[go: nahoru, domu]

Page MenuHomePhabricator

XiaoXiao-WMF
User

Today

  • Clear sailing ahead.

Tomorrow

  • Clear sailing ahead.

Wednesday

  • Clear sailing ahead.

User Details

User Since
Nov 27 2023, 7:13 PM (39 w, 6 d)
Availability
Available
LDAP User
Unknown
MediaWiki User
XiaoXiao-WMF [ Global Accounts ]

Recent Activity

Mon, Aug 26

XiaoXiao-WMF added a comment to T371658: Codify team processes for research code to Production code.

weekly update:

  • received a number of constructive feedbacks
  • reviewed and discussed around guideline scopes
Mon, Aug 26, 1:12 PM · Research-management, Research
XiaoXiao-WMF added a comment to T365360: adopt production ready code structure.

closed as duplicate of https://phabricator.wikimedia.org/T372707

Mon, Aug 26, 1:08 PM · Research
XiaoXiao-WMF removed Due Date on T365360: adopt production ready code structure.
Mon, Aug 26, 1:05 PM · Research

Thu, Aug 22

XiaoXiao-WMF added a comment to T370895: Build a first draft of a user account reputation score calculation.

It seems that we want to solve two problems - one being classifying good faith vs bad faith, another being the scoring itself which indicates the degree of it

  • In this case, a simple algorithm like logreg would be a good staring point, as the algorithm will set weights to each variable; the algorithm will also output a interpreted probability as the likelihood of a given record is being either 1 (good faith) or 0 (bad faith)
  • The scoring can then be taken from the likelihood directly
Thu, Aug 22, 2:44 PM · Trust and Safety Product Sprint (Sprint Theremin (Aug 26 - Sept. 6)), FY24-25 WE4.2.2 Account reputation score for anti-abuse work
XiaoXiao-WMF added a comment to T371876: Make a labelled dataset for analysing account reputation score.

For "ground truth" data collection, one thing to be careful about is the nature of the good or bad faith data.

Thu, Aug 22, 2:32 PM · Trust and Safety Product Sprint, FY24-25 WE4.2.2 Account reputation score for anti-abuse work

Mon, Aug 19

XiaoXiao-WMF added a comment to T321224: Wikidata Item Quality Model.

from product side:

From my side this would still be very useful to have, especially for tracking how the content evolves over time at scale. It is however less important than the revert risk model for Wikidata.

Mon, Aug 19, 2:34 PM · Essential-Work, Movement-Insights, Research, Linked-Open-Data-Network-Program, Wikidata

Sat, Aug 17

XiaoXiao-WMF created T372707: research code hand-over and resolve requests/comments from research engineers.
Sat, Aug 17, 4:16 PM · Research, Research-Freezer, Epic, Wikidata data quality and trust, Wikidata, address-knowledge-gaps, Knowledge-Integrity
XiaoXiao-WMF added a comment to T368780: Proposal on research to code for production.

no update this week, will pick up this task next week

Sat, Aug 17, 3:23 PM · Research

Wed, Aug 14

XiaoXiao-WMF added a comment to T364486: Update the Research Handbook to clarify how to handle news coverage of our research.

@leila Yes, I have read it, the only question I have is do we (internally) have a criteria on bring a presentation forward as of the stage of the project? There seems to be an implicit understanding of it but not obvious to me...

Wed, Aug 14, 12:49 PM · Research-management, Research-outreach, Research

Tue, Aug 13

XiaoXiao-WMF added a comment to T371658: Codify team processes for research code to Production code.

weekly update:

  • discussed Miriam's feedback and iterated on it
  • obtained more examples from the team to make the guideline as specific and general as possible
Tue, Aug 13, 3:25 PM · Research-management, Research
XiaoXiao-WMF updated subscribers of T370639: [Request] Test if the Language-agnostic revert risk model would work on Wiktionary.

Have spoken to @Samwalton9-WMF and @Trizek. Since this is a low-priority ask, and we expect that the level of vandalism in French wikionary will be fairy low compared to Wikipedias. This ask hasn't been looked into in details by the moderator tool team as per product development work in short term.

Tue, Aug 13, 3:11 PM · Research-Freezer
XiaoXiao-WMF created T372405: Request to host reference needed on Lift Wing.
Tue, Aug 13, 1:43 PM · Lift-Wing, Machine-Learning-Team
XiaoXiao-WMF edited projects for T370639: [Request] Test if the Language-agnostic revert risk model would work on Wiktionary, added: Research-Freezer; removed Research.
Tue, Aug 13, 12:25 PM · Research-Freezer

Fri, Aug 9

XiaoXiao-WMF edited projects for T333892: Develop a new generation of ML models for Wikidata, added: Research-Freezer; removed Research.
Fri, Aug 9, 6:01 PM · Research-Freezer, Epic, Wikidata data quality and trust, Wikidata, address-knowledge-gaps, Knowledge-Integrity
XiaoXiao-WMF added a comment to T333892: Develop a new generation of ML models for Wikidata.

no capacity for rewriting the model at the moment - the model cannot be easily adopted by the current version without creating considerably amount of maintenance

Fri, Aug 9, 6:01 PM · Research-Freezer, Epic, Wikidata data quality and trust, Wikidata, address-knowledge-gaps, Knowledge-Integrity
XiaoXiao-WMF updated subscribers of T321224: Wikidata Item Quality Model.

summary from discussion with Isaac:

  • we have a simple prototype done
  • this prototype needs fairly large amount of pre-computed properties to work effectively in production
  • without feature storage component readily being available today, there is no pathway for sustainable maintenance in production

the points above are mostly infrastructure constrains
@isarantopoulos fyi

Fri, Aug 9, 5:53 PM · Essential-Work, Movement-Insights, Research, Linked-Open-Data-Network-Program, Wikidata

Thu, Aug 8

XiaoXiao-WMF closed T369517: Requesting Kerberos access for xiaoxiao as Resolved.
Thu, Aug 8, 5:34 PM · SRE, SRE-Access-Requests, Data-Engineering
XiaoXiao-WMF added a comment to T369517: Requesting Kerberos access for xiaoxiao.

Okay perfect. Thanks, I will mark this as resolve!

Thu, Aug 8, 5:33 PM · SRE, SRE-Access-Requests, Data-Engineering
XiaoXiao-WMF added a comment to T369517: Requesting Kerberos access for xiaoxiao.

okay, so how can I renew this now? I have passed the 7/22 deadline

Thu, Aug 8, 4:01 PM · SRE, SRE-Access-Requests, Data-Engineering
XiaoXiao-WMF added a comment to T369517: Requesting Kerberos access for xiaoxiao.

HI @SLyngshede-WMF, I have done these steps a while ago, here is what I see - it seems that it is only valid for a few days, does it look right to you?

Thu, Aug 8, 12:27 PM · SRE, SRE-Access-Requests, Data-Engineering

Wed, Aug 7

XiaoXiao-WMF placed T369517: Requesting Kerberos access for xiaoxiao up for grabs.
Wed, Aug 7, 6:16 PM · SRE, SRE-Access-Requests, Data-Engineering
XiaoXiao-WMF reopened T369517: Requesting Kerberos access for xiaoxiao as "Open".
Wed, Aug 7, 6:15 PM · SRE, SRE-Access-Requests, Data-Engineering
XiaoXiao-WMF added a comment to T369517: Requesting Kerberos access for xiaoxiao.

I have followed the email instruction and I have done this step on May 23rd, and now I log into the stat machine I still see this line: "You do not have a valid Kerberos ticket in the credential cache, remember to kinit."

Wed, Aug 7, 6:15 PM · SRE, SRE-Access-Requests, Data-Engineering
XiaoXiao-WMF added a comment to T368613: Essential work - Research tooling.

@fkaelin description changed as per discussion, please report your progress weekly on Fridays. Thanks!

Wed, Aug 7, 5:34 PM · Essential-Work, Research-engineering, Research (FY2024-25-Research-July-September)
XiaoXiao-WMF updated the task description for T368613: Essential work - Research tooling.
Wed, Aug 7, 5:33 PM · Essential-Work, Research-engineering, Research (FY2024-25-Research-July-September)

Tue, Aug 6

XiaoXiao-WMF moved T357038: reference model engineering work from Staged to In Progress on the Research board.
Tue, Aug 6, 7:42 PM · Research, Research-engineering
XiaoXiao-WMF created T371902: Request to host the Reference Need Model on LiftWing.
Tue, Aug 6, 3:16 PM · Lift-Wing, Machine-Learning-Team

Aug 2 2024

XiaoXiao-WMF updated the task description for T371658: Codify team processes for research code to Production code.
Aug 2 2024, 8:51 PM · Research-management, Research
XiaoXiao-WMF added a comment to T371658: Codify team processes for research code to Production code.

weekly update:

Aug 2 2024, 7:46 PM · Research-management, Research

Jul 26 2024

XiaoXiao-WMF added a comment to T357036: References Model: Multilingual Reference Need .

Prepared the code here: https://gitlab.wikimedia.org/repos/research/reference-quality/-/tree/classifiers

ref. need - time performance tested with CPU setting (no batching) on 1000 revisions shows 50% of revisions take <0.70sec for prediction, and 95% of revisions take <6.06sec, refer to the cdf distribution below

image.png (770×980 px, 96 KB)

ref.risk - annotating additional 1000 domains

Jul 26 2024, 5:27 PM · Research
XiaoXiao-WMF added a comment to T340693: Align on high level direction of ML/AI development in the coming years.

a comment for language support

Jul 26 2024, 1:31 PM · Essential-Work, Research

Jul 19 2024

XiaoXiao-WMF added a comment to T368780: Proposal on research to code for production.

weekly update:

  • thanks for Miriam's feedback, a few adjustments added
Jul 19 2024, 3:16 PM · Research
XiaoXiao-WMF added a comment to T362373: Prepare and finalize the FY25 annual plan for knowledge integrity program, research engineering unit and your team.

weekly update:

  • deliverables for the remaining two essential work tasks are being finalized, though there are back-and-forth on details that have not been agreed up on. Will finalized on Monday.
Jul 19 2024, 3:12 PM · Research (FY2024-25-Research-July-September), Research-management

Jul 12 2024

XiaoXiao-WMF updated the task description for T360195: Analyze IP reputation data and how it maps to on-wiki editing and account creation activity.
Jul 12 2024, 1:56 PM · User-kostajh, Trust and Safety Product Team, IP-Blocking-Impacts
XiaoXiao-WMF added a comment to T362373: Prepare and finalize the FY25 annual plan for knowledge integrity program, research engineering unit and your team.

weekly update:

Jul 12 2024, 11:42 AM · Research (FY2024-25-Research-July-September), Research-management

Jul 9 2024

XiaoXiao-WMF changed the status of T361929: [Research Engineering Request] Building end-to-end training pipeline for the add-a-link model from Open to In Progress.
Jul 9 2024, 10:50 PM · Research (FY2024-25-Research-July-September), Research-engineering
XiaoXiao-WMF triaged T368613: Essential work - Research tooling as High priority.
Jul 9 2024, 10:49 PM · Essential-Work, Research-engineering, Research (FY2024-25-Research-July-September)
XiaoXiao-WMF triaged T368614: Essential work - model quantization as Medium priority.
Jul 9 2024, 10:49 PM · Essential-Work, Research-engineering, Research (FY2024-25-Research-July-September)
XiaoXiao-WMF triaged T368389: WE4.3.1 - IP traffic as High priority.
Jul 9 2024, 10:47 PM · Knowledge-Integrity, OKR-Work, Research (FY2024-25-Research-July-September)
leila awarded T368780: Proposal on research to code for production a Love token.
Jul 9 2024, 10:42 PM · Research
XiaoXiao-WMF added a comment to T368780: Proposal on research to code for production.

initial document:
https://docs.google.com/document/d/1Va6owaYtpx9eNMB0ZkhHS_iTDQhzj2NHYnsdq7QVjZY/edit?pli=1#heading=h.63vmzm9jkjni

Jul 9 2024, 10:34 PM · Research
XiaoXiao-WMF changed the status of T368780: Proposal on research to code for production from Open to In Progress.
Jul 9 2024, 10:33 PM · Research
XiaoXiao-WMF reassigned T368388: WE4.2.1 - Unique Device from fkaelin to Pablo.
Jul 9 2024, 4:28 PM · OKR-Work, Knowledge-Integrity, FY24-25 WE4.2.1 Unique device identification model, Research (FY2024-25-Research-July-September), Research-engineering
XiaoXiao-WMF changed the status of T368388: WE4.2.1 - Unique Device from Open to In Progress.
Jul 9 2024, 3:40 PM · OKR-Work, Knowledge-Integrity, FY24-25 WE4.2.1 Unique device identification model, Research (FY2024-25-Research-July-September), Research-engineering
XiaoXiao-WMF moved T333892: Develop a new generation of ML models for Wikidata from FY2024-25-Research-July-September to Backlog on the Research board.
Jul 9 2024, 3:35 PM · Research-Freezer, Epic, Wikidata data quality and trust, Wikidata, address-knowledge-gaps, Knowledge-Integrity
XiaoXiao-WMF changed the status of T333892: Develop a new generation of ML models for Wikidata from Open to In Progress.
Jul 9 2024, 3:35 PM · Research-Freezer, Epic, Wikidata data quality and trust, Wikidata, address-knowledge-gaps, Knowledge-Integrity
XiaoXiao-WMF added a comment to T333892: Develop a new generation of ML models for Wikidata.

reopening this task as research engineering and deployment component is not done yet.

Jul 9 2024, 3:31 PM · Research-Freezer, Epic, Wikidata data quality and trust, Wikidata, address-knowledge-gaps, Knowledge-Integrity
XiaoXiao-WMF reopened T333892: Develop a new generation of ML models for Wikidata as "Open".
Jul 9 2024, 3:28 PM · Research-Freezer, Epic, Wikidata data quality and trust, Wikidata, address-knowledge-gaps, Knowledge-Integrity
XiaoXiao-WMF assigned T368389: WE4.3.1 - IP traffic to Pablo.
Jul 9 2024, 3:20 PM · Knowledge-Integrity, OKR-Work, Research (FY2024-25-Research-July-September)
XiaoXiao-WMF assigned T368613: Essential work - Research tooling to MunizaA.
Jul 9 2024, 3:19 PM · Essential-Work, Research-engineering, Research (FY2024-25-Research-July-September)
XiaoXiao-WMF assigned T368614: Essential work - model quantization to MunizaA.
Jul 9 2024, 3:18 PM · Essential-Work, Research-engineering, Research (FY2024-25-Research-July-September)

Jul 8 2024

XiaoXiao-WMF created T369519: Grant Access to wmf for xiaoxiao.
Jul 8 2024, 2:18 PM · SRE, LDAP-Access-Requests
XiaoXiao-WMF created T369517: Requesting Kerberos access for xiaoxiao.
Jul 8 2024, 2:11 PM · SRE, SRE-Access-Requests, Data-Engineering

Jun 28 2024

XiaoXiao-WMF created T368780: Proposal on research to code for production.
Jun 28 2024, 7:25 PM · Research
XiaoXiao-WMF moved T368274: [W.E.1.2.4] Detecting Peacock behavior with LLMs from Backlog to FY2024-25-Research-July-September on the Research board.
Jun 28 2024, 6:31 PM · Research (FY2024-25-Research-July-September)
XiaoXiao-WMF assigned T368388: WE4.2.1 - Unique Device to fkaelin.
Jun 28 2024, 6:30 PM · OKR-Work, Knowledge-Integrity, FY24-25 WE4.2.1 Unique device identification model, Research (FY2024-25-Research-July-September), Research-engineering
XiaoXiao-WMF moved T362373: Prepare and finalize the FY25 annual plan for knowledge integrity program, research engineering unit and your team from FY2023-24-Research-April-June to FY2024-25-Research-July-September on the Research board.
Jun 28 2024, 6:28 PM · Research (FY2024-25-Research-July-September), Research-management
XiaoXiao-WMF changed Due Date from Jun 14 2024, 12:00 AM to Aug 1 2024, 12:00 AM on T362373: Prepare and finalize the FY25 annual plan for knowledge integrity program, research engineering unit and your team.
Jun 28 2024, 6:28 PM · Research (FY2024-25-Research-July-September), Research-management
XiaoXiao-WMF closed T351009: Develop an ML training workflow for ongoing work as Resolved.
Jun 28 2024, 6:26 PM · Research-engineering, Research (FY2023-24-Research-April-June)
XiaoXiao-WMF added a comment to T351009: Develop an ML training workflow for ongoing work.

closing the ticket to mark the conclusion of the PoC on this.

Jun 28 2024, 6:25 PM · Research-engineering, Research (FY2023-24-Research-April-June)
XiaoXiao-WMF moved T361929: [Research Engineering Request] Building end-to-end training pipeline for the add-a-link model from FY2023-24-Research-April-June to FY2024-25-Research-July-September on the Research board.
Jun 28 2024, 6:21 PM · Research (FY2024-25-Research-July-September), Research-engineering
XiaoXiao-WMF set Due Date to Jul 12 2024, 4:00 AM on T361929: [Research Engineering Request] Building end-to-end training pipeline for the add-a-link model.
Jun 28 2024, 6:21 PM · Research (FY2024-25-Research-July-September), Research-engineering
XiaoXiao-WMF added a comment to T361929: [Research Engineering Request] Building end-to-end training pipeline for the add-a-link model.

most of the work is done, what's left is to resolve comments on the MR above. Will resolve this task mid-July ...

Jun 28 2024, 6:21 PM · Research (FY2024-25-Research-July-September), Research-engineering
XiaoXiao-WMF added a comment to T357038: reference model engineering work.

dependency on https://phabricator.wikimedia.org/T357036 will start once this task is concluded

Jun 28 2024, 6:19 PM · Research, Research-engineering
XiaoXiao-WMF set Due Date to Mon, Sep 30, 4:00 AM on T357038: reference model engineering work.
Jun 28 2024, 6:18 PM · Research, Research-engineering
XiaoXiao-WMF moved T357038: reference model engineering work from FY2023-24-Research-April-June to FY2024-25-Research-July-September on the Research board.
Jun 28 2024, 6:18 PM · Research, Research-engineering
XiaoXiao-WMF moved T357316: Develop pipelines for research datasets - Q3/Q4 from FY2023-24-Research-April-June to FY2024-25-Research-July-September on the Research board.
Jun 28 2024, 6:17 PM · Research (FY2024-25-Research-July-September), Research-engineering
XiaoXiao-WMF added a comment to T357316: Develop pipelines for research datasets - Q3/Q4.

@MunizaA any comments please put in the ticket and please close this out

Jun 28 2024, 6:17 PM · Research (FY2024-25-Research-July-September), Research-engineering
XiaoXiao-WMF closed T362526: Model quantization (research infra) as Resolved.

will continue under our essential work for model quantization in q1

Jun 28 2024, 6:16 PM · Research-engineering, Research (FY2023-24-Research-April-June)

Jun 27 2024

XiaoXiao-WMF assigned T364852: Feedback on Edge Uniques draft design document to fkaelin.
Jun 27 2024, 12:42 PM · OKR-Work, Research
XiaoXiao-WMF moved T364852: Feedback on Edge Uniques draft design document from Backlog to Staged on the Research board.
Jun 27 2024, 12:42 PM · OKR-Work, Research
XiaoXiao-WMF added a comment to T351118: [Research Engineering Request] Produce regular snapshots of all Wikipedia article topics.

Muniza has completed the last bit of the task:
https://gitlab.wikimedia.org/repos/data-engineering/airflow-dags/-/blob/4062396de9545939e8e892003f14ecb8344f933f/research/dags/article_topics_dag.py

Jun 27 2024, 12:36 PM · Research-engineering, Research
XiaoXiao-WMF added a subtask for T368615: technical debt and process enhancement: T366528: Deployment of model updates .
Jun 27 2024, 12:35 PM · Research-engineering, Research
XiaoXiao-WMF added a parent task for T366528: Deployment of model updates : T368615: technical debt and process enhancement.
Jun 27 2024, 12:35 PM · Research-engineering, Machine-Learning-Team, Research
XiaoXiao-WMF renamed T368615: technical debt and process enhancement from technical debt - code refactor for in-prod models to technical debt and process enhancement.
Jun 27 2024, 12:34 PM · Research-engineering, Research
XiaoXiao-WMF added a parent task for T367446: Consolidate duplicated configuration/constants: T368615: technical debt and process enhancement.
Jun 27 2024, 12:30 PM · Research-engineering, Research
XiaoXiao-WMF added a subtask for T368615: technical debt and process enhancement: T367446: Consolidate duplicated configuration/constants.
Jun 27 2024, 12:30 PM · Research-engineering, Research
XiaoXiao-WMF created T368615: technical debt and process enhancement.
Jun 27 2024, 12:28 PM · Research-engineering, Research
XiaoXiao-WMF set Due Date to Mon, Sep 30, 4:00 AM on T368614: Essential work - model quantization.
Jun 27 2024, 12:26 PM · Essential-Work, Research-engineering, Research (FY2024-25-Research-July-September)
XiaoXiao-WMF created T368614: Essential work - model quantization.
Jun 27 2024, 12:26 PM · Essential-Work, Research-engineering, Research (FY2024-25-Research-July-September)
XiaoXiao-WMF edited projects for T368388: WE4.2.1 - Unique Device , added: Research (FY2024-25-Research-July-September); removed Research.
Jun 27 2024, 12:25 PM · OKR-Work, Knowledge-Integrity, FY24-25 WE4.2.1 Unique device identification model, Research (FY2024-25-Research-July-September), Research-engineering
XiaoXiao-WMF edited projects for T368388: WE4.2.1 - Unique Device , added: Research; removed Research (FY2024-25-Research-July-September).
Jun 27 2024, 12:23 PM · OKR-Work, Knowledge-Integrity, FY24-25 WE4.2.1 Unique device identification model, Research (FY2024-25-Research-July-September), Research-engineering
XiaoXiao-WMF added a project to T368613: Essential work - Research tooling: Research-engineering.
Jun 27 2024, 12:22 PM · Essential-Work, Research-engineering, Research (FY2024-25-Research-July-September)
XiaoXiao-WMF created T368613: Essential work - Research tooling.
Jun 27 2024, 12:21 PM · Essential-Work, Research-engineering, Research (FY2024-25-Research-July-September)

Jun 25 2024

XiaoXiao-WMF created T368389: WE4.3.1 - IP traffic.
Jun 25 2024, 11:38 AM · Knowledge-Integrity, OKR-Work, Research (FY2024-25-Research-July-September)
XiaoXiao-WMF edited projects for T368388: WE4.2.1 - Unique Device , added: Research (FY2024-25-Research-July-September); removed Research-collaborations, Research.
Jun 25 2024, 11:36 AM · OKR-Work, Knowledge-Integrity, FY24-25 WE4.2.1 Unique device identification model, Research (FY2024-25-Research-July-September), Research-engineering
XiaoXiao-WMF set Due Date to Mon, Sep 30, 4:00 AM on T368388: WE4.2.1 - Unique Device .
Jun 25 2024, 11:23 AM · OKR-Work, Knowledge-Integrity, FY24-25 WE4.2.1 Unique device identification model, Research (FY2024-25-Research-July-September), Research-engineering
XiaoXiao-WMF edited projects for T368388: WE4.2.1 - Unique Device , added: Research, Research-collaborations, Research-engineering; removed Research (FY2024-25-Research-July-September).
Jun 25 2024, 11:23 AM · OKR-Work, Knowledge-Integrity, FY24-25 WE4.2.1 Unique device identification model, Research (FY2024-25-Research-July-September), Research-engineering
XiaoXiao-WMF created T368388: WE4.2.1 - Unique Device .
Jun 25 2024, 11:22 AM · OKR-Work, Knowledge-Integrity, FY24-25 WE4.2.1 Unique device identification model, Research (FY2024-25-Research-July-September), Research-engineering

Jun 24 2024

XiaoXiao-WMF added a comment to T367757: Request to add mnz to analytics-research-admins.

Do we have an estimate of when this access can be given to Muniza?
My understanding is that we are sort of blocked by this access, if it can be resolved sooner that would be appreciated. Thanks!

Jun 24 2024, 3:28 PM · Patch-For-Review, SRE, SRE-Access-Requests

Jun 19 2024

XiaoXiao-WMF moved T367551: Cloud VPS "research-collaborations-api" project Buster deprecation from Backlog to In Progress on the Research board.
Jun 19 2024, 10:56 PM · Research, Cloud-VPS (Debian Buster Deprecation)
XiaoXiao-WMF changed the status of T367551: Cloud VPS "research-collaborations-api" project Buster deprecation from Open to In Progress.
Jun 19 2024, 9:27 PM · Research, Cloud-VPS (Debian Buster Deprecation)

Jun 17 2024

XiaoXiao-WMF added a comment to T362373: Prepare and finalize the FY25 annual plan for knowledge integrity program, research engineering unit and your team.

weekly update:

Jun 17 2024, 12:42 AM · Research (FY2024-25-Research-July-September), Research-management

Jun 10 2024

XiaoXiao-WMF added a comment to T361929: [Research Engineering Request] Building end-to-end training pipeline for the add-a-link model.

to review https://gitlab.wikimedia.org/repos/research/research-datasets/-/merge_requests/31

Jun 10 2024, 3:11 PM · Research (FY2024-25-Research-July-September), Research-engineering
XiaoXiao-WMF added a comment to T357316: Develop pipelines for research datasets - Q3/Q4.

airflow done, will merge this week

Jun 10 2024, 3:07 PM · Research (FY2024-25-Research-July-September), Research-engineering
XiaoXiao-WMF added a project to T351009: Develop an ML training workflow for ongoing work: Research-engineering.
Jun 10 2024, 3:03 PM · Research-engineering, Research (FY2023-24-Research-April-June)
XiaoXiao-WMF added a project to T361929: [Research Engineering Request] Building end-to-end training pipeline for the add-a-link model: Research-engineering.
Jun 10 2024, 3:02 PM · Research (FY2024-25-Research-July-September), Research-engineering
XiaoXiao-WMF added a comment to T357038: reference model engineering work.

still in research phase

Jun 10 2024, 3:02 PM · Research, Research-engineering
XiaoXiao-WMF added a project to T357038: reference model engineering work: Research-engineering.
Jun 10 2024, 3:02 PM · Research, Research-engineering
XiaoXiao-WMF added a project to T357316: Develop pipelines for research datasets - Q3/Q4: Research-engineering.
Jun 10 2024, 3:02 PM · Research (FY2024-25-Research-July-September), Research-engineering