likelihood that the new chromosomes will produce more fit solutions than the precursor chromosomes. Mutation is the random change in the value of a randomly selected “gene”. Mutation occurs to “genes” during crossover. It also occurs in individual chromosomes within the population. When a population of chromosomes has been crossed over and mutated, a new generation of the population is created. The fitness of the chromosomes within the new population is evaluated and unless one of the chromosomes produces an acceptable solution (a solution where the error level is below the target), the process is repeated. Over time the selective crossover will increase the relative fitness of the population and decrease the difference between the best and worst chromosomes.
  • The evolutionary process is enhanced in the present invention using three separate mechanisms. First, the fitness measures for individual chromosomes are re-scaled before crossover by the software in block 325 whenever the difference between the fitness of the top 10% of population and the bottom 10% of the population is less than 5% of the expected solution. To accomplish this, the fitness of the chromosome(s) with the lowest fitness is arbitrarily changed to 10% of the target value and the fitness of the chromosome(s) with the highest fitness is set to 95% of the target value. The remaining chromosomes fitness values are adjusted accordingly. This adjustment has the effect of restoring the relative advantage that the fitter chromosomes have in being selected for crossover.
  • The second mechanism for speeding the evolutionary process is to pick only the fittest members of a population for inclusion in the next generation. For this procedure, the current generation is combined with the two preceding generations and the fittest third from the combined population is carried forward for crossover and mutation in the next generation by the software in block 325. Finally, the sensitivity of the solution to the inclusion of all “genes” is tested when the fitness of a chromosome reaches the target level or the fitness of the population fails to increase for the maximum number of successive generations specified by the user (see System Settings, Table 12). The highest level of fitness achieved is established as the new target and processing advances to a block 330 after the resulting genes are stored in the driver genes table (183). The software in block 330 creates parallel populations where the “genes” (weights) associated with one item variable or item-performance indicator are removed from each chromosome before processing advances to a software block 335.
  • The software in a block 335 repeats the evolution process using the parallel population with the highest initial average fitness. If the fitness level of a chromosome in the parallel populations equals or exceeds the target value after a minimum number of generations (equal to the user specified maximum—see System Settings, Table 12) or the fitness of the population fails to increase for the user specified maximum number of successive generations, then processing advances to a block 340. If the software in block 340 determines that a chromosome in the parallel population has reached a new target level, then the genes are stored in the driver genes table (183) and the processing returns to a block 330 where process of creating parallel populations by removing potential driver “genes” is repeated. The overall process of evolution and removal of item variables and item performance indicators continues in this manner until the new parallel populations fail to reach a new target level at which point processing is advanced to a software block 345.
  • The software in block 345 uses the three chromosomes that achieved the highest fitness to initialize three distinct induction algorithms or causal models. While the neural network software in blocks 325 and 335 is capable of determining which item variables and item performance indicators correlate most strongly with changes in revenue, their configuration does not provide for identification of the item variables and item performance indicators that are causing changes in revenue (i.e. the “value drivers”). The item variables and item performance indicators that didn't correlate strongly with changes in revenue were “pruned” during the evolution of the high fitness chromosomes. As a result, the chromosomes in the three most “fit” chromosomes contain the item variables and item performance indicators that correlate most strongly with revenue changes. Eliminating low correlation factors from the initial configuration of the induction algorithms increases their processing efficiency.
  • A brief description of the three algorithms initialized by the software in block 345 are presented below in Table 23.
  • TABLE 23
    Induction
    Algorithm Description
    Entropy Starting with nothing, add variables to composite variable
    Minimization formula as long as they increase the explainability of
    result
    LaGrange Algorithm designed to identify the behavior of dynamic
    systems uses linear regression of the time derivatives
    of the system variables.
    Path Essentially equivalent multiple linear regression that
    Analysis finds the least squares rule for more than one predictor
    variable.
  • In addition to identifying the value drivers, these algorithms produce formulas that summarize the performance of the element being examined in causing changes in revenue.
  • After the models are initialized by the software in block 345, processing passes to a software block 350. The software in block 350 sub-divides the item variable, item performance indicator and revenue data into ten (10) distinct subgroups before processing passes to a block 355. The software in block 355 uses a model selection algorithm to identify the induction algorithm that best fits the data for the element being examined. For the system of the present invention, a cross validation algorithm is used for model selection. The software in block 355 optimizes each of the induction algorithms using nine (9) of the ten (10) sets of data. As part of this processing, the duplication of the information related to each item is eliminated as only the strongest causal factor variables are included in the final solution. The resulting equation from each induction algorithm is then tested using the data from the remaining set to identify the causal model that produces the best fit for that set of test data. The equations produced by the induction algorithms will hereinafter be referred to as composite variables. This process is repeated ten (10) times which allows each subgroup to be used as the basis for validating model performance. The composite variables and value drivers from the induction algorithm that produced the best results are then saved in the composite variable table (156), composite variable data table (168) and revenue driver table (179) in the application database (50) and processing returns to a block 302.
  • If the software in block 302 determines that there are elements that still require new revenue value driver models, then the processing described in the preceding paragraphs is repeated. Alternatively, if the software in block 302 determines that there are “current” revenue value drivers for all elements in all enterprises, then processing advances to a software block 306. The software in block 306 checks the composite variable table (156) and the expense driver table (180) in the application database (50) to determine if all enterprise expense components have “current” drivers and composite variables for all elements. If all enterprise expense components have “current” drivers and composite variables for all elements, then processing advances to a software block 312. Alternatively, if there are expense components without “current” drivers or composite variables for at least one element, then processing advances to a software block 307. The software in block 307 uses the element of value definition table (153) and excluded variable table (182) to guide the retrieval of information required to specify the next expense driver model that is being updated. All information related to the enterprise element being examined less any information identified in the excluded variable table (182) is retrieved by block 307 from the primary databases including: the basic financial system database (10), the operation management system database (15), the advanced financial system database (30), the sales management system database (35), the human resource information system database (40), and external databases found on the internet (5) by item. When all item variables have been stored in the expense driver table (180), processing advances to a software block 308.
  • The software in block 308 calculates expressions by item for each numeric data field and each date field in manner identical to that described previously for software block 304. After the item performance indicators are calculated and stored in the expense driver table (180) in the application database (50), processing advances to a software block 309. The software in block 309 creates a predictive time series neural net model for the expense driver in a manner similar to that described previously for block 305. After the expense value driver predictive model has been specified, processing proceeds through blocks 325, 330, 335, 340, 345, 350 and 355 in a manner identical to that described above for the processing of the revenue value driver model before returning to block 306.
  • If the software in block 306 determines that there are elements that still require new expense value driver models, than the processing described in the preceding paragraphs is repeated. Alternatively, if the software in block 306 determines that there are “current” expense value drivers for all elements in all enterprises, then processing advances to a software block 312. The software in block 312 checks the composite variable table (156) and the capital driver table (181) in the application database (50) to determine if all enterprise capital components have “current” drivers and composite variables for all elements. If all enterprise capital components have “current” drivers and composite variables for all elements, then processing advances to a software block 375. Alternatively, if there are capital components without “current” drivers or composite variables for at least one element, then processing advances to a software block 313. The software in block 313 uses the element of value definition table (153) and excluded variables table (182) to guide the retrieval of information required to specify the next capital driver model that is being updated. All information related to the enterprise element being examined less any information identified in the excluded variable table (182) is retrieved by block 313 from the primary databases including: the basic financial system database (10), the operation management system database (15), the advanced financial system database (30), the sales management system database (35), the human resource information system database (40), and external databases found on the internet (5) by item. When all item variables have been stored in the capital driver table (181), processing advances to a software block 314.
  • The software in block 314 calculates expressions by item for each numeric data field and each date field in manner identical to that described previously for software blocks 304 and 308. After the item performance indicators are calculated and stored in the capital driver table (181) in the application database (50), processing advances to a software block 315. The software in block 315 creates a predictive time series neural net model for the capital driver in a manner similar to that described previously for block 305 and 309. After the capital value driver predictive model has been specified, processing proceeds through blocks 325, 330, 335, 340, 345, 350 and 355 in a manner identical to that described above for the processing of the expense and revenue value driver models before returning to block 312.
  • If the software in block 312 determines that there are elements that still require new capital value driver models, than the processing described in the preceding paragraphs is repeated. Alternatively, if the software in block 312 determines that there are “current” capital value drivers for all elements in all enterprises, then processing advances to a software block 317. The software in block 317 checks the element of value definition table (153) and sub-element definition table (154) to determine if the user (20) has specified that there will be sub-elements of value for any of the elements. If the user (20) has specified that there will be no sub-elements of value, then processing advances to a block 375 where the elements are checked for interaction. Alternatively, if there are elements of value with sub-elements, then processing advances to a software block 318. The software in block 318 checks the element of value definition table (153) to determine the number of elements that have sub-elements before advancing processing to a block 319.
  • The software in block 319 retrieves the element of value definition for the next element with defined sub-elements from the element of value definition table (153) before advancing processing to a block 321. The software in block 321 checks the sub-element definition table (154) to determine if the sub-elements assignments for all items within the element are “current”. If the sub-element assignments are “current”, then processing returns to block 318 which checks to see if all elements with sub-elements have been reviewed in the current cycle of processing. If the software in block 318 determines that all elements have been reviewed, then system processing advances to a software block 332. Alternatively, if there are elements still need to be reviewed, then processing returns to block 319 as described previously. If the software in block 319 determines that the sub-element assignments are not “current”, then processing advances to a block 326 where the sub-element assignments are completed.
  • The software in block 326 checks the system settings table (140) to determine if the calculation being completed is a stand-alone calculation or a comparison to a prior calculation. If the software in block 326 determines that the current calculation is not being used for a comparison, then the processing advances to a software block 322. The software in block 322 retrieves the value driver data by item for the element being analyzed from the composite variable data table (168) before creating a normalized set of value driver data for each item within the element of value being analyzed. The normalized value for each value driver data element for each item in each period is then calculated using Formula 3 shown below.
  • Normalized Value = Current value - MN ( MP - MN ) Formula 3
  • Where: MN=minimum positive or most negative data value for all element items
      • MP=maximum positive data value for all element items
        After the normalized data are saved in the normalized composite variable data table (169) in the application database (50), system processing advances to a software block 323. The software in block 323 uses an unsupervised “Kohonen” neural network that uses competitive learning to create a clustering scheme and segment the element of value. As shown in FIG. 11 a “Kohonen” network has only two layers—an input layer (712) and an output layer (713). The input layer (712) holds the input nodes (750-x) where the different inputs are sequentially entered. The input patterns are transmitted to an output layer (713) which has one node (760-x) for each possible output category. The input layer and the output layer are fully interconnected as shown in FIG. 11. The different variables are defined in Table 24.
  • TABLE 24
    Variable Definition
    P The number of items for the element. Equals the number of
    different patterns that will be presented to the network
    M The number of variables the in the composite variable for the
    element as well as the number of input nodes
    (750-1 through 750-M)
    N The maximum number of sub-elements for this element
    (default is 20) as well as the number of output nodes
    (760-1 through 760-N)
    ωij Represents the connection strength between unit j of the
    input layer (712) and unit i of the output layer (713)
    Xj Represents the input vector which is the normalized value of
    the “jth” item composite variables
    Vi Matching value - measures how closely the weights of a
    given node matches the input vector
  • “Kohonen” network processing begins when the software in block 323 initializes at random the weights (716) between the output layer (713) and the input layer (712) with small values. In the next step the system starts sequentially entering the normalized composite variable data from the normalized composite variable data table (169) into the input layer (712). The normalized value for each variable is entered into a different input node (750-x) and transmitted from there to the output layer (713). The nodes in the output layer (760-x) each compute their matching values (Vi) using Formula 4 shown below:

  • v I=Σ(ωij −x j)2   Formula 4
  • The matching value (Vi) essentially represents the distance between the vectors (ωi) and x. Therefore, the output node (760) with the lowest matching value is also the node that most closely matches the input vector. The unit that is closest to the input is declared the winner and its weight (ωij) along with the weights of the neighboring output nodes are updated. The change in weight for the winning node and its neighbors is calculated using Formula 5 shown below.

  • Δωij=α(x j−ωij)   Formula 5
  • where: α represents the learning rate (see Formula 6)
    The application of this formula diminishes the difference between the weights of the output nodes and the weights of the input vectors. Output nodes that are not neighbors of the winning node are not updated. The output nodes are updated after each input and over time the application of the formulas shown above will tend to create clusters of similar nodes.
  • The input vectors (data patterns) are cycled through the “Kohonen” network a pre-determined number of times which are referred to as epochs. The total number of epochs (T) will be set by the software to somewhere between 500 and 10,000 depending upon the number of composite sort variables used for the element. The neighborhood size, that is the quantity of adjacent nodes that are considered to be neighbors, is adjusted downward from its initial value of 75% of the value of N by one node at a time as the number of epochs increases from zero (0) to its maximum number (T). The learning rate (α) is determined by Formula 6 shown below.

  • α=0.2×(1−(T/10,000))   Formula 6
  • Once the Kohonen network processing has been completed for the specified number of epochs (T), the software in block 323 arbitrarily assigns a number to each output node (760-x). The software in block 323 then calculates the distance between the input vector (x) of each item and the weight in each output node (760-x) using Formula 4. The software in block 323 then assigns the number of the closest output node (760-x) to the item and stores the resulting information in the sub-element definition table (154) in the application database (50). The software in block 323 also stores the final value of all network weights in the sub-element weights table (157) in application database (50).
  • After the network weights and information assigning each item to a sub-element have been stored in the appropriate tables in the application database (50), processing returns to software block 318 and the process described above is repeated until all elements with sub-elements of value have been reviewed.
  • If the software in block 326 determines that the calculation being completed is a comparison to a prior valuation, then processing advances to a software block 327. The software in block 327 retrieves the sub-element weights from the previous calculation from the sub-element weights table (157) and reestablishes the prior sub-element assignments by using Formula 4 to determine the appropriate sub-element assignment for each item. When this processing has been completed, processing advances to a software block 328.
  • The software in block 328 checks the composite variable data table (168) to see if there are any new items for elements being analyzed. If there are no new items, then processing returns to block 318 as described previously. Alternatively, if the software in block 328 determines that there are new items, then processing advances to a software block 329.
  • The software in block 329 determines the appropriate sub-element assignment for each new item by calculating the normalized value of the input vector for each new item and using formula 4 to determine which output node (i.e., which sub-element from the previous calculation) each item should be assigned to. The inputs for these calculations are stored in the normalized composite variable data table (169) and the results are stored in the composite variable data table (168) in the application database before processing returns to block 318 as described previously.
  • When the software in block 318 determines that all elements have been reviewed, processing advances to block 332 as described previously. The software in block 332 checks the composite variable (156), revenue driver (179), expense driver (180) and capital driver (181) tables to determine if the value drivers and composite variables for all sub-elements are current. If they are current, then processing advances to a software block 375. Alternatively, if the sub-element drivers and composite variables are not current, then processing advances to a block 337.
  • The software in block 337 checks the revenue driver table (179) in the application database (50) to determine if all enterprise revenue sub-components have “current” drivers and composite variables for all elements. If all enterprise revenue sub-components have “current” drivers and composite variables for all elements, then processing advances to a software block 341. Alternatively, if there are any revenue components without “current” drivers for at least one element, then processing advances to a software block 338. The software in block 338 uses the sub-element definition table (154) and excluded variables table (182) to guide the retrieval of information required to specify the next revenue driver model that is being updated. All information related to the enterprise element being examined less any information identified in the excluded variable table (182) is retrieved by block 338 from the primary databases including: the basic financial system database (10), the operation management system database (15), the advanced financial system database (30), the sales management system database (35), the human resource information system database (40), and external databases found on the internet (5) by item. When all item variables have been stored in the revenue driver table (179), processing advances to a software block 339.
  • The software in block 339 calculates performance indicators by item for each date and numeric data field in a manner similar to that described for block 304. After the item performance indicators are calculated and stored in the revenue driver table (179) in the application database (50), processing advances to a software block 305. The software in block 305 creates a predictive time series neural net model for the revenue driver as described previously. After the revenue value driver predictive model has been specified, processing proceeds through blocks 325, 330, 335, 340, 345, 350 in a manner identical to that described previously for the processing of the revenue value driver model before advancing to a block 360.
  • The software in block 360 uses a model selection algorithm to identify the induction algorithm that best fits the data for the element being examined. For the system of the present invention, a cross validation algorithm is used for model selection. The software in block 360 optimizes each of the induction algorithms using nine (9) of the ten (10) sets of data. As part of this processing, the duplication of the information related to each item is eliminated as only the strongest causal factor variables are included in the final solution. The composite variable from each induction algorithm is then tested using the data from the remaining set to identify the causal model that produces the best fit for that set of test data. The previously calculated composite variable for the revenue element is also compared to the sub-element composite variables as part of this processing. This process is repeated ten (10) times which allows each subgroup to be used as the basis for validating model performance. The composite variable and value drivers that produced the best results are then saved in the composite variable table (156), composite variable data table (168) and revenue driver table (179) in the application database (50) and processing returns to a block 337.
  • If the software in block 337 determines that there are sub-elements that still require new revenue value driver models, then the processing described in the preceding paragraphs is repeated. Alternatively, if the software in block 337 determines that there are “current” revenue value drivers for all sub-elements in all enterprises, then processing advances to a software block 341. The software in block 341 checks the expense driver table (180) in the application database (50) to determine if all enterprise expense components have “current” drivers for all elements. If all enterprise expense components have “current” drivers for all sub-elements, then processing advances to a software block 352. Alternatively, if there are expense sub-components without “current” drivers for at least one element, then processing advances to a software block 342. The software in block 342 uses the sub-element definition table (154) and excluded variables table (182) to guide the retrieval of information required to specify the next expense driver model that is being updated. All information related to the enterprise sub-element being examined less any information identified in the excluded variable table (182) is retrieved by block 342 from the primary databases including: the basic financial system database (10), the operation management system database (15), the advanced financial system database (30), the sales management system database (35), the human resource information system database (40), and external databases found on the internet (5) by item. When all item variables have been stored in the expense driver table (180), processing advances to a software block 343.
  • The software in block 343 calculates expressions by item for each numeric data field and each date field in manner identical to that described previously for software block 339. After the item performance indicators are calculated and stored in the expense driver table (180) in the application database (50), processing advances to a software block 309. The software in block 309 creates a predictive time series neural net model for the expense driver as described previously. After the expense value driver predictive model has been specified, processing proceeds through blocks 325, 330, 335, 340, 345, 350 and 360 in a manner identical to that described above for the processing of the revenue value driver model before returning to block 341.
  • If the software in block 341 determines that there are sub-elements that still require new expense value driver models, then the processing described in the preceding paragraphs is repeated. Alternatively, if the software in block 341 determines that there are “current” expense value drivers for all sub-elements in all enterprises, then processing advances to a software block 352. The software in block 352 checks the capital driver table (181) in the application database (50) to determine if all enterprise capital components have “current” drivers for all elements. If all enterprise capital components have “current” drivers for all sub-elements, then processing advances to software block 375. Alternatively, if there are capital sub-components without “current” drivers for at least one element, then processing advances to a software block 353. The software in block 353 uses the sub-element definition table (154) and excluded variables table (182) to guide the retrieval of information required to specify the next capital driver model that is being updated. All information related to the enterprise sub-element being examined less any information identified in the excluded variable table (182) is retrieved by block 353 from the primary databases including: the basic financial system database (10), the operation management system database (15), the advanced financial system database (30), the sales management system database (35), the human resource information system database (40), and external databases found on the internet (5) by item. When all item variables have been stored in the capital driver table (181), processing advances to a software block 354.
  • The software in block 354 calculates expressions by item for each numeric data field and each date field in manner identical to that described previously for software blocks 339 and 343. After the item performance indicators are calculated and stored in the capital driver table (181) in the application database (50), processing advances to a software block 315. The software in block 315 creates a predictive time series neural net model for the capital driver as described previously. After the capital value driver predictive model has been specified, processing proceeds through blocks 325, 330, 335, 340, 345, 350 and 360 in a manner identical to that described above for the processing of the revenue value driver model before returning to block 352.
  • If the software in block 352 determines that there are sub-elements that still require new capital value driver models, then the processing described in the preceding paragraphs is repeated. Alternatively, if the software in block 352 determines that there are “current” capital value drivers for all sub-elements in all enterprises, then processing advances to software block 375.
  • The software in block 375 checks the value drivers to determine if there is any interaction between drivers for different elements. If interaction between element drivers is discovered, then processing advances to a block 402 where the valuation of growth options is started. Alternatively, if no interaction between element drivers is found, then system processing is completed in accordance with the specification of U.S. patent application Ser. No. 08/779,109.
  • Growth Option Valuation
  • The flow diagram in FIG. 7 details the processing that is completed by the portion of the application software (400) that calculates the value of the growth options for each enterprise. Processing begins in block 402 where the software in the block checks the growth option value table (178) to determine if there are “current” valuations for all defined growth options. If there are no defined growth options or no growth options that require a new valuation, then processing advances to a transfer block 403 and on to a block 501 where the components of value are analyzed.
  • If there are growth options that need a value calculation completed, then system processing advances to a software block 404 where the software in the block retrieves the previously stored data from the growth option definition table (175) for the next growth option and then advances processing to a block 405. The software in block 405 checks the growth option definition table information to determine if there are multiple scenarios for the growth option being analyzed. If there is only one scenario for the growth option being analyzed, then processing advances to a block 407. Alternatively, if there are multiple scenarios, then processing advances to a block 408.
  • The software in block 408 prompts the user (20) via the growth option scenario definition data window (916) to input or update: the number of scenarios, the name of the scenarios and the probability that each scenario will occur for the growth option being valued. The probability of each scenario is specified as a percentage. The sum of the scenario probabilities must equal 100% for each growth option. The user (20) is allowed to change the scenarios even if the system (100) is calculating a business valuation comparison as the comparison will be made at the growth option level not at the scenario level. The input from the user (20) is stored in the growth option definition table (175) in the application database (50) before processing advances to a block 409.
  • The software in block 409 checks the growth option scenario table (177) in the application database (50) to determine if there are “current” data for every scenario listed in the growth option definition table (175). If there are “current” data for all scenarios, then processing advances to block 407 where the value of the total deductions from revenue components, expense sub-components, capital sub-components and elements of value for the growth option are calculated. Alternatively, if some or all of the scenarios for the growth option being examined don't have “current” data, then processing advances to a block 410. The software in block 410 retrieves the information for the scenario from the growth option scenario table (177) and advances processing to a software block 411.
  • The software in block 411 generates a form that is displayed using a scenario revenue and expense data window (917) for the user (20) to complete. The form identifies the time periods that revenue and expense forecasts are required for the growth option scenario in accordance with the calculations previously completed by the application software and stored in the system settings table (140). The forecast information the user (20) provides is saved to the growth option scenario table (177) in the application database (50). If the scenario being examined is the first scenario for the growth option, then the user (20) is also asked to quantify any growth-option related expenses by account number that were incurred in prior periods. The user (20) is not asked to identify any prior period growth option revenue as a growth option is by definition a project that will lead to revenue at some date in the future. The information regarding prior period expenses is saved in expense data table (142) in the application database (50). The user (20) is also asked to identify the months where the prior expenses and/or the forecast revenue and the forecast expenses for the growth option scenario were included in the overall company totals. The users input regarding the overlapping periods for the scenario is saved in the growth option overlap table (176) in the application database (50) and processing advances to a software block 412.
  • The software in block 412 prompts the user (20) via a scenario capital data window (918) to edit or provide a forecast of the capital requirements for the scenario by month for the time periods required for growth option valuation in accordance with the calculations previously completed by the application software and stored in the system settings table (140). The forecast information the user (20) provides is saved to the growth option scenario table (177) in the application database (50). If the scenario being examined is the first scenario for the growth option, then the user (20) is also asked to quantify any growth-option related capital investments by account number that were present in prior periods. The information regarding prior period capital requirements is saved in the capital data table (143) in the application database (50). The user (20) is also asked to identify the months where the prior period actual and/or forecast capital requirements for the growth option scenario were included in the overall company totals. The users input regarding overlapping periods for the scenario is saved in the growth option overlap table (176) in the application database and processing advances to a software block 413.
  • The software in block 413 prompts the user (20) via a scenario element of value data window (919) to edit or provide a forecast of element of value usage by month for the time periods required for growth option valuation in accordance with the calculations previously completed by the application software. The forecast information the user (20) provides is saved to the growth option scenario table (177) in the application database (50). If the scenario being examined is the first scenario for the growth option, then the user (20) is also asked to identify any growth-option related element of value usage that occurred in prior periods. The information regarding prior period use of the elements of value is saved in the element of value data table (144). The user (20) is also asked to identify the months where the prior period and/or forecast element of value usage for the growth option were included in the overall company totals. The users input regarding overlapping periods is saved in the growth option overlap table (176) in the application database and processing returns to a software block 409.
  • If the software in block 409 determines that there are still scenarios that don't have “current” data, then the processing sequence described above is repeated until all scenarios have “current” data. When all scenarios for the growth option being analyzed have “current” data, processing advances to block 407. The software in block 407 calculates the total value of revenue, expense, capital and element of value deductions for each scenario. The software in block 407 also calculates the weighted average forecast of total growth option revenues, expenditures, capital and element of value deductions for each period by multiplying the forecast revenue, capital and element of value deductions for each scenario by the probability of that scenario realization. The totals for the growth option revenue, expense, capital, and element of value deductions are then saved in the appropriate data tables (141 through 146) in the application database (50). After the data have been stored, processing advances to a software block 406 where the value of the growth option is calculated using dynamic programming algorithms in a manner that is well known. The process described in the preceding paragraphs is repeated until all growth options have “current” valuations and processing advances to block 502 as described previously.
  • Analyze Components of Value
  • The flow diagram in FIG. 8 details the processing that is completed by the portion of the application software (500) that analyzes the components and sub-components of value. Processing begins in a software block 502. The software in block 502 checks the enterprise value table (170) in the application database (50) to determine if there are “current” valuations for all enterprises for the date for which the current valuation is being calculated. If there are “current” valuations for all enterprises, then processing advances to a software block 515 where the software in the block calculates the total company current operation value. However, if some or all of the enterprises don't have “current” valuations, then processing advances to a software block 503.
  • The software in block 503 retrieves the definition for the next enterprise that doesn't have a “current” valuation from the enterprise definition table (155) in the application database (50). Processing then advances to a software block 504. The software in block 504 checks the data from the revenue component definition table (150) for the revenue component of the enterprise being valued to determine if there is a “current” valuation for the component. If there is a “current” valuation for the revenue component, then processing advances to a software block 507 where the values of the expense component or expense sub-components for the enterprise are checked to determine if they are “current”. However, if the revenue component valuation isn't “current”, then processing advances to a software block 505. The software in block 505 retrieves the information for the revenue component from the revenue data table (141) and processing advances to a software block 506. In accordance with the present invention, the revenue component value is calculated for the specified date of valuation using Formula 7 shown below.
  • Formula 7

  • Value=Ff1/(1+K)+Ff2/(1+K)2+Ff3/(1+K)3+Ff4/(1+K)4+(Ff4×(1+g))/((K−g)×(1+K)4)
  • Where:
      • Ffx= Forecast revenue, expense or capital for year x after valuation date(from advanced financial system)
      • K= Cost of capital −% per year (from system settings)
      • g= Forecast growth rate to perpetuity −% per year (from advanced financial system)
    After the valuation of the revenue component is complete, the result is stored in the revenue component definition table (150) in the application database (50) and processing advances to a software block 507.
  • The software in block 507 checks the expense component definition table (151) in the application database (50) to determine if there are “current” valuations for all expense components or sub-components in the enterprise being valued. If the user (20) has previously stored information in the system settings table (140) specifying a “simplified” analysis, then the expense component values will be checked. Alternatively, if the user (20) has not selected a simplified analysis, then the expense sub-component values will be checked. If there are “current” valuations for the expense components or all sub-components, then processing advances to a block 510 where the values of the capital components for the company are checked to determine if they are “current”. However, if some or all of the expense components or sub-components don't have “current” valuations, then processing advances to a software block 508. The software in block 508 retrieves the information from the expense data table (142) for the expense component or the next expense sub-component that doesn't have a “current” valuation. Processing then advances to a software block 509. In accordance with the present invention the valuation of the expenses is calculated for the specified date of valuation using Formula 7. After the valuation of the expense component or expense sub-component has been completed, the results are stored in the expense component definition table (151) in application database (50) and processing returns to a software block 507. If there are still expense sub-components that don't have current valuations, then the processing described above is repeated for the next sub-component. Alternatively, if the expense component or all expense sub-components have current valuations, then processing advances to a software block 510.
  • The software in block 510 checks the capital component definition table (152) in the application database (50) to determine if there are “current” valuations for all capital components. If the user (20) has previously stored information in the system settings table (140) specifying a “simplified” analysis, then the capital component value for the enterprise will be checked. Alternatively, if the user (20) has not selected a simplified analysis, then the standard capital sub-components will be checked. If there are “current” valuations for all capital components, then processing advances to a software block 514 where the enterprise current operation value is calculated. If the valuation for the capital component or some of the capital sub-components is not “current”, then processing advances to a software block 511. The software in block 511 retrieves the information required for valuation of the next capital component or sub-component that doesn't have a “current” valuation from the capital data table (143) in the application database (50). Processing then advances to a software block 512. The software in block 512 calculates the value of the capital component or capital sub-component using Formula 7. After the valuation of the capital component or a capital sub-component is complete, the results are stored in the capital component definition table (152) in the application database (50) and system processing returns to block 510. If there are still capital sub-components that don't have current valuations, then the processing described above is repeated for the next sub-component. Alternatively, if the capital component or all capital sub-components have current valuations, then processing advances to a software block 514.
  • The software in block 514 calculates the current operation value of each enterprise by summing the previously calculated component and sub-component values as shown in Table 4. The calculated value for the enterprise current operation is stored in the enterprise value table (170) in the application database (50) and processing returns to block 502 which again checks the enterprise value table (170) in the application database (50) to determine if all enterprises have “current” values. If there are still enterprises without “current” values, then processing advances to block 503 and the processing described in the preceding paragraphs is repeated for another enterprise. Alternatively, if all the enterprises have “current” values, then processing transfers to a block 515 where the software in the block adds the enterprise values together to calculate the value of the current-operation for the total company. The total company current-operation value is stored in the enterprise value table (170) in the application database (50) and processing advances to a software block 602 where the predictive model specification and optimization is started.
  • Predictive Model Specification and Optimization
  • The flow diagrams in FIG. 9A and FIG. 9B detail the processing that is completed by the portion of the application software (600) that uses predictive models to determine the relationship between the value drivers and the revenue, expense and capital components of all defined enterprises. Processing begins in software block 602. The software in block 602 checks the revenue model weights table (159) in the application database (50) to determine if the revenue components for all enterprises have “current” models. If there are revenue components without “current” predictive models, then processing advances to a software block 603 where the information specifying the next revenue component is retrieved from the revenue component definition table (150) in the application database (50). After the revenue component definition has been retrieved, processing advances to a software block 604 where the software in the block creates a predictive time series neural net model for the revenue component. More specifically, the software in the block creates a neural network model that relates the value drivers for a given enterprise to the revenue component.
  • The software in block 604 determines the number of the input nodes and hidden nodes for the network as a function of the number of value drivers associated with the enterprise revenue component. There are also additional input nodes for prior period revenue and for a threshold node. The software in block 604 sets the initial number of hidden layers to one. The software in block 604 also establishes one output node for the revenue and sets all weights to random numbers between 0 and 1 (except the threshold node weight which is fixed at 1). The processing completed by the network nodes (710-x, 720-x and 730) was described previously. After the network architecture including the nodes has been specified by the software in block 604, processing advances through blocks 325, 330, 335 and 340 as described previously.
  • The process of evolving a preliminary solution continues until the new parallel populations fail to reach a new target level and processing is then advanced to a block 625. As part of this processing revenue model genes are stored in the expense model genes table (160) in a manner identical to that described previously for the storage of model genes. The software in block 625 uses the chromosome that achieved the highest fitness to initialize a feed-forward neural network. In a manner that is well known, the network is then trained by the software in a block 630 using a traditional backpropagation algorithm to further minimize the error function associated with the network. The resulting weights for the enterprise are then saved in the revenue model weights table (159) in the application database (50) and processing returns to a block 602.
  • If the software in block 602 determines that there are “current” revenue models for all enterprises, then processing advances to a software block 605. The software in block 605 checks the expense model weights table (161) in the application database (50) to determine if the expense component or all expense sub-components have “current” models. If the user (20) has previously stored information in the system settings table (140) specifying a “simplified” analysis, then the expense component model will be checked before processing advances to another block. Alternatively, if the user (20) has not selected a simplified analysis, then the expense sub-component models will be checked before processing advances to another block. In either case, processing will advance to block 607 if the expense models aren't “current” and to block 611 if they are “current”.
  • The software in block 607 retrieves the information specifying the expense component or the next expense sub-component from the expense component definition table (151) in the application database (50). After the required information is retrieved, processing advances to a block 608 where the predictive expense model is specified in a manner similar to that described previously for the predictive revenue model. From block 608, processing advances to blocks 325, 330, 335, 340, 625 and 630 where the genetic evolution of the fittest solution is completed in a manner similar to that described above for the predictive revenue model. As part of this processing expense model genes are stored in the expense model genes table (160) in a manner identical to that described previously for the storage of revenue model genes. If there are sub-components, then the process described above is repeated until all expense sub-components have “current” models. When all expense components or all expense sub-components have “current” models, processing advances to a software block 611.
  • The software in block 611 checks the capital model weights table (163) in the application database (50) to determine if the capital component or all capital sub-components have “current” models. If the user (20) has previously stored information in the system settings table (140) specifying a “simplified” analysis, then the capital component model will be checked before processing advances to another software block. Alternatively, if the user (20) has not selected a simplified analysis, then the standard capital sub-component models will be checked before processing advances to another software block 613. In either case, processing will advance to block 613 if the models aren't “current” and to block 772 if they are “current”.
  • The software in block 613 retrieves the information specifying the capital component or the next capital sub-component from the capital component definition table (152) in the application database (50). After the required information is retrieved, processing advances to a block 614 where the predictive capital model is specified in a manner similar to that described previously for the predictive revenue and expense models. From block 614, processing advances to blocks 325, 330, 335, 340, 625 and 630 where the genetic evolution of the fittest solution is completed in a manner similar to that described above for the predictive revenue and expense model. As part of this processing, capital model genes are stored in the capital model genes table (162) in a manner identical to that described previously for the storage of revenue and expense model genes. If there are sub-components, then the process described above is repeated until all capital sub-components have “current” models. When all capital components or all capital sub-components have “current” models, processing advances to a block 772 where valuations are calculated for the elements and sub-elements of value.
  • Value All Elements and Sub-Elements of Value
  • The flow diagram in FIG. 12 details the processing that is completed by the portion of the application software (700) that values all elements and sub-elements of current-operation value for all enterprises. Processing begins in software block 772. The software in block 772 checks the revenue component percentage table (164) in the application database (50) to determine if the revenue component models for all enterprises have “current” percentages. If there are revenue components without “current” percentages, then processing advances to a block 773 where the information specifying the next revenue component is retrieved from the revenue component definition table (150) and the revenue model weights table (159) in the application database (50).
  • After the revenue component information is retrieved, processing advances to a block 774 where relationships between the elements and sub-elements of value and the revenue component are determined. The software in block 774 uses the network weights (706 and 707) previously stored in the revenue model weights table (159) to segregate the hidden-layer (703) to output-layer (704) connection weights (707) for each hidden node (720-x) into the components associated with each input node (710-x). The portion of the output attributable to each input node is then determined by Formula 8 (shown below).
  • ( k = 1 k = m j = 1 j = n I jk × O k / j = 1 j = n I ik ) / k = 1 k = m j = 1 j = n I jk × O k Formula 8
  • Where
  • Ijk=Absolute value of the input weight (706) from input node j to hidden node k
  • Ok=Absolute value of output weight (707) from hidden node k
  • m=number of hidden nodes
  • n=number of input nodes
  • After Formula 8 is solved by the software in block 774, the portion of the revenue value attributable to each element or sub-element of value is calculated by adding together the percentages from all value drivers associated with each element or sub-element of value. The result of these calculations is then stored in the revenue component percentage table (164) in the application database (50). The portion of the revenue value that can't be attributed to an element or sub-element of value is generally the portion that is attributed to the prior period revenue. This portion of the value will be referred to as going concern revenue component. After the storage of the revenue component percentages has been completed, processing returns to block 772. The software in block 772 checks the application database (50) to determine if all revenue components have “current” model percentages. If there are still revenue components without “current” percentages, then the system repeats the processing described in the preceding paragraphs. Alternatively, if all of the revenue component models have “current” percentages, then processing advances to a software block 775.
  • The software in block 775 checks the expense component percentage table (165) in the application database (50) to determine if all expense component or sub-component models for all enterprises have “current” percentages. If the user (20) has previously stored information in the system settings table (140) specifying a “simplified” analysis, then the expense component percentages will be checked. Alternatively, if the user (20) has not selected a simplified analysis, then the expense sub-component percentages will be checked. If there are expense components or sub-components without “current” percentages, then processing advances to a software block 776 where the information specifying the next expense component or sub-component is retrieved from the expense component definition table (151) and the expense model weights table (161) in the application database (50). After the expense component or sub-component information is retrieved, processing advances to a software block 777 where the percentages of value for the expense component or sub-component are calculated in a manner identical to that described previously for revenue components. The portion of the expense value that can't be attributed to an element or sub-element of value is generally the portion that is attributed to the prior period expense. This portion of the value will be referred to as going concern expense component. After the storage of the percentages of the expense component or sub-component to the expense component percentage table (165) has been completed, processing returns to block 775. The software in block 775 checks the expense component percentage table (165) in the application database (50) to determine if all expense component or sub-component models have “current” percentages. If there are still expense component or sub-component models without “current” percentages, then the system repeats the processing described above. Alternatively, if all of the expense component or sub-component models have “current” percentages, then processing advances to a software block 778.
  • The software in block 778 checks the capital component percentage table (166) in the application database (50) to determine if all capital component or sub-component models for all enterprises have “current” percentages. If the user (20) has previously stored information in the system settings table (140) specifying a “simplified” analysis, then the capital component percentages will be checked. Alternatively, if the user (20) has not selected a simplified analysis, then the capital sub-component percentages will be checked. If there are capital component or sub-component models without “current” percentages, then processing advances to a software block 779 where the information specifying the next capital component or sub-component is retrieved from the capital component definition table (152) and the capital model weights table (163) in the application database (50). After the capital component or sub-component information is retrieved, processing advances to a software block 780 where the percentages of value for the capital component or sub-component are calculated in a manner identical to that described previously for revenue and expense components. The portion of the capital element or sub-element value that can't be attributed to an element or sub-element of value is generally the portion that is attributed to the prior period capital requirements. This portion of the value will be referred to as going concern capital value. After the storage of the percentages of the capital component or sub-component to the capital component percentage table (166) has been completed, processing returns to block 778. The software in block 778 checks the capital component percentage table (166) in the application database (50) to determine if all capital components or sub-components have “current” percentages. If there are still capital component or sub-component models without “current” percentages, then the system repeats the processing described above (779 and 780). Alternatively, if all of the capital components or sub-components have “current” percentages, then processing advances to a software block 781.
  • The software in block 781 combines all the revenue component, expense component or sub-component and capital component or sub-component values together to calculate the overall value for each element or sub-element of value by enterprise as shown in Table 4. As part of the processing in this block, the calculated value of production equipment element (or sub-elements) of value is compared to the liquidation value for the equipment in the element. The stored value for the element (or sub-elements) will be the higher of liquidation value or calculated value. After the calculations are completed, processing advances to a software block 782 where the residual going concern value is calculated using Formula 9.

  • Residual Going Concern Value=Total Current-Operation Value−Σ Financial Asset Values−Σ Elements of Value−ΣSub-Elements of Value   Formula 9
  • After the residual going concern value is calculated for each enterprise, the values calculated for each element and sub-element of value (including going concern value) by the software in blocks 781 and 782 are stored by enterprise in the enterprise value table (170) in the application database (50). System processing then advances to a software block 802 where the preparation of the management reports is started.
  • Display and Print Results
  • The flow diagram in FIG. 13 details the processing that is completed by the portion of the application software (800) that creates, displays and optionally prints financial management reports. The primary management report, the Value Map™ report, summarizes information about the elements and sub-elements of business value on the valuation date. If a comparison calculation has been completed, a Value Creation report can be generated to highlight changes in the elements and sub-elements of business value during the period between the prior valuation and the current valuation date.
  • System processing in this portion of the application software (800) begins in block 802. At this point in system processing, virtually all of the information required to produce the Value Map™ report has been calculated using the methods outlined in Table 1 as detailed in the preceding sections. As a result, the only computation that needs to be made is the calculation of economic equity. The software in block 802 retrieves the required information from the enterprise value table (170), debt data table (174) and equity data table (144) in the application database (50) and then calculates the economic equity for the business as a whole using Formula 10 (shown below).
  • Economic Equity = ( Current Operation Value ) + ( Growth Option Values ) - ( Current Liabilities ) - ( Current Dept ) - ( Book * Equity Value ) * calculated in accordance with GAAP Formula 10
  • An equity value for each enterprise is then calculated by dividing the combined book and economic equity as required to balance the Value Map™ report totals in accordance with Formula 11 (shown below).
  • Enterprise Equity = ( Enterprise Current Operation Value ) + ( Enterprise Growth Option Values ) - ( Current Enterprise Liabilities ) - ( Current Enterprise Debt ) where ( Enterprise Equity ) = Book * Equity + Economic Equity * calculated in accordance with GAAP Formula 11
  • After the economic equity value and the enterprise equity values are calculated and stored in the economic equity values table (171), a summary Value Map™ report (see FIG. 14 for format) for the entire company is created and stored in the reports table (172) and processing advances to a software block 803. The software in block 803 checks the system settings table (140) to determine if the current valuation is being compared to a previous valuation. If the current valuation is not being compared to a previous valuation, then processing advances to a software block 805. Alternatively, if the current valuation is being compared to a previously calculated valuation, then processing advances to a software block 804.
  • The software in block 804 calculates Value Creation Statements (see FIG. 15 for format) for each enterprise and for the business as a whole for the specified time period. After the Value Creation Statements are stored in the reports table (172) in the application database (50), processing advances to a software block 805. The software in block 805 displays the summary Value Map™ report to the user (20) via a report data window (909).
  • After displaying the summary Value Map™ report, system processing advances to a software block 806 where the user is prompted via a report selection data window (915) to designate additional reports for creation, display and/or printing. The report selection data window (915) also gives the user (20) the option of having a report created to analyze the relationship between the market value of the business and the calculated business value. The user (20) has the option of creating, displaying or printing the Value Map™ reports for the company as a whole and/or for any combination of the enterprises within the company. The user (20) can also choose to create, display or print a Value Creation Statement for the business as a whole and/or for any combination of enterprises if a comparison calculation were being made. The software in block 806 creates and displays all Value Map™ reports and Value Creation Statements requested by the user (20) via the report selection data window (915). After the user (20) has completed the review of displayed reports and the input regarding equity analysis and reports to print has been stored in the reports table (172), processing advances to a software block 807. The software in block 807 transfers processing to a software block 808 if the user (20) has chosen to have the relationship between market value and calculated business value examined. The software in block 808 compares the market value of the business to the calculated value by completing the Formula 12 for each complete valuation stored in the reports table (172).

  • ((ΣE×N)−D)=(Y×V)   Formula 12
  • Where:
      • E=Market price of equity for valuation date
      • N=Number of shares of equity outstanding on valuation date
      • D=Market value of debt on valuation date
      • Y=Market value/calculated business value ratio
      • V=Total calculated business value on the valuation date
    The average ratio of market value to calculated business value and the standard deviation of the ratio are then calculated using standard regression analysis methods and stored in the equity forecast table (148) in the application database.
  • If the date of the current valuation is more than 60 days after the current system date, then the software in block 808 will calculate a range for equity prices on the valuation date by combining the results of previous calculations of the relationship between equity value and calculated value with the forecast of future value that was just completed. The software will calculate the future equity value range using both the average ratio of total business value to total market value. The software in block 808 then prepares a report summarizing the results of the preceding calculations that is stored in the reports table (172) in the application database (50) and processing advances to a software block 809. If the user (20) elects not to complete the calculated valuation versus equity price analysis, then the software in block 807 advances processing directly to a software block 809.
  • The software in block 809 checks the reports tables (172) to determine if any reports have been designated for printing. If reports have been designated for printing, then processing advances to a block 810 which sends the designated reports to the printer (118). After the reports have been sent to the printer (118), processing advances to a software block 811 where processing stops. If no reports were designated for printing then processing advances directly from block 809 to 811 where processing stops.
  • Thus, the reader will see that the system and method described above transforms extracted transaction data and information into detailed valuations for specific elements of a business enterprise. The level of detail contained in the business valuations allows users of the system to monitor and manage efforts to improve the value of the business in a manner that is superior to that available to users of traditional accounting systems and business valuation reports. The user also has the option of examining the relationship between the calculated business value and the market price of equity for the business.
  • While the above description contains many specificity's, these should not be construed as limitations on the scope of the invention, but rather as an exemplification of one preferred embodiment thereof. Accordingly, the scope of the invention should be determined not by the embodiment illustrated, but by the appended claims and their legal equivalents.

Claims (84)

1-78. (canceled)
79. A computer based method of building predictive models from transaction data, comprising:
aggregating data from a plurality of transaction systems covering a series of time periods for one or more elements of value and one or more aspects of financial performance;
transforming said element of value data in accordance with one or more pre-programmed functions;
establishing a plurality of input nodes, a plurality of hidden nodes and an output node for a neural network model for each aspect of financial performance;
inputting the raw and transformed transaction data into each neural network model using a separate input node for untransformed transaction data and each pre-programmed transformation function by element of value for all time periods in the series;
training each neural network model using said inputs until an error function associated with an output value that corresponds to an aspect of financial performance is minimized; and
using one or more weights from the trained neural network models to identify a set of raw and transformed transaction data by element of value and output that will be used as an input to an element of value summary for each of one or more predictive models
normalizing each of the one or more sets of raw and transformed transaction data by element of value,
refining the sets of raw and transformed transaction data by element of value, creating a summary of the refined transaction data set for each element of value, and using the element of value summaries as inputs to a predictive model for each of the one or more aspects of enterprise financial performance
where the aspects of financial performance are selected from the group consisting of revenue, expense, capital change, cash flow and combinations thereof, and
where the predictive models of aspects of financial performance are useful for completing tasks selected from the group consisting of optimizing a current operation financial performance for a business, predicting an impact of one or more changes to a current operation financial performance, calculating a value for an element of value and combinations thereof.
80. The method of claim 79 where a plurality of input nodes is set equal to one plus the number of elements of value times one plus the number of pre-programmed functions used to transform transaction data.
81. The method of claim 79 where a plurality of hidden nodes is set equal to one plus the number of input nodes.
82. The method of claim 79, where an error function further comprises ERR(W)k=½(Rk−Y(W))2.
83. The method of claim 79 where a set of raw and transformed transaction data that will be used as an input to a predictive model further comprises a set of numbers.
84. The method of claim 79 where one or more predictive models further comprises one or more neural network models.
85. The method of claim 79 where training a neural network model further comprises using a genetic algorithm to complete the training where a population being analyzed is partitioned into a plurality of subpopulations, with each subpopulation being processed by a genetic algorithm independently of the others and where a migration mechanism produces a chromosome exchange between the subpopulations.
86. The method of claim 79 where training a neural network model further comprises using a back propagation algorithm to complete the training.
87. The method of claim 79 where one or more elements of value further comprise one or more elements of value selected from the group consisting of brands, customers, employees, partners, vendors and combinations thereof.
88. The method of claim 79 where a plurality of transaction systems comprise systems selected from the group consisting of advanced financial systems, basic financial systems, operation management systems, sales management systems, human resource systems, accounts receivable systems, accounts payable systems, capital asset systems, inventory systems, invoicing systems, payroll systems, purchasing systems, the Internet and combinations thereof.
89. The method of claim 79 where a series of time periods contains time periods selected from the group consisting of historical time periods, future time periods and combinations thereof.
90. The method of claim 79 where the one or more pre programmed functions are selected from the group consisting of average, rolling average, time delay, trend, average time delay, rolling average time delay, ratio, average ratio, rolling average ratio, slope, average slope, rolling average slope and combinations thereof.
91. The method of claim 79 where training a neural network model further comprises using a genetic algorithm to complete the training where a population being analyzed is partitioned into a plurality of subpopulations, with each subpopulation being processed by a genetic algorithm independently of the others and where a selective crossover and a fitness measure rescaling produces a chromosome exchange between the subpopulations.
92. A program storage device readable by a computer, tangibly embodying a program of instructions executable by at least one computer to perform the steps in method, comprising:
aggregating data from a plurality of transaction systems covering a series of time periods for one or more elements of value and one or more aspects of financial performance;
transforming said element of value data in accordance with one or more pre-programmed functions;
establishing a plurality of input nodes, a plurality of hidden nodes and an output node for a neural network model for each aspect of financial performance; inputting the raw and transformed transaction data into each neural network model using a separate input node for untransformed transaction data and each pre-programmed transformation function by element of value for all time periods in the series;
training each neural network model using said inputs until an error function associated with an output value that corresponds to an aspect of financial performance is minimized; and
using one or more weights from the trained neural network models to identify a set of raw and transformed transaction data by element of value and output that will be used as an element of value summary for use as an input to each of one or more predictive models
normalizing each of the one or more sets of raw and transformed transaction data by element of value, refining the sets of raw and transformed transaction data by element of value,
creating a summary of the refined transaction data set for each element of value, and
using the element of value summaries as inputs to a predictive model for each of the one or more aspects of enterprise financial performance
where the aspects of financial performance are selected from the group consisting of revenue, expense, capital change, cash flow and combinations thereof, and
where the predictive models of aspects of financial performance are useful for completing tasks selected from the group consisting of optimizing a current operation financial performance for a business, predicting an impact of one or more changes to a current operation financial performance, calculating a value for an element of value and combinations thereof.
93. The program storage device computer readable medium of claim 92 where a plurality of input nodes is set equal to one plus the number of elements of value times one plus the number of pre-programmed functions used to transform transaction data.
94. The program storage device of claim 92 where a plurality of hidden nodes is set equal to one plus the number of input nodes.
95. The program storage device of claim 92, where an error function further comprises ERR(W)k=½(Rk−Y(W))2.
96. The program storage device of claim 92 where a set of raw and transformed transaction data that will be used as an input to a predictive model further comprises a set of numbers.
97. The program storage device of claim 92 where one or more predictive models further comprises one or more neural network models.
98. The program storage device of claim 92 where training a neural network model further comprises using a genetic algorithm to complete the training where a population being analyzed is partitioned into a plurality of subpopulations, with each subpopulation being processed by a genetic algorithm independently of the others and where a migration mechanism produces a chromosome exchange between the subpopulations.
99. The program storage device of claim 92 where training a neural network model further comprises using a back propagation algorithm to complete the training.
100. The program storage device computer readable medium of claim 92 where one or more elements further comprise elements of value selected from the group consisting of brands, customers, employees, partners, vendors and combinations thereof.
101. The program storage device of claim 92 where a plurality of transaction systems comprise systems selected from the group consisting of advanced financial systems, basic financial systems, operation management systems, sales management systems, human resource systems, accounts receivable systems, accounts payable systems, capital asset systems, inventory systems, invoicing systems, payroll systems, purchasing systems, the Internet and combinations thereof.
102. The program storage device of claim 92 where a series of time periods contains time periods selected from the group consisting of historical time periods, future time periods and combinations thereof.
103. The program storage device of claim 92 where the one or more pre programmed functions are selected from the group consisting of average, rolling average, time delay, trend, average time delay, rolling average time delay, ratio, average ratio, rolling average ratio, slope, average slope, rolling average slope and combinations thereof.
104. The program storage device of claim 92 where the method further comprises: training a neural network by using a genetic algorithm to complete the training where a population being analyzed is partitioned into a plurality of subpopulations, with each subpopulation being processed by a genetic algorithm independently of the others and where a selective crossover and a fitness measure rescaling produces a chromosome exchange between the subpopulations.
105. An apparatus for building predictive models from transaction data, comprising:
a plurality of transaction systems,
means for preparing data from said systems for use in processing for a series of time periods for one or more elements of value and one or more aspects of financial performance;
means for transforming said element of value data in accordance with one or more pre-programmed functions;
means for establishing a plurality of input nodes, a plurality of hidden nodes and an output node for a neural network model for each aspect of financial performance;
means for inputting the raw and transformed transaction data into each neural network model using a separate input node for untransformed transaction data and each pre-programmed transformation function by element of value for all time periods in the series;
means for training each neural network model using said inputs until an error function associated with an output value that corresponds to an aspect of financial performance is minimized; and
means for using one or more weights from the trained neural network models to identify a set of raw and transformed transaction data by element of value and output that will be used as an element of value summary for use as an input to each of one or more predictive models
normalizing each of the one or more sets of raw and transformed transaction data by element of value,
refining the sets of raw and transformed transaction data by element of value, creating a summary of the refined transaction data set for each element of value, and
using the element of value summaries as inputs to a predictive model for each of the one or more aspects of enterprise financial performance
where the aspects of financial performance are selected from the group consisting of revenue, expense, capital change, cash flow and combinations thereof.
106. The apparatus of claim 105 where a plurality of input nodes is set equal to one plus the number of elements times one plus the number of pre-programmed functions used to transform transaction data.
107. The apparatus of claim 105 where a plurality of hidden nodes is set equal to one plus the number of input nodes.
108. The apparatus of claim 105, where an error function further comprises ERR(W)k=½(Rk−Y(W))2.
109. The apparatus of claim 105 where a set of raw and transformed transaction data that will be used as an input to a predictive model further comprises a set of numbers.
110. The apparatus of claim 105 where one or more predictive models further comprises one or more neural network models.
111. The apparatus of claim 105 where training a neural network model further comprises using a genetic algorithm to complete the training where a population being analyzed is partitioned into a plurality of subpopulations, with each subpopulation being processed by a genetic algorithm independently of the others and where a migration mechanism produces a chromosome exchange between the subpopulations.
112. The apparatus of claim 105 where training a neural network model further comprises using a back propagation algorithm to complete the training.
113. The apparatus of claim 105 where one or more elements further comprise elements of value selected from the group consisting of brands, customers, employees, partners, vendors and combinations thereof.
114. The apparatus of claim 105 where one or more outputs further comprise a plurality of transaction systems comprise systems selected from the group consisting of advanced financial systems, basic financial systems, operation management systems, sales management systems, human resource systems, accounts receivable systems, accounts payable systems, capital asset systems, inventory systems, invoicing systems, payroll systems, purchasing systems, the Internet and combinations thereof.
115. The apparatus of claim 105 where a series of time periods contains time periods selected from the group consisting of historical time periods, future time periods and combinations thereof.
116. The apparatus of claim 105 where the one or more pre programmed functions are selected from the group consisting of average, rolling average, time delay, trend, average time delay, rolling average time delay, ratio, average ratio, rolling average ratio, slope, average slope, rolling average slope and combinations thereof.
117. The apparatus of claim 105 where preparing data for use in processing further comprises integrating, converting and storing data from a plurality of systems in accordance with a common data dictionary.
118. The apparatus of claim 105 that further comprises: means for training a neural network by using a genetic algorithm to complete the training where a population being analyzed is partitioned into a plurality of subpopulations, with each subpopulation being processed by a genetic algorithm independently of the others and where a selective crossover and a fitness measure rescaling produces a chromosome exchange between the subpopulations.
119. A data processing method, comprising:
organizing business transaction data by enterprise into one or more components of value and two or more elements of value where at least one element of value is intangible;
determining a relative contribution of each of two or more elements of value to a value of a business by analyzing at least a portion of the data; and
reporting the relative contribution of each element of value and the value of the business.
120. The data processing method of claim 119 wherein determining a relative contribution for each of the two or more elements to a value of the business further comprises:
deriving an element of value weighting factor for each element of value by enterprise; and
weighting the data concerning each of one or more elements of value according to the element of value weighting factors for each enterprise, where the relative value contribution is the sum of the weighted element of value data for all enterprises within the business.
121. The data processing method of claim 119 wherein the intangible elements of value are selected from the group consisting of brands, customers, employees, partners, vendors and combinations thereof.
122. The data processing method of claim 119 wherein reporting the value of the business and the relative contribution by element of value further comprises the use of a paper document or an electronic display.
123. The data processing method of claim 119 wherein a value of the business is market value.
124. The data processing method of claim 119 wherein at least one of the two or more elements of value contain items that are optionally clustered into sub-elements of value for more detailed analysis.
125. The data processing method of claim 119 wherein transaction data is obtained from the group consisting of advanced financial systems, basic financial systems, operation management systems, sales management systems, human resource systems, accounts receivable systems, accounts payable systems, capital asset systems, inventory systems, invoicing systems, payroll systems, purchasing systems and combinations thereof.
126. The data processing method of claim 119 wherein at least a portion of the data is obtained from the Internet.
127. The data processing method of claim 119 wherein an enterprise is defined by a revenue component of value together with an optional component of value selected from the group consisting of expense, capital change and combinations thereof.
128. The data processing method of claim 119 wherein a revenue component of value that defines an enterprise can include the revenue from a single product, a group of products, a division or an entire company.
129. The data processing method of claim 119 wherein each of one or more components of value can be divided into subcomponents of value for more detailed analysis.
130. The data processing method of claim 119 wherein a relative contribution for each element of value further comprises a relative contribution for a specified point in time within a sequential series of points in time.
131. The data processing method of claim 119 wherein a relative contribution of each element of value to a value of a business is determined by a relative impact of the element of value on the components of value and the other elements of value by enterprise.
132. The data processing method of claim 120 wherein deriving one or more element of value weighting factors further comprises:
determining an initial weighting factor with a predictive neural network model; and
finalizing the element of value weighting factors with a model selected from the group consisting of entropy minimization, lagrange and path analysis.
133. The data processing method of claim 132 wherein the method further comprises using genetic algorithms to evolve each model to an optimal configuration before completing each method step.
134. A program storage device having sequences of instructions stored therein, which when executed causes the processor in a computer to perform a data processing method, comprising:
organizing business data by enterprise into one or more components of value and two or more elements of value where at least one element of value is intangible;
determining a relative contribution of each of two or more elements of value to a value of the business by analyzing at least a portion of the data; and
reporting the relative contribution of each element of value and the value of the business.
135. The program storage device of claim 134 wherein determining a relative contribution for each of the two or more elements to a value of the business further comprises:
deriving an element of value weighting factor for each element of value by enterprise; and
weighting the data concerning each of one or more elements of value according to the element of value weighting factors for each enterprise, where the relative value contribution is the sum of the weighted element of value data for all enterprises within the business.
136. The program storage device of claim 134 wherein an intangible element of value is selected from the group consisting of brands, customers, employees, partners, vendors and combinations thereof.
137. The program storage device of claim 134 wherein reporting the value of the business and the relative contribution by element of value further comprises the use of a paper document or an electronic display.
138. The program storage device of claim 134 wherein a value of the business is market value.
139. The program storage device of claim 134 wherein at least one of the two or more elements of value contain items that are optionally clustered into sub-elements of value for more detailed analysis.
140. The program storage device of claim 134 wherein transaction data is obtained from the group consisting of advanced financial systems, basic financial systems, operation management systems, sales management systems, human resource systems, accounts receivable systems, accounts payable systems, capital asset systems, inventory systems, invoicing systems, payroll systems, purchasing systems and combinations thereof.
141. The program storage device of claim 134 wherein at least a portion of the data is obtained from the Internet.
142. The program storage device of claim 134 wherein an enterprise is defined by a revenue component of value together with an optional component of value selected from the group consisting of expense, capital change and combinations thereof.
143. The program storage device of claim 134 wherein a revenue component of value that defines an enterprise can include the revenue from a single product, a group of products, a division or an entire company.
144. The program storage device of claim 134 wherein each of one or more components of value can be divided into subcomponents of value for more detailed analysis.
145. The program storage device of claim 134 wherein a relative contribution for each element of value further comprises a relative contribution for a specified point in time within a sequential series of points in time.
146. The program storage device of claim 134 wherein a relative contribution of each element of value to a value of a business is determined by a relative impact of the element of value on the components of value and the other elements of value by enterprise.
147. The program storage device of claim 135 wherein deriving one or more element of value weighting factors further comprises:
determining an initial weighting factor with a predictive neural network model; and
finalizing the element of value weighting factors with a model selected from the group consisting of entropy minimization, lagrange and path analysis.
148. The program storage device of claim 147 wherein the method further comprises using genetic algorithms to evolve each model to an optimal configuration before completing each method step.
149. A financial system, comprising:
networked computers each with a processor having circuitry to execute instructions; a storage device available to each processor with sequences of instructions stored therein, which when executed cause the processors to:
integrate transaction data from a plurality of enterprise management systems, analyze at least a portion of the integrated data to identify one or more events that drive enterprise value creation and a business context that is associated with said events, and
using transaction data associated with said events to develop a computational model of enterprise financial performance.
150. The system of claim 149 wherein a computational model further comprises up to three network component of value models where a plurality of tangible and intangible elements of value are connected to a level of each component of value over time and where automated analysis through computational techniques is supported.
151. The system of claim 149 wherein a computational model further comprises a causal model that supports automated analysis through computational techniques.
152. The system of claim 149 wherein one or more intangible elements of value are selected from the group consisting of brands, customers, employees, intellectual capital, partners, vendors, vendor relationships and combinations thereof.
153. The system of claim 149 wherein one or more tangible elements of value further comprise production equipment.
154. The system of claim 149 where one or more components of value are selected from the group consisting of revenue, expense, capital change and combinations thereof.
155. The system of claim 149 that produces useful results selected from the group consisting a valuation for one or more elements of value, an impact quantification for one or more elements of value, one or more financial performance forecasts that do not require reconciliations, one or more forecasts of the expected impact of change to an element value driver and combinations thereof.
156. A program storage device readable by a computer, tangibly embodying a program of instructions executable by at least one computer to perform the steps in a neural network development method, comprising:
a) preparing a plurality of input data and ouput data for a population for use in neural network processing,
b) defining a structure for a neural network comprising a plurality of input nodes, a plurality of hidden nodes, an output node, a connection between each input node and each hidden node and a connection between each hidden node and the output node,
c) assigning a random weight value to the connections between each node and a target fitness level
d) creating a plurality of chromosomes that encode the weights between each node,
e) generating a successor set of weight values from said initial set of weight values by evolving the chromosomes with a genetic algorithm, the input data and the output data until the target fitness level is achieved,
f) implementing said neural network with the set of weight values that achieved the target fitness level
where the population being analyzed is partitioned into a plurality of subpopulations,
with each subpopulation being processed by a genetic algorithm independently of the others and where a selective crossover produces a chromosome exchange between the subpopulations, and
where the selective crossover occurs between two or more successive generations.
157. The program storage device of claim 156, wherein a neural network model connects one or more elements of value of a business enterprise to one or more aspects of financial performance of said business enterprise,
where each input node represents an element of value,
where each output node represents an aspect of financial performance,
where the weights between nodes represent a plurality of relationships where each relationship is a function of the impact of an element of value on other elements of value or on an aspect of financial performance, and
where one or more aspects of financial performance are selected from the group consisting of revenue, expense, capital change, market value and combinations thereof.
158. The program storage device of claim 156, wherein a neural network model further comprises a business event network model.
159. A computer implemented neural network modeling method, comprising:
a) preparing a plurality of input data and ouput data for a population for use in neural network processing,
b) defining a structure for a neural network comprising a plurality of input nodes, a plurality of hidden nodes, an output node, a connection between each input node and each hidden node and a connection between each hidden node and the output node,
c) assigning a random weight value to the connections between each node and a target fitness level
d) creating a plurality of chromosomes that encode the weights between each node,
e) generating a successor set of weight values from said initial set of weight values by evolving the chromosomes with a genetic algorithm, the input data and the output data until the target fitness level is achieved,
f) implementing said neural network with the set of weight values that achieved the target fitness level
where the population being analyzed is partitioned into a plurality of subpopulations,
with each subpopulation being processed by a genetic algorithm independently of the others and where a selective crossover produces a chromosome exchange between the subpopulations, and
where the selective crossover occurs between two or more successive generations.
160. The method of claim 159, wherein a neural network model connects one or more elements of value of a business enterprise to one or more aspects of financial performance of said business enterprise,
where each input node represents an element of value,
where each output node represents an aspect of financial performance,
where the weights between nodes represent a plurality of relationships where each relationship is a function of the impact of an element of value on other elements of value or on an aspect of financial performance, and
where one or more aspects of financial performance are selected from the group consisting of revenue, expense, capital change, market value and combinations thereof.
161. The method of claim 159, wherein a neural network model further comprises a business event network model.
US09/938,874 1997-01-06 2001-08-27 Method of and system for analyzing, modeling and valuing elements of a business enterprise Abandoned US20080071588A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US09/938,874 US20080071588A1 (en) 1997-12-10 2001-08-27 Method of and system for analyzing, modeling and valuing elements of a business enterprise
US10/282,113 US20050119922A1 (en) 1997-01-06 2002-10-29 Method of and system for analyzing, modeling and valuing elements of a business enterprise
US10/283,083 US7580848B2 (en) 1997-01-06 2002-10-30 Method of and system for analyzing, modeling and valuing elements of a business enterprise
US10/298,021 US7693733B2 (en) 1997-01-06 2002-11-18 Method of and system for analyzing, modeling and valuing elements of a business enterprise

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US99924597A 1997-12-10 1997-12-10
US09/938,874 US20080071588A1 (en) 1997-12-10 2001-08-27 Method of and system for analyzing, modeling and valuing elements of a business enterprise

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US99924597A Continuation 1995-10-03 1997-12-10

Related Child Applications (3)

Application Number Title Priority Date Filing Date
US10/282,113 Continuation US20050119922A1 (en) 1997-01-06 2002-10-29 Method of and system for analyzing, modeling and valuing elements of a business enterprise
US10/283,083 Continuation US7580848B2 (en) 1997-01-06 2002-10-30 Method of and system for analyzing, modeling and valuing elements of a business enterprise
US10/298,021 Continuation US7693733B2 (en) 1997-01-06 2002-11-18 Method of and system for analyzing, modeling and valuing elements of a business enterprise

Publications (1)

Publication Number Publication Date
US20080071588A1 true US20080071588A1 (en) 2008-03-20

Family

ID=46328236

Family Applications (3)

Application Number Title Priority Date Filing Date
US09/938,874 Abandoned US20080071588A1 (en) 1997-01-06 2001-08-27 Method of and system for analyzing, modeling and valuing elements of a business enterprise
US10/283,083 Expired - Fee Related US7580848B2 (en) 1997-01-06 2002-10-30 Method of and system for analyzing, modeling and valuing elements of a business enterprise
US10/298,021 Expired - Fee Related US7693733B2 (en) 1997-01-06 2002-11-18 Method of and system for analyzing, modeling and valuing elements of a business enterprise

Family Applications After (2)

Application Number Title Priority Date Filing Date
US10/283,083 Expired - Fee Related US7580848B2 (en) 1997-01-06 2002-10-30 Method of and system for analyzing, modeling and valuing elements of a business enterprise
US10/298,021 Expired - Fee Related US7693733B2 (en) 1997-01-06 2002-11-18 Method of and system for analyzing, modeling and valuing elements of a business enterprise

Country Status (1)

Country Link
US (3) US20080071588A1 (en)

Cited By (73)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040073442A1 (en) * 2002-10-11 2004-04-15 Heyns Herman R. Strategic planning and valuation
US20040073441A1 (en) * 2002-10-11 2004-04-15 Heyns Herman R. Planning for valve
US20040073477A1 (en) * 2002-10-11 2004-04-15 Heyns Herman R. Shareholder value enhancement
US20050268122A1 (en) * 2004-05-28 2005-12-01 Young Brian R Devices and methods for validating network connections
US20050273404A1 (en) * 2003-07-01 2005-12-08 Accenture Global Services Gmbh Shareholder value tool
US20060190487A1 (en) * 2005-02-24 2006-08-24 International Business Machines Corporation Method and system for managing inventory for a migration using history data
US20090125370A1 (en) * 2007-11-08 2009-05-14 Genetic Finance Holdings Limited Distributed network for performing complex algorithms
US20100145788A1 (en) * 2007-04-12 2010-06-10 Laima Kardokas Merchant performance rating for payments on account
US20100145856A1 (en) * 2008-12-08 2010-06-10 Laima Kardokas Automated merchant performance rating for payments on account
US20100274742A1 (en) * 2009-04-28 2010-10-28 Genetic Finance Holdings Limited AMS Trustees Limited Distributed evolutionary algorithm for asset management and trading
US20100274736A1 (en) * 2009-04-28 2010-10-28 Genetic Finance Holdings Limited, AMS Trustees Limited Class-based distributed evolutionary algorithm for asset management and trading
US20110238458A1 (en) * 2010-03-24 2011-09-29 International Business Machines Corporation Dynamically optimized distributed cloud computing-based business process management (bpm) system
US20120191630A1 (en) * 2011-01-26 2012-07-26 Google Inc. Updateable Predictive Analytical Modeling
US20120310686A1 (en) * 2011-06-06 2012-12-06 Carter Michael M Engine, system and method of providing business valuation and database services using alternative payment arrangements
US20120310683A1 (en) * 2011-06-06 2012-12-06 Carter Michael M Engine, system and method of providing cloud-based business valuation and associated rules-based services
US20130238399A1 (en) * 2009-11-03 2013-09-12 Sas Institute Inc. Computer-Implemented Systems and Methods for Scenario Analysis
US20140006088A1 (en) * 2011-12-08 2014-01-02 Copperleaf Technologies Inc. Automated scheduling of non-routine maintenance to systems of capital assets
WO2014105118A1 (en) * 2012-12-28 2014-07-03 Intel Corporation Downlink and uplink interference mitigation in a multicell network using interference cancellation and orthogonal resource allocation
US20140278770A1 (en) * 2013-03-13 2014-09-18 International Business Machines Corporation Generating economic model based on business transaction messages
US20140330609A1 (en) * 2013-05-01 2014-11-06 International Business Machines Corporation Performance Driven Municipal Asset Needs and Sustainability Analysis
US20140343998A1 (en) * 2013-05-17 2014-11-20 Arthur Brian Andonian Project oriented cash management
US8909570B1 (en) 2008-11-07 2014-12-09 Genetic Finance (Barbados) Limited Data mining technique with experience-layered gene pool
AU2012201530B2 (en) * 2011-03-15 2014-12-18 Accenture Global Services Limited Analytics value assessment toolkit
US20150039400A1 (en) * 2013-07-31 2015-02-05 Hitachi, Ltd. Business viability evaluation apparatus, business viability evaluation method, and business viability evaluation program
US8977581B1 (en) 2011-07-15 2015-03-10 Sentient Technologies (Barbados) Limited Data mining technique with diversity promotion
US9304895B1 (en) 2011-07-15 2016-04-05 Sentient Technologies (Barbados) Limited Evolutionary technique with n-pool evolution
US9367816B1 (en) 2011-07-15 2016-06-14 Sentient Technologies (Barbados) Limited Data mining technique with induced environmental alteration
US20170004434A1 (en) * 2015-06-30 2017-01-05 International Business Machines Corporation Determining Individual Performance Dynamics Using Federated Interaction Graph Analytics
US9679253B2 (en) 2014-11-06 2017-06-13 Copperleaf Technologies Inc. Methods for maintaining infrastructure equipment and related apparatus
US9710764B1 (en) 2011-07-15 2017-07-18 Sentient Technologies (Barbados) Limited Data mining technique with position labeling
US20180040064A1 (en) * 2016-08-04 2018-02-08 Xero Limited Network-based automated prediction modeling
US20180182043A1 (en) * 2016-12-23 2018-06-28 General Electric Company Jet engine asset value analyzer
US10025700B1 (en) 2012-07-18 2018-07-17 Sentient Technologies (Barbados) Limited Data mining technique with n-Pool evolution
US20180250554A1 (en) * 2017-03-03 2018-09-06 Sentient Technologies (Barbados) Limited Behavior Dominated Search in Evolutionary Search Systems
US20190066010A1 (en) * 2017-08-24 2019-02-28 United States Of America As Represented By The Secretary Of The Army Predictive model for optimizing facility usage
CN109636621A (en) * 2018-12-17 2019-04-16 泰康保险集团股份有限公司 Method, system, equipment and storage medium for Asset Allocation assessment
CN109636242A (en) * 2019-01-03 2019-04-16 深圳壹账通智能科技有限公司 Enterprise's methods of marking, device, medium and electronic equipment
US10268953B1 (en) 2014-01-28 2019-04-23 Cognizant Technology Solutions U.S. Corporation Data mining technique with maintenance of ancestry counts
US10430429B2 (en) 2015-09-01 2019-10-01 Cognizant Technology Solutions U.S. Corporation Data mining management server
US10560313B2 (en) 2018-06-26 2020-02-11 Sas Institute Inc. Pipeline system for time-series data forecasting
US10685283B2 (en) 2018-06-26 2020-06-16 Sas Institute Inc. Demand classification based pipeline system for time-series data forecasting
US10956823B2 (en) 2016-04-08 2021-03-23 Cognizant Technology Solutions U.S. Corporation Distributed rule-based probabilistic time-series classifier
US11003994B2 (en) 2017-12-13 2021-05-11 Cognizant Technology Solutions U.S. Corporation Evolutionary architectures for evolution of deep neural networks
CN112907154A (en) * 2021-04-13 2021-06-04 国网安徽省电力有限公司 Power grid physical asset input-output evaluation method
US11050613B2 (en) * 2018-12-06 2021-06-29 HashiCorp Generating configuration files for configuring an information technology infrastructure
US11050625B2 (en) * 2018-12-06 2021-06-29 HashiCorp Generating configuration files for configuring an information technology infrastructure
CN113114739A (en) * 2021-03-29 2021-07-13 华南理工大学 Method for realizing dynamic selection of file transfer protocol based on cloud storage system
CN113449403A (en) * 2021-06-28 2021-09-28 江苏省城市规划设计研究院有限公司 Complex network node evaluation method based on hierarchical network division
US20210312297A1 (en) * 2020-04-07 2021-10-07 Cognizant Technology Solutions U.S. Corporation Framework For Interactive Exploration, Evaluation, and Improvement of AI-Generated Solutions
US11182677B2 (en) 2017-12-13 2021-11-23 Cognizant Technology Solutions U.S. Corporation Evolving recurrent networks using genetic programming
US11205186B2 (en) 2020-05-07 2021-12-21 Nowcasting.ai, Inc. Artificial intelligence for automated stock orders based on standardized data and company financial data
US11250314B2 (en) 2017-10-27 2022-02-15 Cognizant Technology Solutions U.S. Corporation Beyond shared hierarchies: deep multitask learning through soft layer ordering
US11250328B2 (en) 2016-10-26 2022-02-15 Cognizant Technology Solutions U.S. Corporation Cooperative evolution of deep neural network structures
US11281977B2 (en) 2017-07-31 2022-03-22 Cognizant Technology Solutions U.S. Corporation Training and control system for evolving solutions to data-intensive problems using epigenetic enabled individuals
US11288579B2 (en) 2014-01-28 2022-03-29 Cognizant Technology Solutions U.S. Corporation Training and control system for evolving solutions to data-intensive problems using nested experience-layered individual pool
US11403532B2 (en) 2017-03-02 2022-08-02 Cognizant Technology Solutions U.S. Corporation Method and system for finding a solution to a provided problem by selecting a winner in evolutionary optimization of a genetic algorithm
CN114926204A (en) * 2022-05-11 2022-08-19 北京大学 Data processing device and method based on data value
US11481639B2 (en) 2019-02-26 2022-10-25 Cognizant Technology Solutions U.S. Corporation Enhanced optimization with composite objectives and novelty pulsation
US11507844B2 (en) 2017-03-07 2022-11-22 Cognizant Technology Solutions U.S. Corporation Asynchronous evaluation strategy for evolution of deep neural networks
US11527308B2 (en) 2018-02-06 2022-12-13 Cognizant Technology Solutions U.S. Corporation Enhanced optimization with composite objectives and novelty-diversity selection
US11574202B1 (en) 2016-05-04 2023-02-07 Cognizant Technology Solutions U.S. Corporation Data mining technique with distributed novelty search
US11574201B2 (en) 2018-02-06 2023-02-07 Cognizant Technology Solutions U.S. Corporation Enhancing evolutionary optimization in uncertain environments by allocating evaluations via multi-armed bandit algorithms
US11587172B1 (en) 2011-11-14 2023-02-21 Economic Alchemy Inc. Methods and systems to quantify and index sentiment risk in financial markets and risk management contracts thereon
US11663492B2 (en) 2015-06-25 2023-05-30 Cognizant Technology Solutions Alife machine learning system and method
US11669364B2 (en) 2018-12-06 2023-06-06 HashiCorp. Inc. Validation of execution plan for configuring an information technology infrastructure
US11669716B2 (en) 2019-03-13 2023-06-06 Cognizant Technology Solutions U.S. Corp. System and method for implementing modular universal reparameterization for deep multi-task learning across diverse domains
US11755979B2 (en) 2018-08-17 2023-09-12 Evolv Technology Solutions, Inc. Method and system for finding a solution to a provided problem using family tree based priors in Bayesian calculations in evolution based optimization
US11775841B2 (en) 2020-06-15 2023-10-03 Cognizant Technology Solutions U.S. Corporation Process and system including explainable prescriptions through surrogate-assisted evolution
US11783195B2 (en) 2019-03-27 2023-10-10 Cognizant Technology Solutions U.S. Corporation Process and system including an optimization engine with evolutionary surrogate-assisted prescriptions
US11983544B2 (en) 2018-12-06 2024-05-14 HashiCorp Lifecycle management for information technology infrastructure
US12020163B2 (en) 2020-02-04 2024-06-25 Bank Of America Corporation Knowledge persistent and structurally dynamic neural network
US12026624B2 (en) 2019-05-23 2024-07-02 Cognizant Technology Solutions U.S. Corporation System and method for loss function metalearning for faster, more accurate training, and smaller datasets
US12033079B2 (en) 2018-02-08 2024-07-09 Cognizant Technology Solutions U.S. Corporation System and method for pseudo-task augmentation in deep multitask learning

Families Citing this family (70)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1247235A4 (en) * 2000-03-06 2008-12-31 Wellogix Inc Method and process for providing relevant data, comparing proposal alternatives, and reconciling proposals, invoices, and purchase orders with actual costs in a workflow process
US7369838B1 (en) * 2000-10-03 2008-05-06 At&T Corporation Intra-premises wireless broadband service using lumped and distributed wireless radiation from cable source input
US20050125322A1 (en) * 2003-11-21 2005-06-09 General Electric Company System, method and computer product to detect behavioral patterns related to the financial health of a business entity
US20080021750A1 (en) * 2004-07-05 2008-01-24 Hiroaki Masuyama Enterprise Evaluation Device, Enterprise Evaluation Program and Enterprise Evaluation Method
US7810713B2 (en) * 2004-08-26 2010-10-12 Microsoft Corporation Cash flow projection tool
US7870047B2 (en) * 2004-09-17 2011-01-11 International Business Machines Corporation System, method for deploying computing infrastructure, and method for identifying customers at risk of revenue change
EP1760587A1 (en) * 2005-01-31 2007-03-07 Ubs Ag Method for the scheduling of software modules
US7562062B2 (en) * 2005-03-31 2009-07-14 British Telecommunications Plc Forecasting system tool
US20060293933A1 (en) * 2005-06-22 2006-12-28 Bae Systems National Security Solutions, Inc. Engineering method and tools for capability-based families of systems planning
US7624049B2 (en) * 2005-08-16 2009-11-24 Joel Jameson Financial accounting methods and systems to account for assets and liabilities
TWI295446B (en) * 2005-12-30 2008-04-01 Ind Tech Res Inst Executing system and executing method of intelligent rule base service
US20090138341A1 (en) * 2006-05-19 2009-05-28 Mohan S Raj Web Enabled Method for Managing Life Cycle of Human Capital Related Dynamic Requirement of Organization
US20080126155A1 (en) * 2006-11-27 2008-05-29 Sap Ag Method and apparatus for enterprise operation assessment
US20080221940A1 (en) * 2007-03-08 2008-09-11 Cohn David L System and method for using the component business model to analyze business value drivers
NZ566680A (en) * 2007-03-19 2009-11-27 Bstar Ip Pty Ltd Method of business valuation and data processing system
US8332331B2 (en) * 2007-03-19 2012-12-11 Hewlett-Packard Development Company, L.P. Determining a price premium for a project
US20080255964A1 (en) * 2007-04-05 2008-10-16 Trevor Robert Milton Method and system of searching items using equity
US8756306B1 (en) * 2007-06-29 2014-06-17 Verizon Patent And Licensing Inc. Dashboard interface group identifier
US20090164272A1 (en) * 2007-12-21 2009-06-25 Robert Bittlestone Simulator
US8255316B2 (en) * 2007-12-21 2012-08-28 General Electric Company Integrated business decision-making system and method
US7844478B1 (en) 2008-08-15 2010-11-30 United Services Automobile Association (Usaa) Systems and methods for implementing real estate value insurance
US7809591B1 (en) 2008-08-15 2010-10-05 United Services Automobile Association (Usaa) Systems and methods for implementing real estate value insurance
US7885879B1 (en) 2008-08-15 2011-02-08 United Services Automobile Association (Usaa) Systems and methods for implementing real estate value insurance
US7890403B1 (en) 2008-08-15 2011-02-15 United Services Automobile Association (Usaa) Systems and methods for implementing real estate future market value insurance
US8549163B2 (en) * 2008-09-18 2013-10-01 Jonathan M. Urdan Passive parameter based demographics generation
WO2010080146A2 (en) * 2009-01-07 2010-07-15 Cfi Group Usa, L.L.C. Statistical impact analysis machine
US20100250419A1 (en) * 2009-03-30 2010-09-30 Bank Of America Corporation Systems and methods for determining a target budget allocation
US20100250420A1 (en) * 2009-03-30 2010-09-30 Bank Of America Corporation Systems and methods for budget guardrails
US8412622B2 (en) * 2009-03-30 2013-04-02 Bank Of America Corporation Systems and methods for determining a financial health indicator
US20100250421A1 (en) * 2009-03-30 2010-09-30 Bank Of America Corporation Systems and methods for determining the budget impact of purchases, potential purchases and cost adjustments
US20110029339A1 (en) * 2009-07-31 2011-02-03 Ciright Systems, Inc Enterprise and Sales Management Platform
US20110040399A1 (en) * 2009-08-14 2011-02-17 Honeywell International Inc. Apparatus and method for integrating planning, scheduling, and control for enterprise optimization
US20110126128A1 (en) * 2009-09-28 2011-05-26 Future Insight Maps, Inc. Future insight maps and associated tools
CA2780660C (en) 2009-12-02 2018-07-10 Shell Internationale Research Maatschappij B.V. Economics-based coordination of advanced process control and real-time optimization
US8560420B2 (en) * 2009-12-07 2013-10-15 Predictive Technologies Group, Llc Calculating predictive technical indicators
US8442891B2 (en) * 2009-12-07 2013-05-14 Predictive Technologies Group, Llc Intermarket analysis
US20110178850A1 (en) * 2010-01-19 2011-07-21 Accenture Global Services Gmbh Future cost estimate forecasting for technologies
US20110209067A1 (en) * 2010-02-19 2011-08-25 Bogess Keandre System and Method for Website User Valuation
US8438122B1 (en) 2010-05-14 2013-05-07 Google Inc. Predictive analytic modeling platform
US8473431B1 (en) 2010-05-14 2013-06-25 Google Inc. Predictive analytic modeling platform
US10360527B2 (en) * 2010-11-10 2019-07-23 International Business Machines Corporation Casual modeling of multi-dimensional hierarchical metric cubes
US8595154B2 (en) 2011-01-26 2013-11-26 Google Inc. Dynamic predictive modeling platform
US8533224B2 (en) 2011-05-04 2013-09-10 Google Inc. Assessing accuracy of trained predictive models
WO2012174138A2 (en) * 2011-06-14 2012-12-20 Xyleco, Inc. Funding capital projects
US9224121B2 (en) 2011-09-09 2015-12-29 Sap Se Demand-driven collaborative scheduling for just-in-time manufacturing
US8744888B2 (en) * 2012-04-04 2014-06-03 Sap Ag Resource allocation management
US9122261B2 (en) * 2012-04-24 2015-09-01 Honeywell International Inc. Apparatus and method for real-time sequential quadratic programming in industrial process control systems
US9043255B2 (en) 2012-05-09 2015-05-26 International Business Machines Corporation Optimally configuring an information landscape
US9652121B2 (en) 2013-07-12 2017-05-16 Future Insight Maps, Inc. Adaptively navigating complexity together through collaborative insights
US10282704B2 (en) 2014-03-07 2019-05-07 Jerry L. Mills System and method for controlling sale of a company
US9733629B2 (en) 2014-07-21 2017-08-15 Honeywell International Inc. Cascaded model predictive control (MPC) approach for plantwide control and optimization
US10379503B2 (en) 2014-07-21 2019-08-13 Honeywell International Inc. Apparatus and method for calculating proxy limits to support cascaded model predictive control (MPC)
US10095797B2 (en) * 2014-10-03 2018-10-09 Salesforce.Com, Inc. Suggesting actions for evaluating user performance in an enterprise social network
WO2016201527A1 (en) * 2015-06-18 2016-12-22 Xtega Pty Ltd Systems and methods for valuing assets
US11456885B1 (en) 2015-12-17 2022-09-27 EMC IP Holding Company LLC Data set valuation for service providers
US10528522B1 (en) 2016-03-17 2020-01-07 EMC IP Holding Company LLC Metadata-based data valuation
US10838946B1 (en) 2016-03-18 2020-11-17 EMC IP Holding Company LLC Data quality computation for use in data set valuation
WO2017180671A1 (en) * 2016-04-11 2017-10-19 Openmatters, Inc. Universal business model scoring, classification, and decision-making engine
US10789224B1 (en) 2016-04-22 2020-09-29 EMC IP Holding Company LLC Data value structures
US10838965B1 (en) * 2016-04-22 2020-11-17 EMC IP Holding Company LLC Data valuation at content ingest
US10671483B1 (en) 2016-04-22 2020-06-02 EMC IP Holding Company LLC Calculating data value via data protection analytics
US10210551B1 (en) 2016-08-15 2019-02-19 EMC IP Holding Company LLC Calculating data relevance for valuation
US10719480B1 (en) 2016-11-17 2020-07-21 EMC IP Holding Company LLC Embedded data valuation and metadata binding
US11037208B1 (en) 2016-12-16 2021-06-15 EMC IP Holding Company LLC Economic valuation of data assets
US10997552B2 (en) * 2017-03-15 2021-05-04 Walmart Apollo, Llc System and method for determination and management of root cause for inventory problems
US10466684B2 (en) 2017-05-25 2019-11-05 Honeywell International Inc. Apparatus and method for adjustable identification of controller feasibility regions to support cascaded model predictive control (MPC)
US20190080267A1 (en) * 2017-09-08 2019-03-14 John O'Brien Expert Driven Iterative Method and System to Facilitate Business Valuations
US10908562B2 (en) 2017-10-23 2021-02-02 Honeywell International Inc. Apparatus and method for using advanced process control to define real-time or near real-time operating envelope
US20200250474A1 (en) * 2019-01-31 2020-08-06 Unlisted Ltd System for estimating value of company using financial technology
US11694277B2 (en) * 2019-04-15 2023-07-04 Adp, Inc. Credit eligibility predictor

Citations (70)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3749892A (en) * 1971-02-16 1973-07-31 Qeleg Ltd Accountancy system
US3933305A (en) * 1974-08-23 1976-01-20 John Michael Murphy Asset value calculators
US4839804A (en) * 1986-12-30 1989-06-13 College Savings Bank Method and apparatus for insuring the funding of a future liability of uncertain cost
US4839304A (en) * 1986-12-18 1989-06-13 Nec Corporation Method of making a field effect transistor with overlay gate structure
US4989141A (en) * 1987-06-01 1991-01-29 Corporate Class Software Computer system for financial analyses and reporting
US5128861A (en) * 1988-12-07 1992-07-07 Hitachi, Ltd. Inventory control method and system
US5193055A (en) * 1987-03-03 1993-03-09 Brown Gordon T Accounting system
US5224034A (en) * 1990-12-21 1993-06-29 Bell Communications Research, Inc. Automated system for generating procurement lists
US5237495A (en) * 1990-05-23 1993-08-17 Fujitsu Limited Production/purchase management processing system and method
US5237946A (en) * 1989-01-23 1993-08-24 Copson Alex G Apparatus and method for transferring material to subaqueous levels
US5317504A (en) * 1991-10-23 1994-05-31 T.A.S. & Trading Co., Ltd. Computer implemented process for executing accounting theory systems
US5361201A (en) * 1992-10-19 1994-11-01 Hnc, Inc. Real estate appraisal using predictive modeling
US5406477A (en) * 1991-08-30 1995-04-11 Digital Equipment Corporation Multiple reasoning and result reconciliation for enterprise analysis
US5414621A (en) * 1992-03-06 1995-05-09 Hough; John R. System and method for computing a comparative value of real estate
US5471611A (en) * 1991-03-13 1995-11-28 University Of Strathclyde Computerised information-retrieval database systems
US5638492A (en) * 1992-09-08 1997-06-10 Hitachi, Ltd. Information processing apparatus and monitoring apparatus
US5644727A (en) * 1987-04-15 1997-07-01 Proprietary Financial Products, Inc. System for the operation and management of one or more financial accounts through the use of a digital communication and computation system for exchange, investment and borrowing
US5649181A (en) * 1993-04-16 1997-07-15 Sybase, Inc. Method and apparatus for indexing database columns with bit vectors
US5668591A (en) * 1994-03-30 1997-09-16 Sony Corporation Information terminal apparatus that is remotely programmed by radio waves and that displays input keys of program functions on a display
US5680305A (en) * 1995-02-16 1997-10-21 Apgar, Iv; Mahlon System and method for evaluating real estate
US5704045A (en) * 1995-01-09 1997-12-30 King; Douglas L. System and method of risk transfer and risk diversification including means to assure with assurance of timely payment and segregation of the interests of capital
US5704055A (en) * 1993-06-01 1997-12-30 International Business Machines Corporation Dynamic Reconfiguration of main storage and expanded storage by means of a service call logical processor
US5706495A (en) * 1996-05-07 1998-01-06 International Business Machines Corporation Encoded-vector indices for decision support and warehousing
US5737581A (en) * 1995-08-30 1998-04-07 Keane; John A. Quality system implementation simulator
US5742775A (en) * 1995-01-18 1998-04-21 King; Douglas L. Method and apparatus of creating financial instrument and administering an adjustable rate loan system
US5761442A (en) * 1994-08-31 1998-06-02 Advanced Investment Technology, Inc. Predictive neural network means and method for selecting a portfolio of securities wherein each network has been trained using data relating to a corresponding security
US5774873A (en) * 1996-03-29 1998-06-30 Adt Automotive, Inc. Electronic on-line motor vehicle auction and information system
US5794219A (en) * 1996-02-20 1998-08-11 Health Hero Network, Inc. Method of conducting an on-line auction with bid pooling
US5802501A (en) * 1992-10-28 1998-09-01 Graff/Ross Holdings System and methods for computing to support decomposing property into separately valued components
US5809282A (en) * 1995-06-07 1998-09-15 Grc International, Inc. Automated network simulation and optimization system
US5812988A (en) * 1993-12-06 1998-09-22 Investments Analytic, Inc. Method and system for jointly estimating cash flows, simulated returns, risk measures and present values for a plurality of assets
US5812987A (en) * 1993-08-18 1998-09-22 Barclays Global Investors, National Association Investment fund management method and system with dynamic risk adjusted allocation of assets
US5875431A (en) * 1996-03-15 1999-02-23 Heckman; Frank Legal strategic analysis planning and evaluation control system and method
US5887120A (en) * 1995-05-31 1999-03-23 Oracle Corporation Method and apparatus for determining theme for discourse
US6064971A (en) * 1992-10-30 2000-05-16 Hartnett; William J. Adaptive knowledge base
US6064972A (en) * 1997-09-17 2000-05-16 At&T Corp Risk management technique for network access
US6073115A (en) * 1992-09-30 2000-06-06 Marshall; Paul Steven Virtual reality generator for displaying abstract information
US6078901A (en) * 1997-04-03 2000-06-20 Ching; Hugh Quantitative supply and demand model based on infinite spreadsheet
US6092056A (en) * 1994-04-06 2000-07-18 Morgan Stanley Dean Witter Data processing system and method for financial debt instruments
US6112188A (en) * 1992-10-30 2000-08-29 Hartnett; William J. Privatization marketplace
US6125355A (en) * 1997-12-02 2000-09-26 Financial Engines, Inc. Pricing module for financial advisory system
US6134536A (en) * 1992-05-29 2000-10-17 Swychco Infrastructure Services Pty Ltd. Methods and apparatus relating to the formulation and trading of risk management contracts
US6173276B1 (en) * 1997-08-21 2001-01-09 Scicomp, Inc. System and method for financial instrument modeling and valuation
US6189011B1 (en) * 1996-03-19 2001-02-13 Siebel Systems, Inc. Method of maintaining a network of partially replicated database system
US6209124B1 (en) * 1999-08-30 2001-03-27 Touchnet Information Systems, Inc. Method of markup language accessing of host systems and data using a constructed intermediary
US6249768B1 (en) * 1998-10-29 2001-06-19 International Business Machines Corporation Strategic capability networks
US6263314B1 (en) * 1993-12-06 2001-07-17 Irah H. Donner Method of performing intellectual property (IP) audit optionally over network architecture
US6278981B1 (en) * 1997-05-29 2001-08-21 Algorithmics International Corporation Computer-implemented method and apparatus for portfolio compression
US6301584B1 (en) * 1997-08-21 2001-10-09 Home Information Services, Inc. System and method for retrieving entities and integrating data
US6332163B1 (en) * 1999-09-01 2001-12-18 Accenture, Llp Method for providing communication services over a computer network system
US6366934B1 (en) * 1998-10-08 2002-04-02 International Business Machines Corporation Method and apparatus for querying structured documents using a database extender
US6418448B1 (en) * 1999-12-06 2002-07-09 Shyam Sundar Sarkar Method and apparatus for processing markup language specifications for data and metadata used inside multiple related internet documents to navigate, query and manipulate information from a plurality of object relational databases over the web
US6453297B1 (en) * 1993-11-02 2002-09-17 Athena Of North America, Inc. Medical transaction system
US6757689B2 (en) * 2001-02-02 2004-06-29 Hewlett-Packard Development Company, L.P. Enabling a zero latency enterprise
US6909708B1 (en) * 1996-11-18 2005-06-21 Mci Communications Corporation System, method and article of manufacture for a communication system architecture including video conferencing
US7069256B1 (en) * 2002-05-23 2006-06-27 Oracle International Corporation Neural network module for data mining
US7080207B2 (en) * 2002-04-30 2006-07-18 Lsi Logic Corporation Data storage apparatus, system and method including a cache descriptor having a field defining data in a cache block
US7092918B1 (en) * 2000-12-20 2006-08-15 Demandtec, Inc. Apparatus for merchandise price optimization
US7092920B2 (en) * 2000-05-26 2006-08-15 Ncr Corporation Method and apparatus for determining one or more statistical estimators of customer behavior
US7124105B2 (en) * 2003-01-22 2006-10-17 Intuit Inc. Cash flow optimization using a genetic algorithm
US7167837B1 (en) * 2001-04-16 2007-01-23 Ft Interactive Data Corporation Fair-value pricing of a financial asset
US7236940B2 (en) * 2001-05-16 2007-06-26 Perot Systems Corporation Method and system for assessing and planning business operations utilizing rule-based statistical modeling
US7240109B2 (en) * 2002-06-27 2007-07-03 Sun Microsystems, Inc. Remote services system service module interface
US7243081B2 (en) * 1995-10-30 2007-07-10 Efi Actuaries Method of determining optimal asset allocation utilizing asset cash flow simulation
US7249089B2 (en) * 2000-12-29 2007-07-24 Hartford Fire Insurance Company Method and system for auctioning bankruptcy assets and valuing same
US7251582B2 (en) * 2003-01-24 2007-07-31 Rolls-Royce, Plc Fault diagnosis
US7272617B1 (en) * 2001-11-30 2007-09-18 Ncr Corp. Analytic data set creation for modeling in a customer relationship management system
US7337137B2 (en) * 2003-02-20 2008-02-26 Itg, Inc. Investment portfolio optimization system, method and computer program product
US7444309B2 (en) * 2001-10-31 2008-10-28 Icosystem Corporation Method and system for implementing evolutionary algorithms
US7461025B1 (en) * 2001-12-10 2008-12-02 Teradata Us, Inc. Driver amount and count selection processing for financial processing in a relational database management system

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5140530A (en) * 1989-03-28 1992-08-18 Honeywell Inc. Genetic algorithm synthesis of neural networks
JPH04264957A (en) 1991-02-20 1992-09-21 Toshiba Corp Security sales decision making supporting device
DE69327691D1 (en) 1992-07-30 2000-03-02 Teknekron Infowitch Corp Method and system for monitoring and / or controlling the performance of an organization
US5802502A (en) * 1993-05-24 1998-09-01 British Telecommunications Public Limited Company System for selective communication connection based on transaction pricing signals
US5727128A (en) * 1996-05-08 1998-03-10 Fisher-Rosemount Systems, Inc. System and method for automatically determining a set of variables for use in creating a process model
GB9704187D0 (en) 1997-02-28 1997-04-16 Mayon White William M Business analysis tool and method
FR2779243B1 (en) * 1998-05-26 2000-07-07 Commissariat Energie Atomique PROCESS FOR PRODUCING SELF-ALIGNED OPENINGS ON A STRUCTURE BY PHOTOLITHOGRAPHY, PARTICULARLY FOR MICROPOINT FLAT SCREEN
US6553352B2 (en) 2001-05-04 2003-04-22 Demand Tec Inc. Interface for merchandise price optimization
US7451065B2 (en) 2002-03-11 2008-11-11 International Business Machines Corporation Method for constructing segmentation-based predictive models
US7080027B2 (en) 2003-04-17 2006-07-18 Targetrx, Inc. Method and system for analyzing the effectiveness of marketing strategies
US7283982B2 (en) 2003-12-05 2007-10-16 International Business Machines Corporation Method and structure for transform regression

Patent Citations (71)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3749892A (en) * 1971-02-16 1973-07-31 Qeleg Ltd Accountancy system
US3933305A (en) * 1974-08-23 1976-01-20 John Michael Murphy Asset value calculators
US4839304A (en) * 1986-12-18 1989-06-13 Nec Corporation Method of making a field effect transistor with overlay gate structure
US4839804A (en) * 1986-12-30 1989-06-13 College Savings Bank Method and apparatus for insuring the funding of a future liability of uncertain cost
US5193055A (en) * 1987-03-03 1993-03-09 Brown Gordon T Accounting system
US5644727A (en) * 1987-04-15 1997-07-01 Proprietary Financial Products, Inc. System for the operation and management of one or more financial accounts through the use of a digital communication and computation system for exchange, investment and borrowing
US4989141A (en) * 1987-06-01 1991-01-29 Corporate Class Software Computer system for financial analyses and reporting
US5128861A (en) * 1988-12-07 1992-07-07 Hitachi, Ltd. Inventory control method and system
US5237946A (en) * 1989-01-23 1993-08-24 Copson Alex G Apparatus and method for transferring material to subaqueous levels
US5237495A (en) * 1990-05-23 1993-08-17 Fujitsu Limited Production/purchase management processing system and method
US5224034A (en) * 1990-12-21 1993-06-29 Bell Communications Research, Inc. Automated system for generating procurement lists
US5471611A (en) * 1991-03-13 1995-11-28 University Of Strathclyde Computerised information-retrieval database systems
US5406477A (en) * 1991-08-30 1995-04-11 Digital Equipment Corporation Multiple reasoning and result reconciliation for enterprise analysis
US5317504A (en) * 1991-10-23 1994-05-31 T.A.S. & Trading Co., Ltd. Computer implemented process for executing accounting theory systems
US5414621A (en) * 1992-03-06 1995-05-09 Hough; John R. System and method for computing a comparative value of real estate
US6134536A (en) * 1992-05-29 2000-10-17 Swychco Infrastructure Services Pty Ltd. Methods and apparatus relating to the formulation and trading of risk management contracts
US5638492A (en) * 1992-09-08 1997-06-10 Hitachi, Ltd. Information processing apparatus and monitoring apparatus
US6073115A (en) * 1992-09-30 2000-06-06 Marshall; Paul Steven Virtual reality generator for displaying abstract information
US5361201A (en) * 1992-10-19 1994-11-01 Hnc, Inc. Real estate appraisal using predictive modeling
US5802501A (en) * 1992-10-28 1998-09-01 Graff/Ross Holdings System and methods for computing to support decomposing property into separately valued components
US6112188A (en) * 1992-10-30 2000-08-29 Hartnett; William J. Privatization marketplace
US6064971A (en) * 1992-10-30 2000-05-16 Hartnett; William J. Adaptive knowledge base
US5649181A (en) * 1993-04-16 1997-07-15 Sybase, Inc. Method and apparatus for indexing database columns with bit vectors
US5704055A (en) * 1993-06-01 1997-12-30 International Business Machines Corporation Dynamic Reconfiguration of main storage and expanded storage by means of a service call logical processor
US5812987A (en) * 1993-08-18 1998-09-22 Barclays Global Investors, National Association Investment fund management method and system with dynamic risk adjusted allocation of assets
US6453297B1 (en) * 1993-11-02 2002-09-17 Athena Of North America, Inc. Medical transaction system
US6263314B1 (en) * 1993-12-06 2001-07-17 Irah H. Donner Method of performing intellectual property (IP) audit optionally over network architecture
US5812988A (en) * 1993-12-06 1998-09-22 Investments Analytic, Inc. Method and system for jointly estimating cash flows, simulated returns, risk measures and present values for a plurality of assets
US5668591A (en) * 1994-03-30 1997-09-16 Sony Corporation Information terminal apparatus that is remotely programmed by radio waves and that displays input keys of program functions on a display
US6092056A (en) * 1994-04-06 2000-07-18 Morgan Stanley Dean Witter Data processing system and method for financial debt instruments
US5761442A (en) * 1994-08-31 1998-06-02 Advanced Investment Technology, Inc. Predictive neural network means and method for selecting a portfolio of securities wherein each network has been trained using data relating to a corresponding security
US5704045A (en) * 1995-01-09 1997-12-30 King; Douglas L. System and method of risk transfer and risk diversification including means to assure with assurance of timely payment and segregation of the interests of capital
US6148293A (en) * 1995-01-18 2000-11-14 King; Douglas L. Method and apparatus of creating a financial instrument and administering an adjustable rate loan system
US5742775A (en) * 1995-01-18 1998-04-21 King; Douglas L. Method and apparatus of creating financial instrument and administering an adjustable rate loan system
US5680305A (en) * 1995-02-16 1997-10-21 Apgar, Iv; Mahlon System and method for evaluating real estate
US5887120A (en) * 1995-05-31 1999-03-23 Oracle Corporation Method and apparatus for determining theme for discourse
US5809282A (en) * 1995-06-07 1998-09-15 Grc International, Inc. Automated network simulation and optimization system
US5737581A (en) * 1995-08-30 1998-04-07 Keane; John A. Quality system implementation simulator
US7243081B2 (en) * 1995-10-30 2007-07-10 Efi Actuaries Method of determining optimal asset allocation utilizing asset cash flow simulation
US5794219A (en) * 1996-02-20 1998-08-11 Health Hero Network, Inc. Method of conducting an on-line auction with bid pooling
US5875431A (en) * 1996-03-15 1999-02-23 Heckman; Frank Legal strategic analysis planning and evaluation control system and method
US6189011B1 (en) * 1996-03-19 2001-02-13 Siebel Systems, Inc. Method of maintaining a network of partially replicated database system
US5774873A (en) * 1996-03-29 1998-06-30 Adt Automotive, Inc. Electronic on-line motor vehicle auction and information system
US5706495A (en) * 1996-05-07 1998-01-06 International Business Machines Corporation Encoded-vector indices for decision support and warehousing
US6909708B1 (en) * 1996-11-18 2005-06-21 Mci Communications Corporation System, method and article of manufacture for a communication system architecture including video conferencing
US6078901A (en) * 1997-04-03 2000-06-20 Ching; Hugh Quantitative supply and demand model based on infinite spreadsheet
US6278981B1 (en) * 1997-05-29 2001-08-21 Algorithmics International Corporation Computer-implemented method and apparatus for portfolio compression
US6301584B1 (en) * 1997-08-21 2001-10-09 Home Information Services, Inc. System and method for retrieving entities and integrating data
US6173276B1 (en) * 1997-08-21 2001-01-09 Scicomp, Inc. System and method for financial instrument modeling and valuation
US6064972A (en) * 1997-09-17 2000-05-16 At&T Corp Risk management technique for network access
US6125355A (en) * 1997-12-02 2000-09-26 Financial Engines, Inc. Pricing module for financial advisory system
US6366934B1 (en) * 1998-10-08 2002-04-02 International Business Machines Corporation Method and apparatus for querying structured documents using a database extender
US6249768B1 (en) * 1998-10-29 2001-06-19 International Business Machines Corporation Strategic capability networks
US6209124B1 (en) * 1999-08-30 2001-03-27 Touchnet Information Systems, Inc. Method of markup language accessing of host systems and data using a constructed intermediary
US6332163B1 (en) * 1999-09-01 2001-12-18 Accenture, Llp Method for providing communication services over a computer network system
US6418448B1 (en) * 1999-12-06 2002-07-09 Shyam Sundar Sarkar Method and apparatus for processing markup language specifications for data and metadata used inside multiple related internet documents to navigate, query and manipulate information from a plurality of object relational databases over the web
US7092920B2 (en) * 2000-05-26 2006-08-15 Ncr Corporation Method and apparatus for determining one or more statistical estimators of customer behavior
US7092918B1 (en) * 2000-12-20 2006-08-15 Demandtec, Inc. Apparatus for merchandise price optimization
US7249089B2 (en) * 2000-12-29 2007-07-24 Hartford Fire Insurance Company Method and system for auctioning bankruptcy assets and valuing same
US6757689B2 (en) * 2001-02-02 2004-06-29 Hewlett-Packard Development Company, L.P. Enabling a zero latency enterprise
US7167837B1 (en) * 2001-04-16 2007-01-23 Ft Interactive Data Corporation Fair-value pricing of a financial asset
US7236940B2 (en) * 2001-05-16 2007-06-26 Perot Systems Corporation Method and system for assessing and planning business operations utilizing rule-based statistical modeling
US7444309B2 (en) * 2001-10-31 2008-10-28 Icosystem Corporation Method and system for implementing evolutionary algorithms
US7272617B1 (en) * 2001-11-30 2007-09-18 Ncr Corp. Analytic data set creation for modeling in a customer relationship management system
US7461025B1 (en) * 2001-12-10 2008-12-02 Teradata Us, Inc. Driver amount and count selection processing for financial processing in a relational database management system
US7080207B2 (en) * 2002-04-30 2006-07-18 Lsi Logic Corporation Data storage apparatus, system and method including a cache descriptor having a field defining data in a cache block
US7069256B1 (en) * 2002-05-23 2006-06-27 Oracle International Corporation Neural network module for data mining
US7240109B2 (en) * 2002-06-27 2007-07-03 Sun Microsystems, Inc. Remote services system service module interface
US7124105B2 (en) * 2003-01-22 2006-10-17 Intuit Inc. Cash flow optimization using a genetic algorithm
US7251582B2 (en) * 2003-01-24 2007-07-31 Rolls-Royce, Plc Fault diagnosis
US7337137B2 (en) * 2003-02-20 2008-02-26 Itg, Inc. Investment portfolio optimization system, method and computer program product

Cited By (117)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8386297B2 (en) 2002-10-11 2013-02-26 Accenture Global Services Limited Planning for value
US20040073441A1 (en) * 2002-10-11 2004-04-15 Heyns Herman R. Planning for valve
US20040073477A1 (en) * 2002-10-11 2004-04-15 Heyns Herman R. Shareholder value enhancement
US7930195B2 (en) * 2002-10-11 2011-04-19 Accenture Global Services Limited Strategic management and budgeting tools
US20110173050A1 (en) * 2002-10-11 2011-07-14 Accenture Global Services Limited Strategic Planning And Valuation
US20090327015A1 (en) * 2002-10-11 2009-12-31 Accenture Global Services Gmbh Planning for value
US20040073442A1 (en) * 2002-10-11 2004-04-15 Heyns Herman R. Strategic planning and valuation
US20050273404A1 (en) * 2003-07-01 2005-12-08 Accenture Global Services Gmbh Shareholder value tool
US7912769B2 (en) * 2003-07-01 2011-03-22 Accenture Global Services Limited Shareholder value tool
US20050268122A1 (en) * 2004-05-28 2005-12-01 Young Brian R Devices and methods for validating network connections
US7523147B2 (en) * 2005-02-24 2009-04-21 International Business Machines Corporation Method and system for managing inventory for a migration using history data
US20060190487A1 (en) * 2005-02-24 2006-08-24 International Business Machines Corporation Method and system for managing inventory for a migration using history data
US20100145788A1 (en) * 2007-04-12 2010-06-10 Laima Kardokas Merchant performance rating for payments on account
US8655777B2 (en) 2007-04-12 2014-02-18 Visa U.S.A. Inc. Merchant performance rating for payments on account
US20090125370A1 (en) * 2007-11-08 2009-05-14 Genetic Finance Holdings Limited Distributed network for performing complex algorithms
US8918349B2 (en) 2007-11-08 2014-12-23 Genetic Finance (Barbados) Limited Distributed network for performing complex algorithms
US8825560B2 (en) 2007-11-08 2014-09-02 Genetic Finance (Barbados) Limited Distributed evolutionary algorithm for asset management and trading
US9684875B1 (en) 2008-11-07 2017-06-20 Sentient Technologies (Barbados) Limited Data mining technique with experience-layered gene pool
US9734215B2 (en) 2008-11-07 2017-08-15 Sentient Technologies (Barbados) Limited Data mining technique with experience-layered gene pool
US8909570B1 (en) 2008-11-07 2014-12-09 Genetic Finance (Barbados) Limited Data mining technique with experience-layered gene pool
US20100145856A1 (en) * 2008-12-08 2010-06-10 Laima Kardokas Automated merchant performance rating for payments on account
CN102422279A (en) * 2009-04-28 2012-04-18 遗传融资(巴巴多斯)有限公司 Class-based distributed evolutionary algorithm for asset management and trading
CN104317771A (en) * 2009-04-28 2015-01-28 遗传融资(巴巴多斯)有限公司 Class-based distributed evolutionary algorithm for asset management and trading
US20100274742A1 (en) * 2009-04-28 2010-10-28 Genetic Finance Holdings Limited AMS Trustees Limited Distributed evolutionary algorithm for asset management and trading
WO2010127042A1 (en) * 2009-04-28 2010-11-04 Genetic Finance (Barbados) Limited Class-based distributed evolutionary algorithm for asset management and trading
US20100274736A1 (en) * 2009-04-28 2010-10-28 Genetic Finance Holdings Limited, AMS Trustees Limited Class-based distributed evolutionary algorithm for asset management and trading
US8527433B2 (en) 2009-04-28 2013-09-03 Genetic Finance (Barbados) Limited Distributed evolutionary algorithm for asset management and trading
US8768811B2 (en) 2009-04-28 2014-07-01 Genetic Finance (Barbados) Limited Class-based distributed evolutionary algorithm for asset management and trading
US20130238399A1 (en) * 2009-11-03 2013-09-12 Sas Institute Inc. Computer-Implemented Systems and Methods for Scenario Analysis
US8504400B2 (en) * 2010-03-24 2013-08-06 International Business Machines Corporation Dynamically optimized distributed cloud computing-based business process management (BPM) system
US11037077B2 (en) 2010-03-24 2021-06-15 International Business Machines Corporation Dynamically optimized distributed cloud computing-based business process management (BPM) system
US20110238458A1 (en) * 2010-03-24 2011-09-29 International Business Machines Corporation Dynamically optimized distributed cloud computing-based business process management (bpm) system
US8533222B2 (en) * 2011-01-26 2013-09-10 Google Inc. Updateable predictive analytical modeling
US20120191630A1 (en) * 2011-01-26 2012-07-26 Google Inc. Updateable Predictive Analytical Modeling
AU2012201530B2 (en) * 2011-03-15 2014-12-18 Accenture Global Services Limited Analytics value assessment toolkit
US20120310684A1 (en) * 2011-06-06 2012-12-06 Carter Michael M System and method of providing cloud-based business valuation services via a mobile app
US8799040B2 (en) * 2011-06-06 2014-08-05 Bizequity Llc Engine, system and method of providing business valuation and database services using alternative payment arrangements
US20140310137A1 (en) * 2011-06-06 2014-10-16 Bizequity Llc Engine, system and method of providing cloud-based business valuation and associated services
US20120310686A1 (en) * 2011-06-06 2012-12-06 Carter Michael M Engine, system and method of providing business valuation and database services using alternative payment arrangements
US20150081355A1 (en) * 2011-06-06 2015-03-19 Michael M. Carter Engine, system and method of providing cloud-based business valuation and associated services
US20120310683A1 (en) * 2011-06-06 2012-12-06 Carter Michael M Engine, system and method of providing cloud-based business valuation and associated rules-based services
US20120310685A1 (en) * 2011-06-06 2012-12-06 Carter Michael M Engine, system and method of providing comparative business valuation analysis
US8977581B1 (en) 2011-07-15 2015-03-10 Sentient Technologies (Barbados) Limited Data mining technique with diversity promotion
US9304895B1 (en) 2011-07-15 2016-04-05 Sentient Technologies (Barbados) Limited Evolutionary technique with n-pool evolution
US9367816B1 (en) 2011-07-15 2016-06-14 Sentient Technologies (Barbados) Limited Data mining technique with induced environmental alteration
US9710764B1 (en) 2011-07-15 2017-07-18 Sentient Technologies (Barbados) Limited Data mining technique with position labeling
US11854083B1 (en) 2011-11-14 2023-12-26 Economic Alchemy Inc. Methods and systems to quantify and index liquidity risk in financial markets and risk management contracts thereon
US11941645B1 (en) 2011-11-14 2024-03-26 Economic Alchemy Inc. Methods and systems to extract signals from large and imperfect datasets
US11599892B1 (en) 2011-11-14 2023-03-07 Economic Alchemy Inc. Methods and systems to extract signals from large and imperfect datasets
US11593886B1 (en) * 2011-11-14 2023-02-28 Economic Alchemy Inc. Methods and systems to quantify and index correlation risk in financial markets and risk management contracts thereon
US11587172B1 (en) 2011-11-14 2023-02-21 Economic Alchemy Inc. Methods and systems to quantify and index sentiment risk in financial markets and risk management contracts thereon
US20140006088A1 (en) * 2011-12-08 2014-01-02 Copperleaf Technologies Inc. Automated scheduling of non-routine maintenance to systems of capital assets
US10025700B1 (en) 2012-07-18 2018-07-17 Sentient Technologies (Barbados) Limited Data mining technique with n-Pool evolution
WO2014105118A1 (en) * 2012-12-28 2014-07-03 Intel Corporation Downlink and uplink interference mitigation in a multicell network using interference cancellation and orthogonal resource allocation
US20140278770A1 (en) * 2013-03-13 2014-09-18 International Business Machines Corporation Generating economic model based on business transaction messages
US20140330600A1 (en) * 2013-05-01 2014-11-06 International Business Machines Corporation Performance Driven Municipal Asset Needs and Sustainability Analysis
US20140330609A1 (en) * 2013-05-01 2014-11-06 International Business Machines Corporation Performance Driven Municipal Asset Needs and Sustainability Analysis
US20140343998A1 (en) * 2013-05-17 2014-11-20 Arthur Brian Andonian Project oriented cash management
US20150039400A1 (en) * 2013-07-31 2015-02-05 Hitachi, Ltd. Business viability evaluation apparatus, business viability evaluation method, and business viability evaluation program
US11288579B2 (en) 2014-01-28 2022-03-29 Cognizant Technology Solutions U.S. Corporation Training and control system for evolving solutions to data-intensive problems using nested experience-layered individual pool
US10268953B1 (en) 2014-01-28 2019-04-23 Cognizant Technology Solutions U.S. Corporation Data mining technique with maintenance of ancestry counts
US9679253B2 (en) 2014-11-06 2017-06-13 Copperleaf Technologies Inc. Methods for maintaining infrastructure equipment and related apparatus
US11663492B2 (en) 2015-06-25 2023-05-30 Cognizant Technology Solutions Alife machine learning system and method
US20170004434A1 (en) * 2015-06-30 2017-01-05 International Business Machines Corporation Determining Individual Performance Dynamics Using Federated Interaction Graph Analytics
US10430429B2 (en) 2015-09-01 2019-10-01 Cognizant Technology Solutions U.S. Corporation Data mining management server
US11151147B1 (en) 2015-09-01 2021-10-19 Cognizant Technology Solutions U.S. Corporation Data mining management server
US11281978B2 (en) 2016-04-08 2022-03-22 Cognizant Technology Solutions U.S. Corporation Distributed rule-based probabilistic time-series classifier
US10956823B2 (en) 2016-04-08 2021-03-23 Cognizant Technology Solutions U.S. Corporation Distributed rule-based probabilistic time-series classifier
US11574202B1 (en) 2016-05-04 2023-02-07 Cognizant Technology Solutions U.S. Corporation Data mining technique with distributed novelty search
US20180040064A1 (en) * 2016-08-04 2018-02-08 Xero Limited Network-based automated prediction modeling
US11250327B2 (en) 2016-10-26 2022-02-15 Cognizant Technology Solutions U.S. Corporation Evolution of deep neural network structures
US11250328B2 (en) 2016-10-26 2022-02-15 Cognizant Technology Solutions U.S. Corporation Cooperative evolution of deep neural network structures
US20180182043A1 (en) * 2016-12-23 2018-06-28 General Electric Company Jet engine asset value analyzer
US11403532B2 (en) 2017-03-02 2022-08-02 Cognizant Technology Solutions U.S. Corporation Method and system for finding a solution to a provided problem by selecting a winner in evolutionary optimization of a genetic algorithm
US10744372B2 (en) * 2017-03-03 2020-08-18 Cognizant Technology Solutions U.S. Corporation Behavior dominated search in evolutionary search systems
US20180250554A1 (en) * 2017-03-03 2018-09-06 Sentient Technologies (Barbados) Limited Behavior Dominated Search in Evolutionary Search Systems
US11247100B2 (en) * 2017-03-03 2022-02-15 Cognizant Technology Solutions U.S. Corporation Behavior dominated search in evolutionary search systems
US11507844B2 (en) 2017-03-07 2022-11-22 Cognizant Technology Solutions U.S. Corporation Asynchronous evaluation strategy for evolution of deep neural networks
US11281977B2 (en) 2017-07-31 2022-03-22 Cognizant Technology Solutions U.S. Corporation Training and control system for evolving solutions to data-intensive problems using epigenetic enabled individuals
US20190066010A1 (en) * 2017-08-24 2019-02-28 United States Of America As Represented By The Secretary Of The Army Predictive model for optimizing facility usage
US11250314B2 (en) 2017-10-27 2022-02-15 Cognizant Technology Solutions U.S. Corporation Beyond shared hierarchies: deep multitask learning through soft layer ordering
US11030529B2 (en) 2017-12-13 2021-06-08 Cognizant Technology Solutions U.S. Corporation Evolution of architectures for multitask neural networks
US11182677B2 (en) 2017-12-13 2021-11-23 Cognizant Technology Solutions U.S. Corporation Evolving recurrent networks using genetic programming
US11003994B2 (en) 2017-12-13 2021-05-11 Cognizant Technology Solutions U.S. Corporation Evolutionary architectures for evolution of deep neural networks
US11527308B2 (en) 2018-02-06 2022-12-13 Cognizant Technology Solutions U.S. Corporation Enhanced optimization with composite objectives and novelty-diversity selection
US11995559B2 (en) 2018-02-06 2024-05-28 Cognizant Technology Solutions U.S. Corporation Enhancing evolutionary optimization in uncertain environments by allocating evaluations via multi-armed bandit algorithms
US11574201B2 (en) 2018-02-06 2023-02-07 Cognizant Technology Solutions U.S. Corporation Enhancing evolutionary optimization in uncertain environments by allocating evaluations via multi-armed bandit algorithms
US12033079B2 (en) 2018-02-08 2024-07-09 Cognizant Technology Solutions U.S. Corporation System and method for pseudo-task augmentation in deep multitask learning
US10560313B2 (en) 2018-06-26 2020-02-11 Sas Institute Inc. Pipeline system for time-series data forecasting
US10685283B2 (en) 2018-06-26 2020-06-16 Sas Institute Inc. Demand classification based pipeline system for time-series data forecasting
US11755979B2 (en) 2018-08-17 2023-09-12 Evolv Technology Solutions, Inc. Method and system for finding a solution to a provided problem using family tree based priors in Bayesian calculations in evolution based optimization
US11669364B2 (en) 2018-12-06 2023-06-06 HashiCorp. Inc. Validation of execution plan for configuring an information technology infrastructure
US11863389B2 (en) 2018-12-06 2024-01-02 HashiCorp Lifecycle management for information technology infrastructure
US11050613B2 (en) * 2018-12-06 2021-06-29 HashiCorp Generating configuration files for configuring an information technology infrastructure
US11973647B2 (en) 2018-12-06 2024-04-30 HashiCorp Validation of execution plan for configuring an information technology infrastructure
US11983544B2 (en) 2018-12-06 2024-05-14 HashiCorp Lifecycle management for information technology infrastructure
US11050625B2 (en) * 2018-12-06 2021-06-29 HashiCorp Generating configuration files for configuring an information technology infrastructure
CN109636621A (en) * 2018-12-17 2019-04-16 泰康保险集团股份有限公司 Method, system, equipment and storage medium for Asset Allocation assessment
CN109636242A (en) * 2019-01-03 2019-04-16 深圳壹账通智能科技有限公司 Enterprise's methods of marking, device, medium and electronic equipment
US11481639B2 (en) 2019-02-26 2022-10-25 Cognizant Technology Solutions U.S. Corporation Enhanced optimization with composite objectives and novelty pulsation
US11669716B2 (en) 2019-03-13 2023-06-06 Cognizant Technology Solutions U.S. Corp. System and method for implementing modular universal reparameterization for deep multi-task learning across diverse domains
US11783195B2 (en) 2019-03-27 2023-10-10 Cognizant Technology Solutions U.S. Corporation Process and system including an optimization engine with evolutionary surrogate-assisted prescriptions
US12026624B2 (en) 2019-05-23 2024-07-02 Cognizant Technology Solutions U.S. Corporation System and method for loss function metalearning for faster, more accurate training, and smaller datasets
US12020163B2 (en) 2020-02-04 2024-06-25 Bank Of America Corporation Knowledge persistent and structurally dynamic neural network
US12099934B2 (en) * 2020-04-07 2024-09-24 Cognizant Technology Solutions U.S. Corporation Framework for interactive exploration, evaluation, and improvement of AI-generated solutions
US20210312297A1 (en) * 2020-04-07 2021-10-07 Cognizant Technology Solutions U.S. Corporation Framework For Interactive Exploration, Evaluation, and Improvement of AI-Generated Solutions
US20230070176A1 (en) * 2020-05-07 2023-03-09 Nowcasting.ai, Inc. Architecture for data processing and user experience to provide decision support
US11416779B2 (en) 2020-05-07 2022-08-16 Nowcasting.ai, Inc. Processing data inputs from alternative sources using a neural network to generate a predictive panel model for user stock recommendation transactions
US11392858B2 (en) 2020-05-07 2022-07-19 Nowcasting.ai, Inc. Method and system of generating a chain of alerts based on a plurality of critical indicators and auto-executing stock orders
US12093795B2 (en) 2020-05-07 2024-09-17 Nowcasting.ai, Inc. Processing data inputs from alternative sources using a neural network to generate a predictive model for user stock recommendation transactions
US11205186B2 (en) 2020-05-07 2021-12-21 Nowcasting.ai, Inc. Artificial intelligence for automated stock orders based on standardized data and company financial data
US12118440B2 (en) 2020-05-07 2024-10-15 Nowcasting.ai, Inc. Automated order execution based on user preference settings utilizing a neural network prediction model
US11775841B2 (en) 2020-06-15 2023-10-03 Cognizant Technology Solutions U.S. Corporation Process and system including explainable prescriptions through surrogate-assisted evolution
CN113114739A (en) * 2021-03-29 2021-07-13 华南理工大学 Method for realizing dynamic selection of file transfer protocol based on cloud storage system
CN112907154A (en) * 2021-04-13 2021-06-04 国网安徽省电力有限公司 Power grid physical asset input-output evaluation method
CN113449403A (en) * 2021-06-28 2021-09-28 江苏省城市规划设计研究院有限公司 Complex network node evaluation method based on hierarchical network division
CN114926204A (en) * 2022-05-11 2022-08-19 北京大学 Data processing device and method based on data value

Also Published As

Publication number Publication date
US20080215386A1 (en) 2008-09-04
US7580848B2 (en) 2009-08-25
US20080313065A1 (en) 2008-12-18
US7693733B2 (en) 2010-04-06

Similar Documents

Publication Publication Date Title
US7693733B2 (en) Method of and system for analyzing, modeling and valuing elements of a business enterprise
US6321205B1 (en) Method of and system for modeling and analyzing business improvement programs
US6393406B1 (en) Method of and system for valving elements of a business enterprise
US20050119922A1 (en) Method of and system for analyzing, modeling and valuing elements of a business enterprise
US20120316904A1 (en) Detailed method of and system for modeling and analyzing business improvement programs
US20080004922A1 (en) Detailed method of and system for modeling and analyzing business improvement programs
US20010034628A1 (en) Detailed method of and system for modeling and analyzing business improvement programs
US20010041995A1 (en) Method of and system for modeling and analyzing business improvement programs
US20010041996A1 (en) Method of and system for valuing elements of a business enterprise
US20020046143A1 (en) Method of and system for evaluating cash flow and elements of a business enterprise
US10839321B2 (en) Automated data storage system
US8185486B2 (en) Segmented predictive model system
US7873567B2 (en) Value and risk management system
US8498915B2 (en) Data processing framework for financial services
US20040215495A1 (en) Method of and system for defining and measuring the elements of value and real options of a commercial enterprise
US20160171398A1 (en) Predictive Model Development System Applied To Enterprise Risk Management
US20160239919A1 (en) Predictive model development system applied to organization management
US20080027841A1 (en) System for integrating enterprise performance management
US20050251468A1 (en) Process management system
US20080015871A1 (en) Varr system
US20090030771A1 (en) Performance management platform
Veyrune et al. Estimation and Determinants of Cost Efficiency: Evidence from Central Bank Operational Expenses
Baker et al. The Concept of Measurement in Financial Reporting
Attri ACCOUNTING FOR MANAGERIAL DECISIONS

Legal Events

Date Code Title Description
AS Assignment

Owner name: ASSET TRUST, INC., WASHINGTON

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:EDER, JEFF;REEL/FRAME:016132/0770

Effective date: 20050613

Owner name: ASSET TRUST, INC.,WASHINGTON

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:EDER, JEFF;REEL/FRAME:016132/0770

Effective date: 20050613

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION

AS Assignment

Owner name: ASSET RELIANCE, INC., WASHINGTON

Free format text: NUNC PRO TUNC ASSIGNMENT;ASSIGNOR:EDER, JEFF;REEL/FRAME:031909/0921

Effective date: 20120623

AS Assignment

Owner name: EDER, JEFFREY, WASHINGTON

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:ASSET RELIANCE INC;REEL/FRAME:040639/0356

Effective date: 20161214